W911WN08R0021.pdf
PDF 255 KB Posted
- Solicitation number
- W911WN08R0021
About this file
Solicitation for Grounds and Maintenance Services at Berlin Lake OH. Attachments and Exhibits are provided as separate documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Current Contract.pdf | ||
| Price Schedule Berlin.xls | XLS spreadsheet | |
| W9112N08R00210002.pdf | ||
| W911WN-08-R-0021-0001.pdf | ||
| ATTACHMENTS.pdf | ||
| EXHIBITS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. ARMY ENGINEER DISTRICT, PITTSBURGH
ATTN CECT-LRP
W S MOORHEAD FEDERAL BUILDING
1000 LIBERTY AVENUE ROOM 2116
PITTSBURGH PA 15222-4186
412-644-5109
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$35.5M
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
W911WN-08-R-0021 24-Sep-2008
b. TELEPHONE NUMBER
412-395-7464
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 24 Oct 2008
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
W911WN
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE H4R04C0 16. ADMINISTERED BY
BERLIN LAKE
RENE BERBERICH
US ARMY CORPS OF ENGINEER 7400 BEDELL ROA
BERLIN CENTER OH 44401-9714
TEL: FAX:
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
PAMELA D BROGLIO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
561210
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W81ET482538086
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
1 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
X
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X
X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
W911WN-08-R-0021
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lump Sum Mowing, Mill Creek, Type I
FFP
LUMPSUM = 6 MONTHS @ ________/MO.
FOB: Destination
MILSTRIP: W81ET482538086
PURCHASE REQUEST NUMBER: W81ET482538086
NET AMT
0002 1 Lump Sum Mowing, Dam Site, Type I
FFP
LUMPSUM = 6 MONTHS @ _______/MONTH
FOB: Destination
PURCHASE REQUEST NUMBER: W81ET482538086
0003 1 Lump Sum Mowing, Mill Creek, Type II
FFP
LUMPSUM = 2 ACRES @ __________/ACRE
FOB: Destination
0004 1 Lump Sum Mowing, Damsite, Type II
FFP
LUMPSUM = .5 ACRES @ ________/ACRE
0005 1 Lump Sum Cleaning, Comfort Station w/o Showers
FFP
Weekday Rate
LUMPSUM = 612 CLEANINGS @ _______/CLEANING
0006 1 Lump Sum Cleaning, Comfort Station w/o Showers
FFP
Weekend Rate
LUMPSUM = 460 CLEANINGS @ _______/CLEANING
0007 1 Lump Sum Cleaning of Comfort Station with Showers
FFP
Weekday Rate
LUMPSUM = 136 CLEANINGS @ ____________/CLEANING
0008 1 Lump Sum Cleaning of Comfort Station with Showers
FFP
Weekend Rate
LUMPSUM = 102 CLEANINGS @ ____________/CLEANING
0009 1 Lump Sum Cleaning, Weekly
FFP
Park Ranger Station and Park Manager's Office
LUMPSUM = 52 CLEANINGS @ ____________/CLEANING
0010 1 Lump Sum Cleaning, Weekly
FFP
Maintenance Office and Garage Restroom
LUMPSUM = 52 CLEANINGS @ _________/CLEANING
0011 4 Each Pressure Washing, Comfort Station
FFP
Without Showers
0012 4 Each Pressure Washing, Comfort Station
FFP
With Showers
0013 8 Each Emergency Cleaning
FFP
Comfort Station without Showers
0014 8 Each Emergency Cleaning
FFP
Comfort Station with Showers
0015 4 Each Emergency Cleaning
FFP
Park Ranger Station, Maintenance Office or Park Manager's Office
0016 2 Each Carpet Shampooing
FFP
Park Ranger Station, Park Manager's Office and Maintenance Office
0017 1,148 Each Solid Waste Removal
FFP
1001 1 Lump Sum OPTION Mowing, Mill Creek, Type I
FFP
LUMPSUM = 6 MONTHS @ ________/MO.
