03 30 53.pdf
PDF 423 KB Posted
- Solicitation number
- W911WN09B0025
About this file
Revised Spec 03 30 53
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 09B0025.doc | DOC document | |
| W911WN-09-B-0025 Amend 02.pdf | ||
| 01 22 00.00 10.pdf | ||
| W911WN-09-B-0025-0001.zip | ZIP file | |
| 01 45 01.pdf | ||
| W911WN-09-B-0025 Amend 01.pdf | ||
| W911WN-09-B-0025.zip | ZIP file | |
| Solicitation W911WN-09-B-0025.pdf | ||
| Technical Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pike Island Locks and Dam, Emergency Generator Installation
SECTION TABLE OF CONTENTS
DIVISION 03 - CONCRETE
SECTION 03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 SUMMARY
1.2 REFERENCES
1.3 SYSTEM DESCRIPTION
1.3.1 Strength
1.3.2 Construction Tolerances
1.3.3 Concrete Mixture Proportions
1.4 SUBMITTALS
1.5 QUALITY ASSURANCE
1.5.1 Regulatory Requirements
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Aggregates
2.1.2 Water
2.1.3 Expansion Joint Filler Strips, Premolded
2.1.4 Joint Sealants - Field Molded Sealants
2.2 READY-MIX CONCRETE
2.3 STEEL REINFORCEMENT
2.3.1 Deformed Steel Bars
2.3.2 Welded Wire Fabric
2.4 FORMS
2.5 ACCESSORIES
2.5.1 Curing Compound
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 General
3.1.2 Embedded Items
3.1.3 Formwork Installation
3.1.4 Production of Concrete
3.1.4.1 Ready-Mixed Concrete
3.2 CONVEYING AND PLACING CONCRETE
3.2.1 General
3.2.2 Consolidation
3.2.3 Cold-Weather Requirements
3.2.4 Hot-Weather Requirements
3.3 FORM REMOVAL
3.4 FINISHING
3.4.1 General
3.4.2 Finishing Formed Surfaces
3.4.3 Finishing Unformed Surfaces
3.4.3.1 Float Finish
SECTION 03 30 53 Page 1 W911WN-09-B-0025 Revised by Amendment 0001
3.4.3.2 Broom Finish
3.4.3.3 Expansion and Contraction Joints
3.5 CURING AND PROTECTION
3.6 TESTS AND INSPECTIONS
3.6.1 General
3.6.2 Inspection Details and Frequency of Testing
3.6.2.1 Preparations for Placing
3.6.2.2 Air Content
3.6.2.3 Slump
3.6.2.4 Consolidation and Protection
3.6.3 Action Required
3.6.3.1 Placing
3.6.3.2 Air Content
3.6.3.3 Slump
3.6.4 Reports
3.7 FORM WORK
3.7.1 Preparation of Form Surfaces
3.7.2 Form Coating
3.7.3 Removal of Forms
3.8 STEEL REINFORCING
3.8.1 General
3.8.2 Fabrication
3.8.3 Splicing
3.8.4 Supports
3.9 EMBEDDED ITEMS
3.10 FIELD TESTING
-- End of Section Table of Contents --
SECTION 03 30 53 Page 2
SECTION 03 30 53
MISCELLANEOUS CAST-IN-PLACE CONCRETE
PART 1 GENERAL
1.1 SUMMARY
Perform all work in accordance with ACI MCP SET Parts 2 and 3.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ACI INTERNATIONAL (ACI)
ACI MCP SET (2009) Manual of Concrete Practice
ASTM INTERNATIONAL (ASTM)
ASTM A 185/A 185M (2007) Standard Specification for Steel Welded Wire Reinforcement, Plain, for Concrete
ASTM A 615/A 615M (2008b) Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement
ASTM C 1064/C 1064M (2008) Standard Test Method for Temperature of Freshly Mixed Hydraulic-Cement Concrete
ASTM C 143/C 143M (2008) Standard Test Method for Slump of Hydraulic-Cement Concrete
ASTM C 171 (2007) Standard Specification for Sheet Materials for Curing Concrete
ASTM C 172 (2008) Standard Practice for Sampling Freshly Mixed Concrete
ASTM C 173/C 173M (2008a) Standard Test Method for Air Content of Freshly Mixed Concrete by the Volumetric Method
ASTM C 231 (2008c) Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
ASTM C 260 (2006) Standard Specification for Air-Entraining Admixtures for Concrete
ASTM C 309 (2007) Standard Specification for Liquid
SECTION 03 30 53 Page 3
Membrane-Forming Compounds for Curing Concrete
ASTM C 31/C 31M (2008b) Standard Practice for Making and Curing Concrete Test Specimens in the Field
