Revised Spec 01 22 00.00 10
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults for 09B0025.doc | DOC document | |
| W911WN-09-B-0025 Amend 02.pdf | ||
| W911WN-09-B-0025-0001.zip | ZIP file | |
| 03 30 53.pdf | ||
| 01 45 01.pdf | ||
| W911WN-09-B-0025 Amend 01.pdf | ||
| W911WN-09-B-0025.zip | ZIP file | |
| Solicitation W911WN-09-B-0025.pdf | ||
| Technical Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pike Island Locks and Dam, Emergency Generator Installation
SECTION TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
1.1.1 Project Sign
1.1.1.1 Payment
1.1.1.2 Unit of Measure
1.1.1.3 Payment Item
1.1.2 Asphalt Pavement Removal
1.1.2.1 Payment
1.1.2.2 Unit of Measure
1.1.2.3 Payment Item
1.1.3 Furnish and Install New Generator
1.1.3.1 Payment
1.1.3.2 Unit of Measure
1.1.3.3 Payment Item
1.2 UNIT PRICE PAYMENT ITEMS
1.2.1 Progress Photographs
1.2.1.1 Payment
1.2.1.2 Measurement
1.2.1.3 Unit of Measure
1.2.1.4 Payment Item
1.2.2 Removal of Concrete Esplanade
1.2.2.1 Payment
1.2.2.2 Unit of Measure
1.2.2.3 Measurement
1.2.2.4 Payment Item
1.2.3 Concrete
1.2.3.1 Payment
1.2.3.2 Measurement
1.2.3.3 Unit of Measure
1.2.3.4 Payment Item
1.2.4 Concrete
1.2.4.1 Payment
1.2.4.2 Measurement
1.2.4.3 Unit of Measure
1.2.4.4 Payment Item
1.2.5 Handrail Installation
1.2.5.1 Payment
1.2.5.2 Measurement
1.2.5.3 Unit of Measure
1.2.5.4 Payment Item
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 22 00.00 10 Page 1 W911WN-09-B-0025 Revised by Amendment 0001
-- End of Section Table of Contents --
SECTION 01 22 00.00 10 Page 2
SECTION 01 22 00.00 10
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 LUMP SUM PAYMENT ITEMS
Payment items for the work of this contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE in Section 00010 SUPPLIES OR SERVICES AND PRICES/COSTS and described below. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum payment item, shall be included in the listed lump sum item most closely associated with the work involved. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1.1 Project Sign
1.1.1.1 Payment
Payment will be made for costs associated with furnishing, installing, maintaining and removing project sign as specified in Section 01 50 10
PROJECT SIGNS.
1.1.1.2 Unit of Measure
Unit of measure: lump sum.
1.1.1.3 Payment Item
0002 ARRA - Project Sign
1.1.2 Sub TitleAsphalt Pavement Removal
1.1.2.1 Payment
Payment will be made for costs associated with removing existing asphalt pavement for installatinoon of the underground power lines and for replacing the pavement in kind, including sawcutting, subbase, and sealing of joints between the existing asphalt pavement and the new pavement.
1.1.2.2 Unit of Measure
Unit of measure: lump sum.
1.1.2.3 Payment Item
0004 ARRA - Removal and Replacement of Asphalt Pavement
SECTION 01 22 00.00 10 Page 3
1.1.3 Furnish and Install New Generator
1.1.3.1 Payment
Payment for this item shall constitute full compensation for all labor, equipment, material and supply costs to furnish and install the new generator, including removal and disposal of existing generator, construction of concrete slabssupports and enclosures, construction of access plaform, and modification of existing wiring as specified as specified in Sections 26 20 00 ELECTRICAL WORK, 26 28 21.00 40 AUTOMATIC TRANSFER SWITCH, and 26 32 14.00 10 ELECTRIC GENERATOR SETS.
1.1.3.2 Unit of Measure
Unit of measure: Lump Sum.
1.1.3.3 Payment Item
0009 ARRA - Furnish and Install New Emergency Generator
1.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular unit price payment item, shall be included in the listed unit price item most closely associated with the work involved. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.2.1 Progress Photographs
1.2.1.1 Payment
Payment for monthly progress images shall constitute full compensation for all labor, equipment, material and supply costs for furnishing monthly digital progress images, as specified in Section 01 32 33 DIGITAL PROGRESS
IMAGES.
1.2.1.2 Measurement
Measurement will be made of the number of sets of progress images satisfactorily furnished as specified or directed.
1.2.1.3 Unit of Measure
Unit of measure: Sets.
1.2.1.4 Payment Item
0003 ARRA - Digital Progress Images
SECTION 01 22 00.00 10 Page 4
1.2.2 Removal of Concrete Esplanade
1.2.2.1 Payment
Payment for this item shall constitute full compensation for all labor, equipment, material and disposal costs to remove and dispose of the concrete esplanade pavement within the limits shown on the drawings.