1002 1 Lump Sum OPTION Mowing, Dam Site, Type I
FFP
LUMPSUM = 6 MONTHS @ _______/MONTH
1003 1 Lump Sum OPTION Mowing, Mill Creek, Type II
FFP
1004 1 Lump Sum OPTION Mowing, Damsite, Type II
FFP
1005 1 Lump Sum OPTION Cleaning, Comfort Station w/o Showers
FFP
Weekday Rate
1006 1 Lump Sum OPTION Cleaning, Comfort Station w/o Showers
FFP
Weekend Rate
1007 1 Lump Sum OPTION Cleaning of Comfort Station with Showers
FFP
Weekday Rate
1008 1 Lump Sum OPTION Cleaning of Comfort Station with Showers
FFP
Weekend Rate
1009 1 Lump Sum OPTION Cleaning, Weekly
FFP
Park Ranger Station and Park Manager's Office
1010 1 Lump Sum OPTION Cleaning, Weekly
FFP
Maintenance Office and Garage Restroom
1011 4 Each OPTION Pressure Washing, Comfort Station
FFP
1012 4 Each OPTION Pressure Washing, Comfort Station
FFP
1013 8 Each OPTION Emergency Cleaning
FFP
1014 8 Each OPTION Emergency Cleaning
FFP
1015 4 Each OPTION Emergency Cleaning
FFP
Park Ranger Station, Maintenance Office OR Park Manager's Office
1016 2 Each OPTION Carpet Shampooing
FFP
1017 1,148 Each OPTION Solid Waste Removal
2001 1 Lump Sum OPTION Mowing, Mill Creek, Type I
FFP
LUMPSUM = 6 MONTHS @ ________/MO.
2002 1 Lump Sum OPTION Mowing, Dam Site, Type I
FFP
LUMPSUM = 6 MONTHS @ _______/MONTH
2003 1 Lump Sum OPTION Mowing, Mill Creek, Type II
FFP
2004 1 Lump Sum OPTION Mowing, Damsite, Type II
FFP
2005 1 Lump Sum OPTION Cleaning, Comfort Station w/o Showers
FFP
Weekday Rate
2006 1 Lump Sum OPTION Cleaning, Comfort Station w/o Showers
FFP
Weekend Rate
2007 1 Lump Sum OPTION Cleaning of Comfort Station with Showers
FFP
Weekday Rate
2008 1 Lump Sum OPTION Cleaning of Comfort Station with Showers
FFP
Weekend Rate
2009 1 Lump Sum OPTION Cleaning, Weekly
FFP
Park Ranger Station and Park Manager's Office
2010 1 Lump Sum OPTION Cleaning, Weekly
FFP
Maintenance Office and Garage Restroom
2011 4 Each OPTION Pressure Washing, Comfort Station
FFP
2012 4 Each OPTION Pressure Washing, Comfort Station
FFP
2013 8 Each OPTION Emergency Cleaning
FFP
2014 8 Each OPTION Emergency Cleaning
FFP
2015 4 Each OPTION Emergency Cleaning
FFP
Park Ranger Station, Maintenance Office or Park Manager's Office
2016 2 Each OPTION Carpet Shampooing
FFP
2017 1,148 Each OPTION Solid Waste Removal
PRICE SUMMARY
MOWING:
Base Year (Line Items 0001-0004) $_________________________
Option Year 1 (Line Items 1001-1004) $_________________________
Option Year 2 (Line Items 2001-2004) $_________________________
TOTAL $_________________________
CLEANING:
Base Year (Line Items 0005-0017) $_________________________
Option Year 1 (Line Items 1005-1017) $_________________________
Option Year 2 (Line Items 2005-2017) $_________________________
TOTAL $_________________________
PERFORMANCE WORK STATEMENT
This Performance Work Statement is created from a template used for all grounds and maintenance service contracts within the Pittsburgh District. The paragraphs not applicable to this procurement are marked “Reserved”. Only the relevant Exhibits and Attachments are included. The Exhibits contain information that is unique to this procurement and are incorporated by reference.
SECTION 1. GRASS MOWING
1.1 SCOPE OF WORK. The work performed under this section consists of furnishing labor, equipment, fuel, transportation, tools and supplies necessary for mowing and trimming grass and vegetation in strict accordance with these specifications for the areas listed in Exhibit A.
1.2 LOCATION AND SCHEDULE OF WORK. The location and description of the work areas are shown on Exhibit A as well as the schedule of the work to be performed.
1.3 WORK TO BE PERFORMED
1.3.1 General. For the purpose of this contract, mowing is defined as the cutting of grass, weeds, vines, or other vegetation. Trimming is defined as the cutting of grass, weeds, vines, or other vegetation around items such as buildings, sidewalks, guardrails, posts, instruments, telephone poles, drinking fountains, grills, campsites, fire rings, picnic tables, trees, shrubbery, curbing, stone slope protection areas, bumper blocks in camping and parking areas, and other such obstacles.