ASTM C 39/C 39M (2005e1e2) Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens
ASTM C 494/C 494M (2008a) Standard Specification for Chemical Admixtures for Concrete
ASTM C 920 (2008) Standard Specification for Elastomeric Joint Sealants
ASTM D 1752 (2004a; R 2008) Standard Specification for Preformed Sponge Rubber Cork and Recycled PVC Expansion
ASTM D 75 (2003) Standard Practice for Sampling Aggregates
U.S. ARMY CORPS OF ENGINEERS (USACE)
COE CRD-C 400 (1963) Requirements for Water for Use in Mixing or Curing Concrete
WEST VIRGINIA DEPARTMENT OF HIGHWAYS (WVDOH)
WVDOH Spec (2000) Standard Specifications for Roads and Bridges, Including Supplemental Specifications dated January 1, 2009
1.3 SYSTEM DESCRIPTION
The Government retains the option to sample and test joint sealer, joint filler material, aggregates and concrete to determine compliance with the specifications. Provide facilities and labor as may be necessary to assist the Government in procurement of representative test samples. Obtain samples of aggregates at the point of batching in accordance with ASTM D 75.
Sample concrete in accordance with ASTM C 172. Determine slump and air content in accordance with ASTM C 143/C 143M and ASTM C 231, respectively, when cylinders are molded. Prepare, cure, and transport compression test specimens in accordance with ASTM C 31/C 31M. Test compression test specimens in accordance with ASTM C 39/C 39M. Take samples for strength tests not less than once each shift in which concrete is produced. Provide a minimum of three specimens from each sample; two to be tested at 28 days for acceptance, and one will be tested at 7 days for information.
1.3.1 Strength
Acceptance test results are the average strengths of two specimens tested at 28 days. The strength of the concrete is considered satisfactory so long as the average of three consecutive acceptance test results equal or exceed the specified compressive strength, f'c, and no individual acceptance test result falls below f'c by more than 500 psi.
SECTION 03 30 53 Page 4
1.3.2 Construction Tolerances
Apply a Class "C" finish to all surfaces except those specified to receive a Class "D" finish. Apply a Class "D" finish to all post-construction surfaces which will be permanently concealed. Surface requirements for the classes of finish required are as specified in Part 4 of ACI MCP SET.
1.3.3 Concrete Mixture Proportions
Concrete mixture proportions are the responsibility of the Contractor.
Mixture proportions shall include the dry weights of cementitious material(s); the nominal maximum size of the coarse aggregate; the specific gravities, absorptions, and saturated surface-dry weights of fine and coarse aggregates; the quantities, types, and names of admixtures; and quantity of water per cubic yard of concrete. Provide materials included in the mixture proportions of the same type and from the same source as will be used on the project. Specified compressive strength f'c shall be 4,000 psi at 28 days. The maximum nominal size coarse aggregate is 1-1/2 inch, in accordance with ACI MCP SET Part 3. The air content shall be between 4.5 and 7.5 percent with a slump between 2 and 5 inches. The maximum water cement ratio is 0.42.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Air-Entraining Admixture Water-Reducing or Retarding Admixture Curing Materials Reinforcing Steel Expansion Joint Filler Strips, Premolded Joint Sealants - Field Molded Sealants
Manufacturer's literature from suppliers which demonstrates compliance with applicable specifications for the above materials.
