About this file

Amendment 0001 Summary of Changes

View the file

Other files

File Type Posted
W911WN09D0020.pdf PDF
W911WN09D0021.pdf PDF
W911WN09D0019 Task Order 0001.pdf PDF
W911WN09D0022.pdf PDF
W911WN09D0019.pdf PDF
W911WN09R0009 Amendment 0002.doc DOC document
01 50 10.pdf PDF
01 11 00.pdf PDF
01 22 00.00 15.pdf PDF
PROJECT INFORMATION WORKSHEET.doc DOC document
Proposal Data Sheet.doc DOC document
Price Amend1.xls XLS spreadsheet
W911WN-09-R-0009.zip ZIP file
Initial Task Order Request.pdf PDF
W911WN09R0009 Technical Specs for TO.pdf PDF
W911WN09R0009.pdf PDF
Technical Specifications.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The following have been added by full text:

CHANGES TO PLANS & SPECS

Change made to PLANS:

There is a drawing omisson on C-507 Headwall Elevation. The height of the concrete above the top of the 3’ – 0” pipe on Section D should be 1’ – 0”. All other dimensions remain unchanged.

Changes made to Techncial Specifications for Task Order:

General Requirements, Summary of Work, Section 01 11 00 delete in its entirety and replace with revised pages attached.

General Requirements, Measurement and Payment, Section 01 22 00.00 15 delete in its entirety and replace with revised pages attached.

General Requirements, Project Signs, Section 01 50 10 attach new pages.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 22-Jun-2009 02:00 PM to 24-Jun-2009 02:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been added by full text:

CHANGES

Page 14 General Requirements.

Paragraph 3 ( b ), Second paragraph should be Paragraph ( c ) – change to read, “If required, proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source…..”

Page 15 Submission Format

TAB D – Add attached form, Proposal Data Sheet.

Page 16 General Requirements.

TAB 1 – Factor 1: Construction Past Performance, Paragraph ( c ) Second paragraph:

Remove next to last sentence – “The evaluation form shall be provided to the Contract Specialist directly from the reference.”

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

QUESTIONS AND ANSWERS

Questions and Answers for W911WN-09-R-0009, IDIQ Construction/Tionesta

1. Page 14, Proposal Preparation, Requirement 3, Section b, Paragraph 2 – proposal revisions are discussed. What is this trying to explain? What revisions? Please clarify.

Response – when an amendment is issued to the solicitation, the new pages with the changes are marked with a statement on bottom of page, “revised by Amendment”; when submitting the proposal, make sure the revised pages are attached if required.

2. Page 15, Proposal Preparation, Requirement 5, Format, TAB C. If online reps and certs are filled out, do the reps and certs still have to be provided with the proposal?

Response – No, as long as you have complied with the clauses in Section 00600 of the solicitation.

3. Page 16, past performance questionnaires. Is it allowable to request questionnaires be filled out by USACE, Pittsburgh personnel for past performance?

Response - Yes

4. Pages 19 – 22, Project and performance forms. Can the excel version of these forms be placed on FBO site for contractor download?

Response – Yes, MS Word versions are included with this amendment

5. Page 15, TAB D proposal data sheet. It notes to see the format provided in this section, but I can’t find any form or layout.

Response – Form is included with this amendment

6. Is Section 00100 considered to be pages 3 thru 5 or pages 3 thru 28? There are no section notes at the bottom of each page.

Response – Pages 3 thru 28

7. Will there be a bid schedule provided at a later date for the sample project or should it be placed in the year one amount on page 3?

Response – Yes, revised bid schedule is included in this amendment, to be completed and sent in with proposal. Do not complete pages 3 thru 5 of solicitation – is for information only.

8. Page 16, past performance questionnaires, for each project that does not have a final CCASS evaluation, offerors shall provide a questionnaire to the point of contact, clearly identifying the project to be evaluated. A sample past performance evaluation questionnaire is included at the end of this section. When completed, these forms shall be included with the proposal. The evaluation form shall be provided to the Contract Specialist directly from the reference. Should we ask our contacts to provide an original to the Contract Specialist and send a copy to us for inclusion in the proposal?

Response – No, change is made to paragraph; remove sentence of providing evaluation forms to Contract Specialist. Questionnaries are to be submitted with proposal.

(End of Summary of Changes)