1.2.2.2 Unit of Measure
Unit of measure: Square Yards.
1.2.2.3 Measurement
Measurement shall be made on the basis of square yards of esplanade removed as specified and as shown on the drawings.
1.2.2.4 Payment Item
0005 ARRA - Removal of Concrete Esplanade
1.2.3 Concrete
1.2.3.1 Payment
Payment for these items shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the concrete work, including steel reinforcement and embedded parts.
1.2.3.2 Measurement
Measurement shall be made on the basis of square yards of esplanade constructed as specified and as shown on the drawings. No measurement will be made of concrete placed outside the tolerances specified or for the excavation unless otherwise approved by the Contracting Officer. No deduction shall be made for rounded or beveled edges or space occupied by metal work, reinforcing steel, electrical conduits or other items, nor for voids or embedded items that are either less than 5 cubic feet in volume or 1 square foot in cross section.
1.2.3.3 Unit of Measure
Unit of measure: Square Yard.
1.2.3.4 Payment Item
0006 ARRA - Concrete, Esplanade
1.2.4 Concrete
1.2.4.1 Payment
Payment for these items shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the concrete work, including steel reinforcement, and embedded parts.
1.2.4.2 Measurement
Measurement of concrete shall be made on the basis of the actual volume of
SECTION 01 22 00.00 10 Page 5 concrete within the pay lines of the structures as indicated on the drawings. Measurement of concrete placed against the sides of any excavation without the use of intervening forms shall be made only within the pay lines of the structure, and within the tolerances specified. No measurement will be made of concrete placed outside the tolerances specified or for the excavation unless otherwise approved by the Contracting Officer. No deduction shall be made for rounded or beveled edges or space occupied by metal work, reinforcing steel, electrical conduits or other items, nor for voids or embedded items that are either less than 5 cubic feet in volume or 1 square foot in cross section.
1.2.4.3 Unit of Measure
Unit of measure: Cubic Yard.
1.2.4.4 Payment Item
0007 ARRA - Concrete, Generator Base
1.2.5 Handrail Installation
1.2.5.1 Payment
This work is specified in Section 05 50 13 MISCELLANEOUS METAL FABRICATIONS. Payment for handrail installation will be made for costs associated with furnishing and installing new steel pipe rail as shown on the drawings and as specified.
1.2.5.2 Measurement
Installation of new new handrail will be measured for payment by the linear foot. Measurement shall be made along the top edge of the rail in place and to the end of new rail. Measurement of new handrail will be made along the top rail.
1.2.5.3 Unit of Measure
Unit of Measure: Linear Feet.
1.2.5.4 Payment Item
0008 ARRA - Furnish And Install New Steel Pipe Handrail
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
-- End of Section --
SECTION 01 22 00.00 10 Page 6
| 01 22 00.00 10 - MEASUREMENT AND PAYMENT |
| 01 22 00.00 10 - MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 LUMP SUM PAYMENT ITEMS |
| 1.1.1 Project Sign |
| 1.1.1.1 Payment |
| 1.1.1.2 Unit of Measure |
| 1.1.1.3 Payment Item |
| 1.1.2 Sub TitleAsphalt Pavement Removal |
| 1.1.2.1 Payment |
| 1.1.2.2 Unit of Measure |
| 1.1.2.3 Payment Item |
| 1.1.3 Furnish and Install New Generator |
| 1.1.3.1 Payment |
| 1.1.3.2 Unit of Measure |
| 1.1.3.3 Payment Item |
| 1.2 UNIT PRICE PAYMENT ITEMS |
| 1.2.1 Progress Photographs |
| 1.2.1.1 Payment |
| 1.2.1.2 Measurement |
| 1.2.1.3 Unit of Measure |
| 1.2.1.4 Payment Item |
| 1.2.2 Removal of Concrete Esplanade |
| 1.2.2.1 Payment |
| 1.2.2.2 Unit of Measure |
| 1.2.2.3 Measurement |
| 1.2.2.4 Payment Item |
| 1.2.3 Concrete |
| 1.2.3.1 Payment |
| 1.2.3.2 Measurement |
| 1.2.3.3 Unit of Measure |
| 1.2.3.4 Payment Item |
| 1.2.4 Concrete |
| 1.2.4.1 Payment |
| 1.2.4.2 Measurement |
| 1.2.4.3 Unit of Measure |
| 1.2.4.4 Payment Item |
| 1.2.5 Handrail Installation |
| 1.2.5.1 Payment |
| 1.2.5.2 Measurement |
| 1.2.5.3 Unit of Measure |
| 1.2.5.4 Payment Item |
| PART 2 PRODUCTS NOT APPLICABLE |
| PART 3 EXECUTION NOT APPLICABLE |