1.3.1.1 Ordering Mowings. When a Task Order is issued to mow a designated area, mowing shall be completed in the order and within the period of performance specified by the COR (either by weekly work order or the approved Contractor's schedule). This excludes variances, i.e. weekends, holidays, or other variances allowed or required by the COR. All variances allowed or required by the COR will be submitted to the Contractor in writing. The COR may cancel a mowing and/or trimming operation under special circumstances, e.g., wet ground or safety hazards. An amount shall be deducted from the task order equal to the cost of mowing/trimming the area where a service was cancelled. (The deduction will be the amount equal to the percentage of the acreage of the corresponding Contract Line Item that was not mowed and/or trimmed.)
1.3.1.2 Grass Height. Mowing and trimming in each area must be done in such a manner as to provide uniform grass height. The heights of cuts are broken into two different types: Type I Cut—the required cut height is three inches and normally mowed when the grass height is less than six inches. Type II Cut—the required cut height is five inches and is intended for meadows and fields with high grass.
1.3.1.3 Mowing Hours. Work to be performed in secured areas shall be accomplished during normal project work hours (see Section 12.3). Mowing in camping areas shall be performed Monday through Thursday, between 9:00 a.m. and 6:00 p.m. Mowing and trimming operations shall not be conducted on Saturdays, Sundays, or federal holidays unless approved in writing, in advance, by the COR. Work approved for weekends or holidays shall be at no additional expense to the Government.
1.3.2 Mowing Operations. All mowing operations shall be conducted to protect the grass, sod, equipment, trees and shrubs in the areas, and to ensure the safety of all persons in the vicinity of the mowing operations.
1.3.2.1 It shall be the responsibility of the Contractor to locate each geotechnical instrument within the mowing limits prior to each mowing and ensure that the instruments are visible to the employees working in the area. The Contractor shall be responsible for any damage to such geotechnical instruments during mowing. The Contractor shall also be held responsible for damage/breakage to water shutoff valves, risers, caps, and other Government property.
1.3.2.2 The Contractor shall be liable for replacement of trees and shrubs damaged by mowing equipment.
The Contractor will be required to replace any damaged tree or shrub; the replacement item shall be approved by the COR before installation. If a replacement tree or shrub dies within a year, the Contractor shall replace it. If Contractor chooses not to replace a damaged tree or shrub, the cost of the labor and materials necessary to replace the damaged tree or shrub will be deducted from the Contractor's next payment.
1.3.2.3 Prior to Mowing. Prior to mowing an area, the area shall be inspected for all visible trash, garbage, debris, drift, dead leaves and limbs, and such material shall be disposed of in accordance with Section 11, ENVIRONMENTAL PROTECTION. Should such material be struck by a mower and scattered, the scattered pieces shall be picked up and disposed of before leaving the area. Fallen trees shall be placed at a convenient location for future pickup by the Contractor. It shall be the Contractor's responsibility to remove grass clippings, litter, etc., that are cut up by the mower blades, from the road, sidewalks, areas under picnic tables, parking lots, camping pulloffs, benches, etc.
1.3.2.4 Soft and Damp Areas. All soft and damp areas shall be mowed assuring no damage or ruts to the landscape.
1.3.3 Trimming. All trimming of an area shall be performed in conjunction with the mowing of the area and shall be completed within 24 hours of completion of the mowing. Trimming shall ensure that all vegetation adjacent to woody plants and structures, including, but not limited to, buildings, fences, signs, and surface areas be uniform in height as designated for each area in Exhibit A.
1.3.3.1 Alternative Herbicide Application. The Contractor may elect, at no additional cost to the Government, to apply herbicide in accordance with herbicide application guidance contained in Section 2, MAINTENANCE OF LANDSCAPED AREAS in order to reduce or eliminate mechanical trimming.
1.3.4 Removal of Grass Clippings. The Contractor shall gather clippings from mowed areas only when requested by the COR. All clippings shall then be removed by the Contractor, and disposed of as specified in Section 11, ENVIRONMENTAL PROTECTION. This applies only to areas which are mowed on a regular basis; it does not apply to areas which are mowed less than twice a month during the mowing season.
1.4 SAFETY. In addition to the Occupational Safety and Health Act (OSHA) Safety Standards and Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1 (http://www.usace.army.mil/publications/eng-manuals/em385-1-1/toc.htm), the Contractor shall comply with the following:
1.4.1 On steep and uneven terrain, use of flails or similar mowing apparatus shall not be permitted.
1.4.2 Safety glasses with side shields, long pants, hard hats, and safety shoes shall be the minimum safety apparel worn by people operating any mowing or trimming equipment.
