W911WN-09-B-0025 Amend 02.pdf

PDF 84 KB Posted

Attached to
RECOVERY--Z--Upgrade the emergency generator at Pike Island Lock and Dam.
Solicitation number
W911WN09B0025
Issued by

About this file

Amendment 02

View the file

Other files

File Type Posted
BidResults for 09B0025.doc DOC document
01 22 00.00 10.pdf PDF
W911WN-09-B-0025-0001.zip ZIP file
03 30 53.pdf PDF
01 45 01.pdf PDF
W911WN-09-B-0025 Amend 01.pdf PDF
W911WN-09-B-0025.zip ZIP file
Solicitation W911WN-09-B-0025.pdf PDF
Technical Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET491776311

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Re: Upgrade the Emergency Generator at Pike Island Lock & Dam

This amendment is issued to incorporate the modified Wage Rates WV080002 08/07/2009.

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

J 1 29

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0025

X 9B. DATED (SEE ITEM 11)

06-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

WAGE RATES

General Decision Number: WV080002 08/07/2009 WV2

Superseded General Decision Number: WV20070002

State: West Virginia

Construction Type: Building

Counties: Barbour, Braxton, Brooke, Cabell, Calhoun, Doddridge, Gilmer, Grant, Hampshire, Hancock, Hardy, Harrison, Jackson, Kanawha, Lewis, Marion, Marshall, Mason, Mineral, Monongalia, Morgan, Ohio, Pendleton, Pleasants, Preston, Putnam, Randolph, Ritchie, Roane, Taylor, Tucker, Tyler, Upshur, Wayne, Webster, Wetzel, Wirt and Wood Counties in West Virginia.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes and apartments up to and including 4 stories). See Heavy and Highway Construction General Wage determination for all work in connection with the clearing and grading of site, also all paving incidental to the project, and all incidental water lines, sewers and other utilities to within 5 feet of the building line)

Modification Number Publication Date 0 02/08/2008 1 02/22/2008 2 03/21/2008 3 04/11/2008 4 05/02/2008 5 06/20/2008 6 06/27/2008 7 07/04/2008 8 07/18/2008 9 08/08/2008 10 09/19/2008 11 11/07/2008 12 12/05/2008 13 01/02/2009 14 02/06/2009 15 03/06/2009 16 03/20/2009

17 04/03/2009 18 05/01/2009 19 06/05/2009 20 07/03/2009 21 08/07/2009

ASBE0002-003 08/01/2008

BROOKE, HANCOCK, HARRISON, MARION, MARSHALL,MINERAL, OHIO,

TYLER AND WETZEL COUNTIES

Rates Fringes

Asbestos Workers/Insulator.......$ 33.17 17.76

SCOPE OF WORK:

Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.

ASBE0080-001 03/02/2009

BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, JACKSON, KANAWHA,

LEWIS, MASON, PLEASANTS, PUTNAM, RITCHIE, ROANE, UPSHUR, WAYNE,

WIRT AND WOOD COUNTIES.

Asbestos/Insulator Worker........$ 30.00 16.17

SCOPE OF WORK:

Includes application of all insulating materials, protective coverings and finishings to all types of mechanical systems.

BOIL0045-003 10/01/2008

GRANT COUNTY

Rates Fringes

BOILERMAKER......................$ 30.96 16.87

BOIL0154-003 06/01/2008

BROOKE AND HANCOCK COUNTIES

Rates Fringes

BOILERMAKER......................$ 33.90 22.07

BOIL0667-001 10/01/2008

BARBOUR, BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER,

HAMPSHIRE, HARDY, HARRISON, JACKSON, KANAWHA, LEWIS, MARION,

MARSHALL, MASON, MINERAL, MORGAN, MONONGALIA, OHIO, PENDLETON,

PLEASANTS, PRESTON, PUTNAM, RANDOLPH, RITCHIE, ROANE, TAYLOR,

TUCKER, TYLER, UPSHUR, WAYNE, WEBSTER, WETZEL, WIRT AND WOOD

COUNTIES.

BOILERMAKER......................$ 34.69 15.32

BRMD0006-003 06/01/2008

MINERAL COUNTY

Rates Fringes

BRICKLAYER (Brick, Stone, Marble, Mosaic, Pointers, Caulkers, Artifical, Tilesetters and Terrazzo workers).........................$ 26.52 11.60

BRWV0001-001 07/01/2008

MARSHALL, OHIO, TYLER AND WETZEL COS.

Rates Fringes

BRICKLAYER.......................$ 25.10 12.19

TILE SETTER......................$ 25.10 12.19

BRWV0006-003 06/01/2008

CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT AND WOOD COS.

Rates Fringes

BRICKLAYER.......................$ 25.04 11.70

TILE SETTER......................$ 24.54 11.70

BRWV0009-002 12/01/2008

BRAXTON, KANAWHA AND PUTNAM COS.