Batching and Mixing Equipment
Manufacturer's data for batching and mixing equipment which demonstrates compliance with the applicable specifications.
Conveying and Placing Concrete
Methods and equipment for transporting, handling, depositing, and consolidating the concrete prior to the first concrete placement.
Formwork
Formwork design prior to the first concrete placement.
Forms Concrete Placement
SECTION 03 30 53 Page 5
Ready-Mix Concrete Mix Design Data Air-Entraining Admixtures Steel Reinforcement Curing Compound
SD-07 Certificates
Cementitious Materials
Manufacturer's certificates of compliance, accompanied by mill test reports, attesting that the concrete materials meet the requirements of the specifications in accordance with the Special Clause "CERTIFICATES OF COMPLIANCE". Certificates for all material conforming to EPA's Comprehensive Procurement Guidelines (CPG), in accordance with 40 CFR 247.
Aggregates
Certificates of compliance stating that the material(s) meet the quality and grading requirements of the specifications under which it is furnished.
1.5 QUALITY ASSURANCE
1.5.1 Regulatory Requirements
The state statutory and regulatory requirements: WVDOH Spec forms a part of this specification to the extent referenced.
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Aggregates
Fine and coarse aggregates shall WVDOH Spec, Section 703, except that river gravel will not be acceptable.
2.1.2 Water
Use fresh, clean, potable water for mixing and curing, free from injurious amounts of oil, acid, salt, or alkali, except that unpotable water may be used if it meets the requirements of COE CRD-C 400.
2.1.3 Expansion Joint Filler Strips, Premolded
Expansion joint filler strips, premolded shall be sponge rubber conforming to ASTM D 1752, Type I.
2.1.4 Joint Sealants - Field Molded Sealants
Joint sealants - field molded sealants shall conform to ASTM C 920, Type M, Grade NS, Class 25, use NT for vertical joints and Type M, Grade P, Class 25, use T for horizontal joints. Provide polyethylene tape, coated paper, metal foil, or similar type bond breaker materials. The backup material needs to be compressible, nonshrink, nonreactive with the sealant, and a nonabsorptive material such as extruded butyl or polychloroprene foam rubber. Immediately prior to installation of field-molded sealants, clean
SECTION 03 30 53 Page 6 the joint of all debris and further cleaned using water, chemical solvents, or other means as recommended by the sealant manufacturer or directed.
2.2 READY-MIX CONCRETE
a. Concrete shall be ready-mix concrete with mix design data conforming to WVDOH Spec, Section 601; Class A.
b Slump: 1 to 4 inch according to ASTM C 143/C 143M and ACI MCP SET Part 1.
c Use one brand and type of cement for formed concrete having exposed-to-view finished surfaces.
d. Air-Entraining Admixtures conforming to ASTM C 260. Exterior concrete exposed to freezing needs to be air-entrained 5 to 6 percent by volume. Nonair-entrained interior concrete shall have a total air content of 2 to 4 percent by volume.
e. Water-reducing admixtures, retarding admixtures, accelerating admixtures, water-reducing and accelerating admixtures, and water-reducing and retarding admixtures shall conform to
ASTM C 494/C 494M.
2.3 STEEL REINFORCEMENT
2.3.1 Deformed Steel Bars
Provide steel bars conforming to ASTM A 615/A 615M, Grade .60 ksi ACI MCP SET Parts 2 and 3.
2.3.2 Welded Wire Fabric
Provide welded wire fabric conforming to ASTM A 185/A 185M.
2.4 FORMS
Forms shall be of wood, steel, or other approved material and conform to ACI MCP SET, Parts 2 and 3.
Provide form release conforming to ACI MCP SET, Part 4.