1.4.3 All riding equipment, used on slopes of 3 horizontal to 1 vertical or steeper, shall have rollover protection in addition to seat belts.
1.4.4 A standard "Mowing Ahead" sign in accordance with the Manual of Uniform Traffic Control Devices (http://mutcd.fhwa.dot.gov/ ) shall be erected on each end of mowing operations at every area when mowing is in progress within five feet of a roadway.
SECTION 2. RESERVED
SECTION 3. CLEANING SERVICES
3.1 SCOPE OF WORK. The work performed under this section consists of furnishing labor, equipment, fuel, transportation, tools and supplies necessary for the performance of the services described herein for the areas, facilities and equipment listed in Exhibit C.
3.2 SCHEDULE AND LOCATION OF WORK. The schedule and location for each service are shown in Exhibit C.
3.3 WORK TO BE PERFORMED.
3.3.1 General.
3.3.1.1 All trash and debris, drift, ashes and garbage shall be removed as required and deposited in a designated solid waste container.
3.3.1.2 All cleaning services within work areas, offices, buildings, picnic areas and campgrounds shall be performed so as not to interfere with the users.
3.3.1.3 The restrooms shall be closed during cleaning.
3.3.1.4 Nuisance Insects. If nuisance insects (including but not limited to wasps, hornets, and yellow jackets) are observed to be swarming or to have a nest within the limits of any area maintained under this contract, the Contractor shall take the necessary steps to exterminate and remove the insects and nest. This item will be considered incidental to the cleaning and policing of buildings and grounds. No separate payment will be made for removal of insects.
3.3.2 Restroom, Locker Room, and Washhouse.
3.3.2.1 All interior floors, walls, windows, doors, louvers, sills, light covers, fixtures, mirrors, shower curtains and stalls, benches, partitions (exterior and interior), wash basins, and interior trash receptacles, shall be cleaned during each service.
3.3.2.2 Cleaning shall also include the removal of all dust from window sills and screens and the removal of insects and insect nests.
3.3.2.3 Lockers. If lockers are present in the cleaning area, the outside of the lockers shall be cleaned and dusted.
3.3.2.4 All shower stalls, toilets, inside of vault toilet seats, urinals, sinks, and floors shall be sanitized during each cleaning. All toilet tissue fixtures shall be checked and filled during each cleaning. An equivalent of one full roll of any toilet paper shall be maintained per fixture.
3.3.2.5 All drawings, writings, or graffiti that can be removed with commercially available cleansers or solvents shall be removed.
3.3.2.6 Exterior drinking fountains attached to restroom buildings will be considered part of the restroom and will be cleaned as part of a restroom service.
3.3.2.7 All surfaces shall be thoroughly rinsed and excess water removed. There shall be no soap film or residue left after any cleaning operations.
3.3.2.8 Minor Maintenance. During each cleaning the Contractor shall perform minor maintenance to insure continued operation of subject facilities. Such maintenance shall include, but not be limited to, tightening loose fittings, screws or bolts, checking and turning off water faucets, cleaning drains with a plunger and/or snake, and replacing all burned-out light bulbs and damaged or worn out shower curtains.
3.3.2.9 Reporting Maintenance Requirement. On each day work is performed, the Contractor shall report the following to the COR:
3.3.2.9.1 Malfunctioning or damaged fixtures. The Contractor shall turn off water to that fixture.
3.3.2.9.2 Damaged toilet paper holders, broken windows, screens, or mirrors or any damage which could cause injury. If injury could result from the use of a damaged item, the Contractor shall remove the item from service and report such action immediately to the COR.
3.3.2.9.3 Leaks in plumbing which cannot be stopped by the tightening of a fitting.
3.3.2.9.4 Damaged door latches which cannot be repaired by the tightening of a screw or bolt.
3.3.2.9.5 Floor, sink and shower drains and toilets which cannot be unplugged by a plunger and/or snake.
3.3.2.10 Power Outages. When "No Power" complaints are received for restrooms or washhouses, the Contractor shall check the ground fault circuit interrupter for that service and reset the circuit interrupter or breaker or replace fuses, as necessary. If power is still off, the condition shall be reported to the COR for repair, and the affected restroom or washhouse shall be locked up as requested by the COR. A sign (provided by Contractor) informing the public that the restroom is out of order shall be installed.
3.3.2.11 Pest and Odor Control. The Contractor shall place devices approved by the COR in the restrooms or washhouses for the control of pests. The Contractor shall add odor control material to vault toilets the first cleaning each week. The material shall cover the entire contents of the vault.