Rates Fringes

Bricklayer, Stonemason...........$ 26.54 14.40 Marble, Tile Layer & Terrazzo Worker...........................$ 26.54 14.40

BRWV0011-001 07/01/2008

BROOKE AND HANCOCK COS.

BRICKLAYER

Industrial..................$ 27.51 12.30 All other work..............$ 25.64 12.30

TILE SETTER......................$ 23.74 12.30

BRWV0015-002 12/01/2008

DODDRIDGE, GILMER, HARRISON, LEWIS, MARION AND UPSHUR COUNTIES

Rates Fringes

BRICKLAYER

Commercial..................$ 26.83 11.85 Industrial..................$ 28.35 11.85

BRWV0015-005 12/01/2008

BARBOUR, DODDRIDGE, GILMER, HARDY, HARRISON, LEWIS,MARION,

MONONGALIA, PRESTON, TAYLOR,TUCKER AND UPSHUR COUNTIES

Cement Masons:

Commerial...................$ 26.83 11.85 Industrial..................$ 28.35 11.85

BRWV0015-006 12/01/2007

CALHOUN, JACKSON, PLEASANTS, RITCHIE, ROANE, WIRT, AND WOOD

Counties

Marble & Tile Finisher...........$ 21.40 7.07

* CARP0003-003 12/01/2008

BROOKE, HANCOCK, MARSHALL (North of 39 degrees 46' latitude) and OHIO COUNTIES

Carpenters: (carpet, drywall, lather, and soft tile installers)......................$ 23.07 11.62

* CARP0302-001 06/01/2008

BUILDING

CABELL and WAYNE COUNTIES

Carpenter & Soft Floor Layer.....$ 27.31 13.61

PILEDRIVERMAN....................$ 27.31 13.61

* CARP0476-001 12/01/2008

BRAXTON, DODDRIDGE, GILMER, HARRISON, LEWIS, MARION, UPSHUR,

and WEBSTER COUNTIES

CARPENTER (carpet, drywall and soft tile installers)........$ 23.56 11.79 Piledriver.......................$ 23.56 11.79

* CARP0604-003 12/01/2008

BARBOUR, MONOGALIA, PRESTON, RANDOLPH, TAYLOR, and TUCKER

COUNTIES

Carpenter......................$ 23.56 11.79

* CARP0899-001 06/01/2008

CALHOUN, PLEASANTS, RITCHIE, TYLER, WIRT, and WOOD COUNTIES

Rates Fringes

Carpenters: (Soft Tile & Carpet Installers, Drywall installers)......................$ 25.00 11.44

PILEDRIVERMAN....................$ 25.00 11.44

CARP1024-003 05/01/2008

GRANT, HAMPSHIRE, HARDY, AND PENDLETON COUNTIES

Rates Fringes

CARPENTER (dry wall hangers and soft layers).................$ 24.95 9.75

CARP1024-006 05/01/2008

MINERAL AND MORGAN COUNTIES

CARPENTER........................$ 24.95 9.75

* CARP1159-001 12/01/2008

JACKSON and MASON COUNTIES

Rates Fringes

CARPENTER........................$ 26.16 13.45

* CARP1207-006 12/01/2008

KANAWHA, PUTNAM, and ROANE COUNTIES

Rates Fringes

CARPENTER........................$ 26.16 13.45

Pile Driver......................$ 26.16 13.45

CARP1519-001 06/01/2009

CABELL AND WAYNE COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 30.11 14.14

* CARP1755-001 12/01/2008

BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,

KANAWHA,LEWIS, MARION, MASON, PLEASANTS, PUTNAM, RITCHIE,

ROANE, TYLER, UPSHUR, WETZEL, WIRT AND WOOD COUNTIES

MILLWRIGHT.......................$ 29.25 14.20

CARP1871-019 05/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Rates Fringes

MILLWRIGHT.......................$ 26.96 12.14

CARP2235-009 01/01/2009

BROOKE, HANCOCK, MARSHALL, OHIO & WETZEL COUNTIES

Rates Fringes

PILEDRIVERMAN....................$ 28.85 12.10

ELEC0026-010 11/07/2005

HARDY COUNTY

Rates Fringes

ELECTRICIAN......................$ 21.71 7.80

ELEC0141-001 09/01/2008

BROOKE (Buffalo Twp. only) MARSHALL, OHIO AND WETZEL COUNTIES

Rates Fringes

CABLE SPLICER....................$ 26.51 18.60

ELECTRICIAN......................$ 26.26 18.60

ELEC0141-002 09/01/2008

BROOKE (Buffalo Twp. only), MARSHALL, OHIO, AND WETZEL COUNTIES

Rates Fringes

Line Construction:

Cable Splicer...............$ 26.51 18.30 Groundsman..................$ 21.00 18.09 Lineman, Equipment Operator.$ 26.26 18.29

ELEC0246-003 10/29/2007

BROOKE (Except Buffalo Township), HANCOCK COUNTIES

Rates Fringes

ELECTRICIAN......................$ 31.00 18.29

FOOTNOTE: a. 1 1/2 Paid Holidays: The last scheduled workday prior to Christmas & 4 hours on Good Friday

ELEC0246-005 11/01/2004

BROOKE (Except Buffalo Twp.)AND HANCOCK COUNTIES

Rates Fringes

Line Construction:

Groundman...................$ 18.70 51.5%+a Lineman, Line Equipment Operator, and Truck Driver..$ 28.00 51.5%+a

FOOTNOTE: a. 1-1/2 Paid Holidays: The last scheduled workday prior to Christmas Day and 4 Hours on Good Friday.