2.5 ACCESSORIES
2.5.1 Curing Compound
Provide curing compound conforming to ASTM C 309.
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 General
Prepare construction joints to expose coarse aggregate. The surface shall be clean, damp, and free of laitance. Construct ramps and walkways, as necessary, to allow safe and expeditious access for concrete and workmen.
Remove snow, ice, standing or flowing water, loose particles, debris, and foreign matter. Earth foundations shall be satisfactorily compacted.
SECTION 03 30 53 Page 7
Ensure spare vibrators are available. The entire preparation shall be accepted by the Government prior to placing.
3.1.2 Embedded Items
Secure reinforcement in place after joints, anchors, and other embedded items have been positioned. Arrange internal ties so that when the forms are removed the metal part of the tie is not less than 2 inches from concrete surfaces permanently exposed to view or exposed to water on the finished structures. Embedded items shall be free of oil and other foreign matters such as loose coatings or rust, paint, and scale. The embedding of wood in concrete is permitted only when specifically authorized or directed. All equipment needed to place, consolidate, protect, and cure the concrete shall be at the placement site and in good operating condition.
3.1.3 Formwork Installation
Forms shall be properly aligned, adequately supported, and mortar-tight.
Provide smooth form surfaces, free from irregularities, dents, sags, or holes when used for permanently exposed faces. Chamfer all exposed joints and edges , unless otherwise indicated.
3.1.4 Production of Concrete
3.1.4.1 Ready-Mixed Concrete
Provide ready-mixed concrete conforming to WVDOH Spec, Section 601, except as otherwise specified.
3.2 CONVEYING AND PLACING CONCRETE
Perform conveying and placing concrete in conformance with the following requirements.
3.2.1 General
Concrete placement is not permitted when weather conditions prevent proper placement and consolidation without approval. When concrete is mixed and/or transported by a truck mixer, deliver the concrete to the site of the work completing the discharge within 1-1/2 hours or 45 minutes when the placing temperature is 86 degrees F or greater unless a retarding admixture is used. Convey concrete from the mixer to the forms as rapidly as practicable by methods which prevent segregation or loss of ingredients.
Concrete shall be in place and consolidated within 15 minutes after discharge from the mixer. Deposit concrete as close as possible to its final position in the forms and regulate it so that it may be effectively consolidated in horizontal layers 18 inches or less in thickness with a minimum of lateral movement. Carry on the placement at such a rate that the formation of cold joints will be prevented.
3.2.2 Consolidation
Consolidate each layer of concrete by internal vibrating equipment.
Systematically accomplish internal vibration by inserting the vibrator through the fresh concrete in the layer below at a uniform spacing over the entire area of placement. The distance between insertions shall be approximately 1.5 times the radius of action of the vibrator and overlay the adjacent, just-vibrated area by approximately 4 inches. Ensure that the vibrator penetrates rapidly to the bottom of the layer and at least 6
SECTION 03 30 53 Page 8 inches into the layer below, if such a layer exists. Hold vibrator stationary until the concrete is consolidated and then withdraw it slowly at the rate of about 3 inches per second.
3.2.3 Cold-Weather Requirements
No concrete is to be mixed or placed when the ambient temperature is below 36 degrees F or if the ambient temperature is below 41 degrees F and falling. Provide suitable covering and other means as approved for maintaining the concrete at a temperature of at least 50 degrees F for not less than 72 hours after placing and at a temperature above freezing for the remainder of the curing period. Do not mix salt, chemicals, or other foreign materials with the concrete to prevent freezing. Remove and replace concrete damaged by freezing at the expense of the Contractor.
3.2.4 Hot-Weather Requirements
When the rate of evaporation of surface moisture, as determined by use of Figure 1 of ACI MCP SET Part 2, is expected to exceed 0.2 psf per hour, provisions for windbreaks, shading, fog spraying, or covering with a light-colored material shall be made in advance of placement, and such protective measures taken as quickly as finishing operations will allow.