3.3.2.12 Water Problems. If a restroom or washhouse does not have water, the Contractor shall inspect it to determine the cause. If the cause is a closed valve, the valve shall be opened if possible; if not, the affected building shall be locked up, a sign (provided by the Contractor) shall be placed on the facility to notify the public, and the COR shall be notified.
3.3.2.13 Pressure Wash. The interior and exterior of the building shall be cleaned when ordered using a pressure sprayer.
3.3.3 Emergency Cleaning for Restrooms and Washhouses. At times emergency cleanings may be necessary due to heavy use or vandalism. These cleanings will be ordered by the COR, usually by telephone. The Contractor shall begin the service within 12 hours of the order.
3.3.4 Project Offices/Visitor Centers. All items listed in 3.3.4.1 through 3.3.4.18 are to be cleaned each service.
3.3.4.1 Floors. When completing the floor work listed below, furniture should be moved, as necessary, to assure that all areas are cleaned. Furniture shall be replaced as work is completed.
3.3.4.2 Uncarpeted Floors. All uncarpeted floors shall be swept and wet mopped or vacuumed during each cleaning service. A disinfectant cleaner shall be used for all mopping work. All floors shall look clean and all scuff marks shall be removed by the Contractor.
3.3.4.3 Carpeted Floors. All carpeted floors shall be vacuumed each cleaning service, including corners and floor molding. Throw rugs and rubber mats shall be thoroughly vacuumed or shaken outside.
3.3.4.4 Windows. All windows, interior and exterior, including windows in doors shall be kept clean.
Windows shall be washed with an approved cleaner. Sills and venetian blinds shall be dusted each cleaning.
3.3.4.5 Doors. All doors, interior and exterior, shall be dusted and cleaned; all smudge or dirt marks shall be removed.
3.3.4.6 Furniture (Desks, Tables, Chairs, Stools, Bookcases, Map Cabinets, etc.) Dust and wipe all vertical and horizontal surfaces.
3.3.4.7 Drinking Fountains. Drinking fountains shall be cleaned and disinfected.
3.3.4.8 Pictures and Displays. All picture frames and exhibits shall be dusted.
3.3.4.9 Baseboards. All baseboards shall be dusted and cleaned of any scuff marks or soiled areas.
3.3.4.10 Lights. Light fixtures and covers shall be cleaned. Burned-out light bulbs shall be replaced on the inside and outside of buildings under this cleaning service.
3.3.4.11 Heating - Cooling Return and Grills. Grills shall be cleaned to remove dust and foreign matter.
3.3.4.12 Walls and Ceiling (Interior), i.e., dust, wipe and spot clean walls as needed and remove cobwebs, etc., from corners of walls and ceiling each service.
3.3.4.13 Lunch Areas. Clean horizontal and vertical surfaces, e.g., cabinets and tables, stove/Microwave (outside), refrigerator (outside), sink, counter top and drainboard.
3.3.4.14 Trash receptacles - empty contents. Replace liners if soiled or torn.
3.3.4.15 Furnace Room.
3.3.4.15.1 Dust equipment, ducts and walls.
3.3.4.15.2 Sweep or vacuum floor.
3.3.4.16 Walls and Ceilings (Exterior). All cobwebs, spider webs, insect nests, bug and animal waste, dirt, etc., shall be removed from walls in corners, roof overhang and air conditioner units. All insect nests shall be sprayed with a pesticide approved by COR and all traces of the nest removed from bottom side of gutters, overhang, air conditioner units and exterior of building.
3.3.4.17 Exterior Walkways. Walkways around buildings shall be swept clean of all dirt, animal, plant, insect and bird waste material.
3.3.4.18 Restrooms not having outside public entrance will be cleaned as part of the office/visitor center cleaning. Restrooms with an outside entrance shall be ordered and paid as a separate line item under paragraph 3.2 above.
3.3.4.19 RESERVED
3.3.4.20 Shampooing or Steam Cleaning of Carpeted Floors. All carpeted floors shall be shampooed or steam cleaned when ordered.
3.3.5 RESERVED
3.3.6 RESERVED
3.3.7 RESERVED
3.3.8 RESERVED
3.3.9 RESERVED
3.3.10 RESERVED
3.3.11 RESERVED
3.3.12 RESERVED
3.3.13 RESERVED
3.4 RESERVED
SECTION 4. SOLID WASTE REMOVAL
4.1 SCOPE OF WORK. The work to be performed under this Section consists of furnishing all necessary labor and equipment to collect and dispose of trash and garbage in the areas designated in Exhibit D.