ELEC0307-003 12/01/2007

GRANT, HAMPSHIRE, MINERAL and MORGAN COUNTIES

ELECTRICIAN......................$ 26.20 13.25

ELEC0307-004 12/03/2007

MINERAL COUNTY

Rates Fringes

Equipment Operator...............$ 24.89 13.25 Linemen..........................$ 26.20 13.25

TRUCK DRIVER.....................$ 17.03 13.25

ELEC0317-001 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

CABLE SPLICER....................$ 32.68 18.13

ELECTRICIAN......................$ 31.12 18.08

* ELEC0317-009 05/25/2009

BRAXTON, CABELL, CALHOUN, GILMER, KANAWHA, MASON, PUTNAM,

ROANE, AND WAYNE COUNTIES

Line Construction:

Cable Splicer...............$ 30.49 16.64 Equipment Operator..........$ 21.70 15.17 Groundman...................$ 17.61 15.01 Lineman.....................$ 27.15 15.37

ELEC0466-001 06/01/2008

BRAXTON, CALHOUN, GILMER, KANAWHA, PUTNAM, ROANE AND WEBSTER

CABLE SPLICER....................$ 33.50 13.71

ELECTRICIAN......................$ 30.45 13.61

ELEC0596-001 06/01/2008

BARBOUR, DODDRIDGE, HARRISON, LEWIS, MARION, MONONGALIA,

PENDLETON, PRESTON, RANDOLPH, TAYLOR, TUCKER, AND UPSHUR COS.

CABLE SPLICER....................$ 31.82 17.15

ELECTRICIAN......................$ 28.93 17.07

ELEC0596-002 06/01/2006

DODDRIDGE, LEWIS, MARION, AND UPSHUR COUNTIES

Rates Fringes

Line Construction:

Cable Splicers..............$ 26.46 15.74 Groundman & Truck Drivers...$ 19.24 15.53 Lineman & Equipment Op......$ 24.05 15.67

ELEC0968-002 06/01/2008

JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES

Rates Fringes

Line Construction:

Groundman...................$ 21.37 3%+16.16 Lineman, Equipment Operator, and Cable Splicer.$ 28.81 16.71

ELEC0968-003 06/01/2008

JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COUNTIES.

Rates Fringes

ELECTRICIAN......................$ 28.81 16.71

ELEV0006-002 01/01/2008

BROOKE, HANCOCK, MARION, MARSHALL, OHIO AND WETZEL COUNTIES:

Rates Fringes

Elevator Constructor.............$ 37.65 16.285+A&B

Paid Holidays:

New Year's Day; Memorial Day; Independence Day; Labor Day;

Verterans Dayl; Thanksgiving day; the Friday after Thanksgiving Day; and Christmas Day.

Footnotes:

a. Employee contributes 8% of basic hourly rate for 5 years or more of service or 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ELEV0048-001 01/01/2009

BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON,

KANAWHA, LEWIS, MASON, MINERAL, PLEASANTS, PUTNAM, RITCHIE,

ROANE, TYLER, PSHUR, WAYNE, WIRT AND WOOD COUNTIES

Elevator Constructor.............$ 37.30 18.285

PAID HOLIDAYS: a. New Year's Day; Memorial Day;

Independence Day; Labor Day; Thanksgiving Day; Christmas Day. Employer contributes 8% of the basic hourly rate for 5 years or more of service or 6% of the basic hourly rate for 6 months to 5 years of service as vacation pay credit.

ENGI0132-001 12/01/2008

POWER EQUIPMENT OPERATORS:

Rates Fringes

Power equipment operators:

GROUP 1.....................$ 28.76 16.53

GROUP 2.....................$ 28.41 16.53

GROUP 3.....................$ 27.41 16.53

GROUP 4.....................$ 21.41 16.53

GROUP 1: All friction cranes, derricks, tower cranes and all cranes with 180 ft. or more of boom including mast and jibs or lifting capacity of 100 tons or more and hoists with 30,000 pound line pull or more, cableways.

GROUP 2: Those operating cranes, derricks, tower cranes, boom trucks, shovels, draglines, clamshells, caisson drilling rigs and similar equipment with a lifting capacity of 15 tons and over. Mechanic with tools with 3/4 inch drive and below.