3.3 FORM REMOVAL
Do not remove forms before 24 hours after concrete placement, except as otherwise specifically authorized. Do not remove supporting forms and shoring until the concrete has cured for at least 5 days. When conditions require longer curing periods, forms shall remain in place.
3.4 FINISHING
3.4.1 General
Do not finish or repair concrete when either the concrete or the ambient temperature is below 50 degrees F.
3.4.2 Finishing Formed Surfaces
Remove all fins and loose materials , and surface defects including filling of tie holes. Repair all honeycomb areas and other defects. Remove all unsound concrete from areas to be repaired. Surface defects greater than 1/2 inch in diameter and holes left by removal of tie rods in all surfaces not to receive additional concrete shall be reamed or chipped and filled with dry-pack mortar. Brush-coat the prepared area with an approved epoxy resin or latex bonding compound or with a neat cement grout after dampening and filling with mortar or concrete. The cement used in mortar or concrete for repairs to all surfaces permanently exposed to view shall be a blend of portland cement and white cement so that the final color when cured is the same as adjacent concrete.
3.4.3 Finishing Unformed Surfaces
Float finish all unformed surfaces, that are not to be covered by additional concrete or backfill, to elevations shown, unless otherwise specified. Surfaces to receive additional concrete or backfill shall be brought to the elevations shown and left as a true and regular surface.
Slope exterior surfaces for drainage unless otherwise shown. Carefully make joints with a jointing tool. Finish unformed surfaces to a tolerance
SECTION 03 30 53 Page 9 of 3/8 inch for a float finish as determined by a 10 foot straightedge placed on surfaces shown on the drawings to be level or having a constant slope. Do not perform finishing while there is excess moisture or bleeding water on the surface. No water or cement is to be added to the surface during finishing.
3.4.3.1 Float Finish
Provide float finished surfaces, screeded and darbied or bullfloated to eliminate the ridges and to fill in the voids left by the screed. In addition, the darby or bullfloat shall fill all surface voids and only slightly embed the coarse aggregate below the surface of the fresh concrete. When the water sheen disappears and the concrete supports a person's weight without deep imprint, complete floating. Floating shall embed large aggregates just beneath the surface, remove slight imperfections, humps, and voids to produce a plane surface, compact the concrete, and consolidate mortar at the surface.
3.4.3.2 Broom Finish
Apply a broom finish to exposed horizontal slab surfaces. Screed and float the concrete to required finish plane with no coarse aggregate visible.
After surface moisture disappears, broom or brush the surface with a broom or fiber bristle brush in a direction transverse to that of the main traffic or as directed.
3.4.3.3 Expansion and Contraction Joints
Make expansion and contraction joints in accordance with the details shown or as otherwise specified. Provide 1/2 inch thick transverse expansion joints where new work abuts an existing concrete. Provide expansion joints as indicated. Provide contraction joints at a maximum spacing of 10 feet in slabs, unless otherwise indicated. Cut contraction joints at a minimum of 1-1/2 inches deep with a jointing tool after the surface has been finished.
3.5 CURING AND PROTECTION
Beginning immediately after placement, and continuing for at least 7 days, cure and protect all concrete from premature drying, extremes in temperature, rapid temperature change, freezing, mechanical damage, and exposure to rain or flowing water. Provide all materials and equipment needed for adequate curing and protection at the site of the placement prior to the start of concrete placement. Accomplish moisture preservation of moisture for concrete surfaces not in contact with forms by one of the following methods:
a. Continuous sprinkling or ponding.
b. Application of absorptive mats or fabrics kept continuously wet.
c. Application of sand kept continuously wet.
d. Application of impervious sheet material conforming to ASTM C 171.
e. Application of membrane-forming curing compound conforming to ASTM C 309, Type 1-D, on surfaces permanently exposed to view.
Accomplish Type 2 on other surfaces in accordance with manufacturer's instructions.
