W911WN-09-B-0025 Amend 01.pdf

PDF 23 KB Posted

Attached to
RECOVERY--Z--Upgrade the emergency generator at Pike Island Lock and Dam.
Solicitation number
W911WN09B0025
Issued by

About this file

Amendment 01

View the file

Other files

File Type Posted
BidResults for 09B0025.doc DOC document
W911WN-09-B-0025 Amend 02.pdf PDF
01 22 00.00 10.pdf PDF
W911WN-09-B-0025-0001.zip ZIP file
03 30 53.pdf PDF
01 45 01.pdf PDF
W911WN-09-B-0025.zip ZIP file
Solicitation W911WN-09-B-0025.pdf PDF
Technical Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET491776311

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Re: Upgrade the Emergency Generator at Pike Island Lock and Dam This amendment is to include: 1. A list of attendees at the site visit

2. Questions and Answ ers submitted from interested parties

3. Revised Specif ications; 01 22 00.00 10 and 01 45 01 and 03 30 53

4. Four (4) Revised plans attached to amendment

5. Amendments to Line Item 0005 and 0006 See attached plans and specs and Summary of Changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 26-Aug-2009

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911WN-09-B-0025

X 9B. DATED (SEE ITEM 11)

06-Aug-2009

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 2 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

26-Aug-2009

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CECT-LRP

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN-09-B-0025

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

SITE VISIT ATTENDEES

Attendees:

GOVERNMENT

Linda Bressler Contract Specialist, USACE – Pittsburgh Joseph Elwell Supervisor of Civil Engineering, USACE - Pittsburgh Ronald Gadomski Electronics Engineer, USACE – Pittsburgh Jim Lowe Mechanical Engineer, USACE - Pittsburgh James Kirchner L/D Mechanic – Lock 8 & 9 USACE – Pittsburgh

INTERESTED PARTIES

Jim Mecker Erb Electric Steve Suarez ABCON, Inc Richard Armstrong TMG Mark Suszczywski Liberty Electric, Inc.

Vince Villi Villi Electrical Group, Inc.

Rich Swindinski Selinsky Fence Lou Kutys Selinsky Fence

The following have been added by full text:

QUESTIONS AND ANSWERS

Pike Island Locks and Dam Emergency Generator Installation

Bidder Questions and Answers

Q1. What are the dimensions and depth of the oil overflow pit that is to be removed and backfilled

A1. See Section A-A and the Basement Plan on reference drawing 79/1.3.

Q2 What size is the reinforcing mesh for the esplanade concrete to be? Plan page M-8002 shows 6x6 and plan page C-0003 shows 4x4 mesh?

A2. The mesh will be 4 x 4. The drawing has been revised to show this.

Q3. Under Spec Section 01 22 00 Measurement and Payment, I don’t see where the steel platform costs are to be included?

A3. It will be included with Furnish and Install New Emergency Generator. The specification has been revised to clarify this.

W911WN-09-B-0025

Q4 On page 4 of Spec Section 01 22 00 Measurement and Payment, on paragraph 1.1.3.1 for the generator installation, it calls for removal and disposal of existing generator, but that was called out to leave in place and just disconnect. Which is correct?

A4. The generator will remain. The payment paragraph has been corrected.

Q5 Also in Spec Section 01 22 00 Measurement and Payment, on paragraph 1.1.3.1 for the generator installation, it says to include construction of concrete slabs, but they have a separate bid item. Please Clarify.

A5. The generator support concrete will be paid with the generator. The esplanade slabs are paid for separately.

SECTION 00010 - SOLICITATION CONTRACT FORM

CLIN 0005

The pricing detail quantity has increased by 40.00 from 112.00 to 152.00.

CLIN 0006

The pricing detail quantity has increased by 42.00 from 86.00 to 128.00.