GROUP 3: All tow boats or work boats, backhoes, end loaders, all excavators, gradalls, all other mechanics, side boom cat, all other cranes and concrete mixing plants, core drills, two drum hoist, concrete pump, mechanically operated laser screed, self contained hydraulic air drills, directional drill operator, standard gauge locomotive, rubber tired scraper, power grader dozer, tractor and pan, push cat, asphalt and concrete paving equipment operator, compactor, compactor with blade, material hauler, articulating equipment, material hoist, wellpoint system, forklift, trencher, air tugger "A" frame truck, grease truck operator, all tractors.

GROUP 4: Fireman, deckhand, elevators, ross carrier, air compressor, high compression equipment, load handler, "bobcat" or skid steer loader, greaser tender, two bag and under concrete mixer, assistant engineer on standard gauge locomotives, locomotive cranes, truck and crawler cranes, brakeman on cranes used for moving rail cars (when equipment is moving cars only), rollers, Barber green loader, mechanic tender, welding machines, light plants, generators, conveyors, mechanical heaters and pump operators, masonry hoist and all farm type tractors.

* IRON0301-001 06/01/2009

Rates Fringes

Ironworkers:

BRAXTON, RANDOLPH

(southern portion) &

WEBSTER COUNTIES............$ 27.46 16.54

KANAWHA & PUTNAM COUNTIES...$ 25.78 16.54

IRON0549-001 12/01/2008

BARBOUR (north west third of county to include the Twps. of Philippi); BROOKE; HANCOCK; HARRISON; MARION; MARSHALL;

MONONGALIA; OHIO; TAYLOR; TYLER AND WETZEL COUNTIES

IRONWORKER.......................$ 28.75 15.69

IRON0568-003 05/01/2009

BARBOUR (Remainder of County), GRANT, MORGAN, PENDLETON, PRESTON, RANDOLPH (Remainder of County) AND TUCKER COUNTIES

IRONWORKER.......................$ 26.08 12.88

IRON0568-007 05/01/2009

HAMPSHIRE, HARDY AND MINERAL COUNTIES

Rates Fringes

IRONWORKER.......................$ 24.57 12.88

IRON0769-005 06/01/2009

CABELL AND WAYNE COUNTIES

Ironworkers:

ZONE 1:

0-10 miles from Union Hall.$ 28.38 17.37

ZONE 2:

10-50 miles from Union Hall.......................$ 28.78 17.37

ZONE 3:

50 miles & over from Union Hall.................$ 30.38 17.37

* IRON0787-004 06/01/2009

CALHOUN, DODDRIDGE, GILMER, JACKSON, LEWIS, MASON, PLEASANTS,

RITCHIE, ROANE, UPSHUR, WIRT AND WOOD COUNTIES

Ironworkers:.....................$ 28.11 16.65

LABO0379-003 12/01/2008

HAMPSHIRE, MARION, MINERAL, MONONGALIA, MORGAN, PRESTON AND

TAYLOR COUNTIES

Laborers:

GROUP 1.....................$ 19.53 9.40

GROUP 2.....................$ 19.89 9.40

GROUP 3.....................$ 20.32 9.40

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer, Flagman.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, Grade checker, Pavement buster operators.

GROUP 3: Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner and Blacksmith.

* LABO0543-001 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

Laborers:

GROUP 1:....................$ 23.66 11.15

GROUP 2:....................$ 24.15 11.15

GROUP 3:....................$ 24.46 11.15

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter tender, Flagmen, Water boy, Fire watch, Demolition worker, Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper Operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders Sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & Hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover,Grade checker.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner.

LABO0809-002 07/01/2009

BROOKE AND HANCOCK COUNTIES

Rates Fringes

LABORER..........................$ 21.82 8.45

Asbestos Work; Hazardous Waste Work; Instrument & Laser; and Lead Based Paint Removal - Additional $.50 per hour

Hot Pay - Additional $1.00 per hour when working with other crafts receiving hot pay

LABO0984-001 12/01/2008

BARBOUR BRAXTON, DODRIDGE, GILMER, GRANT, HARDY, HARRISON,

LEWIS, PENDLETON, RANDOLPH, TUCKER, UPSHUR, and WEBSTER COUNTIES

LABORER

GROUP 1.....................$ 19.53 9.40

GROUP 2.....................$ 19.89 9.40

GROUP 3.....................$ 20.32 9.40

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Water boy, Fire watch, Demolition worker, Landscape laborer, Flagman.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover, Grade checker, Pavement buster operators.

GROUP 3: Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner and Blacksmith.

LABO1085-001 12/01/2008

CALHOUN, JACKSON, PLEASANTS RITCHIE, TYLER, WIRT AND WOOD

Laborers:

GROUP 1:....................$ 20.74 11.00

GROUP 2:....................$ 21.04 11.00

GROUP 3:....................$ 21.39 11.00

LABORER CLASSIFICATIONS

GROUP 1: Laborer, Carpenter Tender, Flagmen, Water Boy, Fire watch, Demolition worker, Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scoffold builders, Signal man, Brick mason tenders, Plasterer tenders, Cement finishers tenders, Stone mason tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrator operators, Tamper operators, Chipping and peening, Hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Moterized Buggy operators, Pipe layers tenders, Drill operators tenders sheeters and shorers, Post hole digger operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Workmen working with asbestos, Batch house scale operators, Workmen working with acid mortar and acid brick, Workmen working in acid with cresote and mastic asphalt, Nozzlemen for gunnite or sandblasting, Tool room attendants, Ride or walk roller tampers, Toxic & hazardous waste removal laborer, Asbestos abatement laborer, Lead-based paint remover.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner.