4.2 SCHEDULE OF WORK. Collections shall be made as listed in Exhibit D.
4.3 LOCATION OF WORK. The number and type of receptacles required and their locations are provided in Exhibit D.
4.4 WORK TO BE PERFORMED
4.4.1 It shall be the responsibility of the Contractor to comply with all state and local laws and regulations concerning solid waste disposal. Disposal shall be done only at a site approved for that purpose.
4.4.2 A letter of compliance and a signed release from the dump site property owner will be furnished to the Government during the Post-Award Conference.
4.4.3 Vehicles shall use the existing service roads. Gross vehicle weight restrictions for Government roads, if any, are listed in Exhibit D. Any state or local road use permits required shall be the responsibility of the Contractor.
4.4.4 The Contractor shall supply and service the receptacles identified in Exhibit D. These receptacles shall be in place 48 hours before the first scheduled pickup. The Contractor-furnished receptacles shall be maintained in an operationally safe, serviceable condition at all times.
4.4.5 Complete Pickup Service. The following specific services shall be performed as one complete pickup service:
4.4.5.1 Removal of all contents of the dumpster/garbage receptacles and all trash, paper, bottles, cans and other debris on the ground within a ten-foot radius of each dumpster/garbage receptacle.
4.4.5.2 Containers shall be returned to their original locations with lids closed.
SECTION 5. RESERVED
SECTION 6. RESERVED
SECTION 7. RESERVED
SECTION 8. RESERVED
SECTION 9. RESERVED
SECTION 10. RESERVED
SECTION 11. ENVIRONMENTAL PROTECTION
11.1 SCOPE OF WORK. This section covers prevention of environmental pollution or damage resulting from operations performed under this contract. For the purpose of these specifications, environmental pollution or damage is defined as impacts or conditions resulting from work performed under this contract which adversely impact human health or welfare, unfavorably alter ecological balances, adversely impact fish or wildlife or the habitats upon which they depend, or otherwise diminish the utility of the environment for aesthetic, cultural or historical purposes. The prevention and control of environmental pollution requires management of a wide range of pollutants, including visual aesthetics, noise, solid waste, radiant energy, pesticides, radioactive materials, and other pollutants. No separate payment or direct payment will be made for the cost of the work covered under this section.
11.2 WORK TO BE PERFORMED.
11.2.1 Quality Control. The Contractor shall establish and maintain quality control for environmental protection as set forth herein. The Contractor shall comply with all federal, state and local environmental protection laws and regulations. The Contractor shall notify the COR immediately of any problems which may exist in complying with any environmental laws or regulations. The Contractor shall record any compliance problems and corrective action taken and submit to the COR.
11.2.2 Subcontractors. Assurance of compliance with this section by subcontractors will be the responsibility of the Contractor.
11.2.3 Protection of Environmental Resources. The environmental resources within the project boundaries shall be preserved in their present condition or restored after completion of operations. The Contractor shall confine his activities to areas actually required to perform the work. Environmental protection shall be as stated in the following paragraphs.
11.2.3.1 Protection of Land Resources. Prior to the commencement of any work, the Contractor shall coordinate with the COR to identify all land resources to be preserved within the Contractor’s work areas. Stone, earth or other material that is displaced from the work area shall be removed.
11.2.3.1.1 Work Area Limits. Prior to commencement of any work, the Contractor shall coordinate with the COR in marking areas that are not required to accomplish work to be performed under this contract.
11.2.3.1.2 Reduction of Exposure of Unprotected Erodible Soils. All earthwork shall be planned and conducted to minimize the duration of exposure of unprotected soils.
11.2.3.1.3 Temporary Protection of Disturbed Areas. Such methods as necessary shall be utilized to effectively prevent erosion and control sedimentation, including, but not limited to, construction of diversion ditches, benches, and berms to retard and divert runoff or construction of silt fences or straw or hay bale barriers to control runoff.
11.2.3.1.4 Temporary Sanitary Facilities. Sanitary wastes shall not be discharged into waterways or onto the soil surface. All temporary toilets shall be equipped with approved septic tanks with safe drainage or closed holding tanks, which shall be emptied into approved treatment plants.
11.2.3.2 Preservation and Recording of Historical, Archeological and Cultural Resources. If the Contractor observes any unusual items that may have historical or archeological value, such observations shall be reported within a week to the COR so that the proper authorities may be notified. The Contractor shall leave the archeological item undisturbed and shall protect the site and material until instructions are provided by the COR.