SECTION 03 30 53 Page 10
Accomplish the preservation of moisture for concrete surfaces placed against wooden forms by keeping the forms continuously wet for 7 days. If forms are removed prior to end of the required curing period, use other curing methods for the balance of the curing period. Do not perform protection removal if the temperature of the air in contact with the concrete may drop more than 60 degrees F within a 24 hour period.
3.6 TESTS AND INSPECTIONS
3.6.1 General
The individuals who sample and test concrete, as required in this specification, must have demonstrated a knowledge and ability to perform the necessary test procedures equivalent to the ACI minimum guidelines for certification of Concrete Field Testing Technicians, Grade I.
3.6.2 Inspection Details and Frequency of Testing
3.6.2.1 Preparations for Placing
Inspect foundation or construction joints, forms, and embedded items in sufficient time prior to each concrete placement by the Contractor to certify that it is ready to receive concrete.
3.6.2.2 Air Content
Check air content at least once during each shift that concrete is placed.
Obtain samples in accordance with ASTM C 172 and tested in accordance with
ASTM C 231.
3.6.2.3 Slump
Check slump once during each shift that concrete is produced. Obtain samples in accordance with ASTM C 172 and tested in accordance with
ASTM C 143/C 143M.
3.6.2.4 Consolidation and Protection
Ensure that the concrete is properly consolidated, finished, protected, and cured.
3.6.3 Action Required
3.6.3.1 Placing
Do not permit placing to begin until the availability of an adequate number of acceptable vibrators, which are in working order and have competent operators, has been verified. Do not continue placing if any pile is inadequately consolidated.
3.6.3.2 Air Content
Whenever an air content test result is outside the specification limits, adjust the dosage of the air-entrainment admixture prior to delivery of concrete to forms.
SECTION 03 30 53 Page 11
3.6.3.3 Slump
Whenever a slump test result is outside the specification limits, adjust the batch weights of water and fine aggregate prior to delivery of concrete to the forms. The adjustments are to be made so that the water-cement ratio does not exceed that specified in the submitted concrete mixture proportion.
3.6.4 Reports
Report the results of all tests and inspections conducted at the project site informally at the end of each shift. Submit written reports weekly.
Deliver within 3 days after the end of each weekly reporting period. See Section 01 45 01 USACE QUALITY CONTROL.
3.7 FORM WORK
Form work shall conform to ACI MCP SET Parts 2 through 5.
3.7.1 Preparation of Form Surfaces
Forms shall be true to line and grade, mortar-tight, and sufficiently rigid to prevent objectionable deformation under load. Form surfaces for permanently exposed faces shall be smooth, free from irregularities, dents, sags, or holes. Chamfer exposed joints and exposed edges. Arrange internal ties so that when the forms are removed, the form ties are not less than 2 inches from concrete surfaces permanently exposed to view or exposed to water on the finished structure.
3.7.2 Form Coating
Coat forms, for exposed surfaces, with a nonstaining form release coating applied shortly before concrete is placed. Forms for unexposed surfaces may be wetted in lieu of coating immediately before the placing of concrete, except that in freezing weather form release coating shall be used.
3.7.3 Removal of Forms
Remove forms carefully to prevent damage to the concrete.
3.8 STEEL REINFORCING
3.8.1 General
Reinforcement shall be free from loose, flaky rust and scale, and free from oil, grease, or other coating which might destroy or reduce the reinforcement's bond with the concrete.
3.8.2 Fabrication
Shop fabricate steel reinforcement in accordance with ACI MCP SET Parts 2 and 3. Shop details and bending shall be in accordance with ACI MCP SET Parts 2 and 3.
3.8.3 Splicing
Perform splices in accordance with ACI MCP SET Parts 2 and 3.
SECTION 03 30 53 Page 12
3.8.4 Supports
Secure reinforcement in place by the use of metal or concrete supports, spacers, or ties.