LABO1149-001 12/01/2008

MARSHALL, OHIO AND WETZEL COUNTIES

Rates Fringes

Laborers:

GROUP 1:....................$ 20.27 10.40

GROUP 2:....................$ 20.27 10.40

GROUP 3:....................$ 20.77 10.40

GROUP 4:....................$ 21.27 10.40

LABORER CLASSIFICATION

GROUP 1: Laborers, Carpenter tender, Flagmen, Water boy, Demolition worker, Deep ditch, Tool room attendants, Fire watch and Landscape laborer.

GROUP 2: Powderman tender, Semi-skilled laborer, Scaffold builders grade checker, Signal man, Brick masons tenders, Plasterers tenders, Cement masons tenders, Stone masons tenders, Lathers tenders, Tile setters tenders, Mortar mixers, Jackhammer operators, Vibrater operators, Pavement buster operators, Chipping and peening hammer operators, Air siphon and air pump operators, Riprap finishers, Concrete saw operators, Concrete technicians, Power saw operators, Chain saw operators, Motorized buggy operators, Pipe layers tenders, Drill operators tenders, Sheeters and shorers, Post hole diggers operators, Asphalt rakers, Lance and/or water blaster operators, Blacksmith tenders, Batch house scale operators, Workmen working with acid mortar, Mastic asphalt and acid brick, Workmen working in acid and with cresote, Nozzlemen for gunnite or sandblasting, Demolition worker, Ride or walk roller tampers, Deep ditch vertical 6 ft. or more, Scaffolding work over 50 ft.

(inside or out), Asbestos abatement laborer, Deep ditch, Toxic & hazardous waste removal laborer, Lead-based paint removal laborer.

GROUP 3: Blacksmith, Powderman, Air track operator, Pipe layer (including laser beam set-up), Burner.

GROUP 4: Asbestos Worker; Hazardous Waste Worker; & Lead Based Paint Removal Laborer.

LABO1353-001 12/01/2008

KANAWHA, PUTNAM AND ROANE COUNTIES

Rates Fringes

Laborers:

GROUP 1.....................$ 21.58 10.40

GROUP 2.....................$ 22.20 10.40

GROUP 3.....................$ 23.04 10.40

GROUP 1: Laborer; Carpenter Tender; Water Boy; Demolition Worker; Fire Watch; Landscape Laborer; Flagmen.

GROUP 2: Powderman Tender; Semi-Skilled Laborer; Scaffold Builder; Grade Checker; Signal Man; Brick Masons Tenders;

Plasterer Tenders; Cement Finisher Tender; Stone Masons Tenders; Lathers Tenders; Tile Setters Tenders; Mortar Mixers; Jackhammer; Vibrator; Tamper; Pavement Buster;

Chipping & Peening Hammer; Air Siphon & Air Pump; Riprap Finisher; Concrete Saw; Concrete Technician; Power Saw;

Chain Saw; Motorized Buggy; Pipelayers Tender; Drill Op.

Tender; Sheeters & Shorers; Post Hole Digger; Asphalt Raker; Lance and/or Water Blaster; Blachsmith Tender; Batch House Scale; Workmen working with Acid Mortar; Acid Brick;

Acid or Mastic Asphalt; Workmen working with Creosote;

Nozzlemen for Gunnite or Sandblasting; Tool Room Attendants; Ride or Walk Roller Tampers; Lather Tender;

Tile Setters Tenders; Asbestos Removal Worker; Hazardous Waste Worker.

GROUP 3: Blacksmith; Powdermen; Air Track; Pipe Layer (including Laser Beam Set-Up); Burner.

MARB0005-001 06/01/2005

CABELL, MASON (THAT PORTION SOUTH OF THE KANAWHA RIVER), AND

WAYNE COUNTIES

Marble, terrazzo and tile finisher.........................$ 20.38 12.75

PAIN0091-001 12/01/2008

BROOKE (SOUTH OF BUFFALO CREEK), MARSHALL, OHIO AND WETZEL COS.