11.2.3.3 Protection of Water Resources. The Contractor shall manage all activities to avoid pollution of surface and ground waters. The Contractor shall investigate and comply with all applicable federal, state, and local laws and regulations concerning pollution of rivers and streams.
11.2.3.3.1 Stream Crossings. Stream crossings shall be avoided during operations. Should stream crossings involving the transport of materials or vehicles be necessary, all appropriate permits will be secured beforehand and shall be in accordance with all applicable federal, state and local laws and regulations.
11.2.3.3.2 Spillages. Special measures shall be taken to prevent chemicals, fuels, oils, greases, waste washings, pesticides, herbicides and insecticides from entering public waters.
11.2.3.3.3 Monitoring of Water Areas. Monitoring of water areas affected by the Contractor's operations shall be the responsibility of the Contractor. Monitoring of these areas shall be in accordance with all applicable federal, state and local laws and regulations.
11.2.3.4 Protection of Fish and Wildlife. The Contractor shall manage all activities to minimize interference with, disturbance to, and damage of, fish and wildlife. The Contractor is not permitted to alter water flows or otherwise disturb native habitat adjacent to the project area which are critical to fish or wildlife.
11.2.3.5 Protection of Air Resources. The Contractor shall manage all activities to minimize pollution of air resources. All activities performed by the Contractor shall be in strict compliance with all applicable federal, state and local emission and performance laws and standards. Special management techniques as set forth below shall be implemented to control air pollution.
11.2.3.5.1 Particulates. Dust particles, aerosols, and gaseous by-products from all activities shall be controlled at all times.
11.2.3.5.2 Hydrocarbons and Carbon Monoxide. Hydrocarbons and carbon monoxide emissions from equipment shall be controlled to federal and state allowable limits at all times.
11.2.3.5.3 Odors. Odors shall be controlled at all times for all activities, processing and preparation of materials.
11.2.3.5.4 Monitoring of Air Quality. Monitoring of air quality shall be the responsibility of the Contractor.
All air areas affected by the Contractor’s activities shall be monitored by the Contractor as required by all applicable federal, state and local regulations.
11.2.4 Disposal of Solid Wastes. All handling and disposal shall be conducted to prevent contamination.
Unless otherwise specified, the Contractor shall transport all solid waste from Government property and dispose of it in compliance with federal, state, and local requirements for solid waste disposal. All expenses of arranging for and obtaining the disposal area shall be borne by the Contractor. The Contractor shall be responsible for all operations in connection with the disposal. Disposal of any materials, wastes, effluents, trash, garbage, oil, grease, chemicals, or other debris in areas adjacent to the river or lake will not be permitted. If any waste material is dumped in unauthorized areas, the Contractor shall remove the material and restore the area to its original condition. If necessary, contaminated ground shall be excavated and replaced with suitable fill material, compacted and finished with topsoil and planted as required to reestablish vegetation.
11.2.5 Restoration of Landscape Damage. Any trees or other landscape feature, scarred or damaged by the Contractor's equipment or operations, shall be restored, as nearly as possible, to its original condition at the Contractor's expense. The COR will determine what method of restoration shall be used and whether damaged trees shall be treated and healed or removed and disposed of. This work shall be accomplished at the Contractor's expense. Restoration of scarred and damaged trees shall be performed in accordance with Section 2.
11.2.6 Maintenance of Pollution Control Facilities. The Contractor shall maintain all facilities required for pollution control under this contract as long as the operations creating the particular pollutant are being carried out or until the material concerned has become stabilized to the extent that pollution is no longer being created.
11.2.7 Training of Contractor Personnel in Pollution Control. The Contractor shall train his personnel in all phases of environmental protection. The training shall include methods of detecting and avoiding pollution, familiarization with pollution standards, both statutory and contractual, and installation and care of facilities to ensure adequate and continuous environmental pollution control.
SECTION 12. SPECIAL CONTRACT REQUIREMENTS
12.1 WORKING HOURS. Normal Working Hours. Normal Government working hours are Monday through Friday, except federal holidays, 7:30 a.m. to 4:00 p.m. Except as otherwise specified or indicated by the COR, work inside Government buildings or other secured areas shall be performed during normal work hours. The ten federal holidays are:
New Years Day (January 1st)
Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May)
Independence Day (July 4th)
Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veterans Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When a federal holiday falls on a Sunday, the following Monday is observed as a legal holiday. When a federal holiday falls on a Saturday, the preceding Friday is observed as a holiday.