3.9 EMBEDDED ITEMS
Before placing concrete, take care to determine that all embedded items are firmly and securely fastened in place. Provide embedded items free of oil and other foreign matter, such as loose coatings of rust, paint and scale.
Embedding of wood in concrete is permitted only when specifically authorized or directed.
3.10 FIELD TESTING
a. Provide samples and test concrete for quality control during placement. Sampling of fresh concrete for testing shall be in accordance with ASTM C 172.
b. Test concrete for compressive strength at 7 and 28 days for each design mix. Concrete test specimens shall conform to ASTM C 31/C 31M.
Perform Compressive strength testing conforming to ASTM C 39/C 39M.
c. Test Slump at the site of discharge for each design mix in accordance with ASTM C 143/C 143M.
d. Test air content for air-entrained concrete in accordance with ASTM C 231. Test concrete using lightweight or test extremely porous aggregates in accordance with ASTM C 173/C 173M.
e. Determine temperature of concrete at time of placement in accordance with ASTM C 1064/C 1064M.
-- End of Section --
SECTION 03 30 53 Page 13
| 03 30 53 - MISCELLANEOUS CAST-IN-PLACE CONCRETE |
| 03 30 53 - MISCELLANEOUS CAST-IN-PLACE CONCRETE |
| PART 1 GENERAL |
| 1.1 SUMMARY |
| 1.2 REFERENCES |
| 1.3 SYSTEM DESCRIPTION |
| 1.3.1 Strength |
| 1.3.2 Construction Tolerances |
| 1.3.3 Concrete Mixture Proportions |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.5.1 Regulatory Requirements |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Aggregates |
| 2.1.2 Water |
| 2.1.3 Expansion Joint Filler Strips, Premolded |
| 2.1.4 Joint Sealants - Field Molded Sealants |
| 2.2 READY-MIX CONCRETE |
| 2.3 STEEL REINFORCEMENT |
| 2.3.1 Deformed Steel Bars |
| 2.3.2 Welded Wire Fabric |
| 2.4 FORMS |
| 2.5 ACCESSORIES |
| 2.5.1 Curing Compound |
| PART 3 EXECUTION |
| 3.1 PREPARATION |
| 3.1.1 General |
| 3.1.2 Embedded Items |
| 3.1.3 Formwork Installation |
| 3.1.4 Production of Concrete |
| 3.1.4.1 Ready-Mixed Concrete |
| 3.2 CONVEYING AND PLACING CONCRETE |
| 3.2.1 General |
| 3.2.2 Consolidation |
| 3.2.3 Cold-Weather Requirements |
| 3.2.4 Hot-Weather Requirements |
| 3.3 FORM REMOVAL |
| 3.4 FINISHING |
| 3.4.1 General |
| 3.4.2 Finishing Formed Surfaces |
| 3.4.3 Finishing Unformed Surfaces |
| 3.4.3.1 Float Finish |
| 3.4.3.2 Broom Finish |
| 3.4.3.3 Expansion and Contraction Joints |
| 3.5 CURING AND PROTECTION |
| 3.6 TESTS AND INSPECTIONS |
| 3.6.1 General |
| 3.6.2 Inspection Details and Frequency of Testing |
| 3.6.2.1 Preparations for Placing |
| 3.6.2.2 Air Content |
| 3.6.2.3 Slump |
| 3.6.2.4 Consolidation and Protection |
| 3.6.3 Action Required |
| 3.6.3.1 Placing |
| 3.6.3.2 Air Content |
| 3.6.3.3 Slump |
3.6.4 Reports
| 3.7 FORM WORK |
| 3.7.1 Preparation of Form Surfaces |
| 3.7.2 Form Coating |
| 3.7.3 Removal of Forms |
| 3.8 STEEL REINFORCING |
| 3.8.1 General |
| 3.8.2 Fabrication |
| 3.8.3 Splicing |
| 3.8.4 Supports |
| 3.9 EMBEDDED ITEMS |
| 3.10 FIELD TESTING |