Rates Fringes

Painters:

Brush, Roller, Paper hanger, Sand/Spray, Waterblast and Perfataping (Including Automatic Perfataping Tools)..........$ 22.55 10.00

PAIN0091-010 12/01/2008

Brooke, Marshall, Ohio, and Wetzel Counties

Rates Fringes

GLAZIER..........................$ 25.10 9.60

PAIN0091-011 12/01/2008

Hancock County

Rates Fringes

GLAZIER..........................$ 24.60 9.00

PAIN0438-003 12/01/2008

BROOKE (NORTH OF BUFFALO CREEK), HANCOCK COUNTIES

Rates Fringes

Painters: (Painters, Drywall Finishers & Paper Hangers, and Perfataping (Automatic Taping Tools, Bazooka & Banjo))..........................$ 22.55 10.00

PAIN0804-001 12/01/2008

BARBOUR, DODDRIDGE, GILMER, GRANT, HAMPSHIRE, HARDY, HARRISON,

LEWIS, MARION, MINERAL, MORGAN, MONONGALIA, PENDLETON, PRESTON,

RANDOLPH, TAYLOR, TUCKER, UPSHUR AND WEBSTER COS.

PAINTER (Bridges, Locks, Dams, High Tension Towers, Energized Substations)...........$ 27.83 10.00 PAINTER (Commercial).............$ 22.68 10.00 PAINTER (Industrial and Power Generating Facilities)...........$ 24.83 10.00

PAIN0813-001 12/01/2008

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

Painters:

Brush and Roller, Drywall Finishing and Texuring, Machine Toolstand and Stilts, Spray and Sandblast, and Wall Covering and Vinyl..........$ 22.68 10.00

PAIN0970-001 12/01/2008

BRAXTON, CALHOUN, KANAWHA AND PUTNAM COUNTIES

Rates Fringes

Painters: (Brush Painting, A/Compressor Op., Roller Painting, DryWall Pointers & Tapers, Dipping & Mitten Work, Sprayer Machine Op., Taping Machines, Mud Mixer, Pole Sander, Tape and Spackling Teams, All Synthetic Interior & Exterior Work, Sandblaster, Water Blaster, Steam Jenny Nozzle Op., Swinging Scaffold and Boat Swing Chair, Window Jack Work, Vinyl & Paper Hangers:)

All new commercial projects; Commercial repaint or renovation projects where the total construction cost on the project (all trades combined) exceeds $500,000 in construction cost; all work on waste and water treatment facilities........$ 22.68 10.00

Work at manufacturing plants and power plants.....$ 24.83 10.00

PAIN1144-002 12/01/2008

JACKSON, PLEASANTS, RITCHIE, ROANE, TYLER, WIRT AND WOOD COS.

Rates Fringes

Painters:

Commercial: Brush, roller, Drywall Finisher (Operating mechanical taping machines (men working behind the machine will receive the same rate), Pointers & tapers, Paper & vinyl hangers, Sign painter................$ 22.72 10.00 Industrial: Brush/roller, open structural steel, stacks, vent pipes, flag poles, electrical, radio and tv towers, tanks, spray, sand & water blast, pot man, hydrojet, and glove work..................$ 24.87 10.00

PAIN1195-001 12/01/2008

BARBOUR,BRAXTON, CABELL, CALHOUN, DODDRIDGE, GILMER, GRANT,

HAMPSHIRE, HARDY, HARRISON,KANAWHA, LEWIS, MARION, MASON,

MINERAL, MONOGALIA, MORGAN, PENDELTON, PRESTON, PUTNAM,

RANDOLPH, ROANE, TAYLOR, TUCKER WAYNE, WEBSTER AND UPSHUR

COUNTIES.

GLAZIER..........................$ 27.50 5.70

PAIN1195-007 12/01/2008

JACKSON, PLEASANTS, RITICHIE, TYLER, WIRT, and WOOD Counties

Rates Fringes

GLAZIER..........................$ 25.99 7.20

PLAS0039-003 07/01/2008

BROOKE, CALHOUN, GRANT, HAMPSHIRE, HANCOCK, HARDY, JACKSON,

MARSHALL, MINERAL,MORGAN, OHIO, PENDLETON, PLEASANTS, RANDOLPH,

RITCHIE, TAYLOR, WETZEL, WIRT & WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 23.88 10.20

Mechanical Equipment (Floating, Grinding, Bushhammering or finishing)......$ 24.48 10.20

PLAS0039-004 07/01/2008

BROOKE, CALHOUN, GILMER, GRANT, HAMPSHIRE, HANCOCK, HARDY,

JACKSON, MARSHALL, MINERAL, MORGAN, OHIO, PENDLETON, PLEASANTS,

RANDOLPH, RITCHIE, TYLER, WETZEL, WIRT & WOOD COUNTIES

PLASTERER........................$ 23.88 10.20

PLAS0887-001 06/01/2008

Rates Fringes

Cement Masons:...................$ 27.06 12.91

PLAS0887-003 06/01/2008

Rates Fringes

PLASTERER........................$ 28.66 9.97

* PLUM0083-002 07/01/2009

BROOKE COUNTY (North to Route #27 due east to the State Line, Excluding the City limits of Wellsburg), MARSHALL, OHIO AND

WETZEL COUNTIES

Plumber and Steamfitter..........$ 30.51 16.28

PLUM0152-001 11/01/2008

HARRISON, LEWIS, MARION, MONONGALIA, TAYLOR AND UPSHUR COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 34.22 18.40 All other work..............$ 29.96 18.40

PLUM0152-002 11/01/2008

BARBOUR, DODDRIDGE AND PRESTON COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 34.51 18.40 All other work..............$ 30.25 18.40

PLUM0152-003 11/01/2008

BRAXTON, GILMER, RANDOLPH AND TUCKER COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 34.80 18.40 All other work..............$ 30.54 18.40

PLUM0152-004 11/01/2008

GRANT, HAMPSHIRE, HARDY, MINERAL AND PENDLETON COUNTIES

Rates Fringes

Plumbers and Pipefitters Work at power plants, chemical plants, glass plants and manufacturing facilities..................$ 35.09 18.40 All other work..............$ 30.83 18.40

PLUM0490-001 06/01/1998

BROOKE (North of Buffalo Creek),AND HANCOCK COUNTIES

Rates Fringes

Plumbers and Pipefitters.........$ 26.15 12.25

* PLUM0521-002 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

Plumbers and Pipefitters.........$ 29.75 14.97

PLUM0565-001 07/01/2008

CALHOUN, JACKSON, PLEASANTS, RITCHIE, TYLER, WIRT AND WOOD COS.

Rates Fringes

Plumbers and Pipefitters.........$ 29.88 16.18

PLUM0625-001 12/01/2008

KANAWHA, PUTNAM, ROANE AND WEBSTER COUNTIES

Rates Fringes

Plumber, Pipefitter, Steamfitter Work at plants that are in the process of manufacturing a product....$ 30.34 14.98 All other work..............$ 28.94 14.98

ROOF0034-002 05/01/2000

GRANT, HAMPSHIRE, HARDY, MINERAL, AND MORGAN COUNTIES

Rates Fringes

Roofers:

Composition Mopmen..........$ 16.25 5.05 Composition Roofer..........$ 16.00 5.05 Pitch Tear Off or Put On....$ 16.50 5.05 Slaters.....................$ 16.15 5.05

ROOF0185-004 06/01/2008

CABELL, KANAWHA, MASON, PUTNAM AND WAYNE COS.

Rates Fringes

Roofers:.........................$ 26.00 9.76

ROOF0188-002 07/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Rates Fringes

Roofers:

Coal Tar Pitch & Waterproofing...............$ 25.42 10.35 Roofer......................$ 25.17 10.35

ROOF0242-002 06/01/2007

BARBOUR, BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON,

JACKSON, LEWIS, MARION, MONONGALIA, PENDLETON, PLEASANTS,

PRESTON, RANDOLPH, RITCHIE, ROANE, TAYLOR, TUCKER, TYLER,

UPSHUR, WETZEL, WIRT AND WOOD COUNTIES

ROOFER, Including Built Up, Composition and Single Ply Roofs............................$ 22.94 9.03

SFWV0669-001 04/01/2009

BRAXTON, BROOKE, CABELL, CALHOUN, DODDRIDGE, GILMER, HANCOCK,

HARRISON, JACKSON, KANAWHA, LEWIS, MARION, MARSHALL, MASON,

MINERAL, OHIO, PLEASANTS, PUTNAM, RITCHIE, ROANE, TYLER,

UPSHUR, WAYNE, WETZEL, WIRT AND WOOD COUNTIES

SPRINKLER FITTER.................$ 30.10 16.05

SHEE0024-010 06/01/2008

CABELL AND WAYNE COUNTIES

Rates Fringes

Sheet metal worker...............$ 25.05 17.57

SHEE0033-015 06/01/2008

KANAWHA, MASON AND PUTNAM COUNTIES

Rates Fringes

Sheet Metal Worker...............$ 25.00 16.77

SHEE0033-017 07/01/2009

BROOKE, HANCOCK, MARSHALL AND OHIO COUNTIES

Rates Fringes

Sheet Metal Worker...............$ 26.61 16.22

SHEE0033-020 06/01/2009

BRAXTON, CALHOUN, DODDRIDGE, GILMER, HARRISON, JACKSON, LEWIS,

MONONGALIA, MARION, PLEASANTS, RITCHIE, ROANE, TYLER, UPSHUR,

WETZEL, WIRT AND WOOD COUNTIES

Sheet metal worker...............$ 27.05 17.37

SHEE0100-008 05/01/2009

MINERAL COUNTY

Rates Fringes

Sheet Metal Worker 0-40 miles from City Hall, Cumberland, Maryland........$ 23.73 14.11 41-65 miles from City Hall, Cumberland, Maryland..$ 25.48 14.11 66+ miles from City Hall, Cumberland, Maryland........$ 25.98 14.11

TEAM0092-005 07/01/2008

BROOKE & HANCOCK COUNTIES

Rates Fringes

Truck drivers:

GROUP 1.....................$ 21.39 9.87

GROUP 2.....................$ 21.43 9.87

GROUP 3.....................$ 21.47 9.87

GROUP 4.....................$ 22.17 9.87

GROUP 5.....................$ 22.29 9.87

CLASSIFICATIONS

GROUP 1 - End Dump; Dumpster; Turnarocker; Ross Carrier;

Athry Wagon; Greaser; Tiremen; Articulated Dump

GROUP 2 - Flatboy Material Tuck, Dump & and Semi-Dump Truck; Semi Trailer & Tractor Trailer

GROUP 3 - Tank Trucks (straight & semi)

GROUP 4 - Mechanic

GROUP 5 - Lowboy Trailer; Winch Truck; A-Frame; Forktruck;

Distributor Truck (front & back end) & Truck Crane

TEAM0175-002 06/01/2008

CALHOUN, GILMER, JACKSON, KANAWHA, PLEASANTS, RITCHIE, ROANE,

TYLER, WIRT AND WOOD COUNTIES

Truck drivers:

GROUP 1.....................$ 22.07 a

GROUP 2.....................$ 22.17 a GROUP 3.....................$ 22.32 a GROUP 4.....................$ 22.47 a GROUP 5.....................$ 22.72 a GROUP 6.....................$ 22.82 a GROUP 7.....................$ 22.97 a

FOOTNOTE: a. $1,924.31 per month

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Pick-Up; Panel; John Deere Gators or Similar Equipment

GROUP 2 - Flat Body Material (Straight Jobs); Dump (Up to 5

cu. yds.); Greaser; Tank (Straight)

GROUP 3 - Dump (5 cu. yds. & over); Semi-Dump; Semi-Trailer (whether Flat, Rack or Pole and hauled or pushed by truck or tractor); Agitator or Mixed (Up to 5 cu. yds.); Tank (Semi); & Monorail

GROUP 4 - Low Boy Trailer; Winch; Fork; Distributor (Front & Back End); Truck Crane; Agitator or Mixer (5 cu. yds. & over); Hydraulic Tail Gate; & Farm Type Tractor

GROUP 5 - Euclid; Dumpster; Turnarocker; Ross Carrier; Athey Wagon or Similar Equipment; A-Frame; Hydrolift; & Dual Purpose

GROUP 6 - Mechanic

GROUP 7 - Master Mechanic (3 or more mechanics employed)

TEAM0505-003 06/01/2009

CABELL, MASON AND WAYNE COUNTIES

Rates Fringes

Truck drivers:

GROUP 1.....................$ 29.57 12.84+A

GROUP 2.....................$ 30.10 12.84+A

GROUP 3.....................$ 30.27 12.84+A

GROUP 4.....................$ 30.75 12.84+A

GROUP 5.....................$ 31.17 12.84+A

GROUP 6.....................$ 31.39 12.84+A

TRUCK DRIVER CLASSIFICATIONS

GROUP 1 - Pickup; Station Wagon; Panel; Flatbody Material Truck (Straight job); & Dump (Up to 5 cu. yds.)

GROUP 2 - Tank (Straight); Dump (5 cu. yds. & over); Agitator or Mixer (Up to 5 cu. yds.); & Flat Bed Tandem

GROUP 3 - Agitator or Mixer (5 cu. yds. & Over)

GROUP 4 - Mechanic; Tri-Axle Dump; Hydraulic Lift Tailgate;

Truck & Farm-type Tractor; End Dumpster; Turnarocker; Ross Carrier; Athey Wagon; Semi-dump; Semi-trailer; Semi-tank; & Lowboy Trailer

GROUP 5 - Master Mechanic

GROUP 6 - Winch; Fork; Distributor (Front End and Back End);

Truck Crane; & Monorail

A. Paid Holidays - New Years Day, Memorial Day, July 4th, Labor Day, Thanksgiving, Day After Thanksgiving & Christmas Day

TEAM0697-002 07/01/2009

MARSHALL, OHIO AND WETZEL COUNTIES

Rates Fringes

TRUCK DRIVER

GROUP 1 - Pickup...........$ 21.64 13.25 GROUP 2 - Greaser..........$ 21.65 13.25 GROUP 3 - Flatbed Material; Dump & Semi-Dump..$ 21.69 13.25 GROUP 4 - Tank (straight & semi).....................$ 21.72 13.25 GROUP 5 - Semi-Tractor Trailer.....................$ 21.74 13.25 GROUP 6 - Pole-Trailer.....$ 21.84 13.25 GROUP 7 - Agitator & Mixer (Up to 5 cu. yds.)....$ 21.92 13.25 GROUP 8 - Euclid;

Dumpster; Turnarocker;

Ross Carrier; & Athey Wagon.$ 21.97 13.25 GROUP 9 - Agitator & Mixer (Over 5 cu. yds.).....$ 22.00 13.25 GROUP 10 - Lowboy Trailer;

Winch; Fork & Distributor (Front & Back End); & Truck Crane.................$ 22.27 13.25 GROUP 11 - A-Frame..........$ 22.34 13.25 Group 12 - Mechanic.........$ 22.37 13.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

(End of Summary of Changes)

File details come from the government source that posted it. Updated .