12.2 INTERRUPTIONS TO SYSTEMS. All work that would necessitate an interruption of the use of the project or to the systems or otherwise disrupt building occupants and/or the visiting public shall be fully coordinated and approved in advance by the COR. Interruptions shall be kept to an absolute minimum, and all repairs and replacements of equipment or components shall be accomplished in an expeditious and efficient manner.
12.3 POST-AWARD CONFERENCE. A Post-Award Conference may be scheduled by the Government prior to the initiation of work under this contract. The purpose of the conference is to review the terms and conditions of the contract, finalize the Quality Assurance Surveillance Plan, and review the Quality Control plan. During this meeting, the Contractor shall provide the items listed in Attachment 3.
12.4 SECURITY REQUIREMENTS. The Contractor will provide a certification to the Government at the Post-Award Conference that their employees and any subcontractors have undergone a local police check for any record of criminal activity including, but not limited to, drugs and child abuse, with negative results.
12.5 CONTRACTOR QUALITY CONTROL PLAN. The Contractor shall establish a quality control plan to assure the requirements of the contract are provided as specified. This plan must be submitted to the Government at the Post-Award Conference. The plan shall be reviewed by the COR and approved within two weeks of receipt.
An approved copy of the Quality Control Plan shall be provided to the Contracting Officer each year or as changes occur. The plan shall include, but not be limited to:
12.5.1 An inspection system covering all the work stated in the contract specifications. It shall specify areas to be inspected on either a scheduled or unscheduled basis and identify the individuals who will do the inspections.
12.5.2 A method of identifying deficiencies in the quality of work performed before the level of performance becomes unacceptable.
12.5.3 A file of all inspections conducted by the Contractor and the corrective actions taken. This documentation shall be made available to the COR. A suggested format for the Quality Control Plan is contained in Attachment 4.
12.6 QUALITY ASSURANCE. The Government will monitor the Contractor's performance in each functional area under this contract and reserves the right to use whatever additional surveillance procedures it deems appropriate. The Government will monitor performance to insure compliance using a Quality Assurance Surveillance Plan (QASP) but reserves the right to alter the plan at its own discretion. The QASP is included in Attachment 5 for information purposes only. The Government reserves the right to change methods of inspection as deemed necessary.
12.7 TASK ORDERS. All work under this contract will be ordered by issuance of Task Orders (DD Form 1449) from the Contracting Officer; the task order will identify the work for completion during the performance period and provides the funding for the work. In some instances a weekly work order will be issued by the COR that more specifically describes the tasks for completion during that week. A sample Task Order is shown in Attachment 6.
12.8 CONTRACTOR WORK SCHEDULE. If directed by the COR, prior to beginning work under a Task Order, the Contractor shall provide to the COR a schedule for completion of the services ordered. Any change in this schedule shall be submitted to the COR at least two weeks in advance of the change, unless otherwise approved by the COR. A sample Contractor Work Schedule is shown as Attachment 7.
12.9 SAFETY REQUIREMENTS. The Contractor shall comply with all current provisions of the Occupational Safety and Health Act (OSHA) in addition to the requirements of the Corps of Engineers Manual, EM 385-1-1, "Safety and Health Requirements Manual" http://www.usace.army.mil/publications/eng-manuals/em385-1- 1/tl.pdf, or as otherwise indicated herein. If the Contractor fails or refuses to promptly comply with safety and security requirements as specified herein, the Contracting Officer may issue a stop work order for all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such stop order shall be made subject to a claim for extension of time or for excess costs or damages to the Contractor. The Contractor will not be paid for work not performed as a result of the stop order.
12.10 DAMAGE REPORTS. In all instances where Government property and/or equipment is damaged by Contractor employees, a full report of the incident and extent of such damage shall be submitted to the COR within two work days of occurrence.
12.11 DEFICIENCIES.
12.11.1 Reperformance. If any of the work performed does not conform to contract requirements, the Government may require the Contractor to perform the work again at no cost to the Government. When the defect in work cannot be corrected by reperformance, or cannot be corrected in the specified time frame, the Government may, by separate contract or otherwise, perform the work and charge the Contractor any costs incurred by the Government that are directly related to the performance of such work. The actual cost includes, but is not limited to, labor costs including benefits, transportation, and materials.
12.11.2 Contract Deficiency Report (CDR) (DD2772). A CDR will be issued to the Contractor for any failure to perform (see Attachment 8). The CDR describes the deficiency or problem and will be discussed with the Contractor or his representative when it is issued. The Contractor shall provide his written response on the CDR form within 24 hours of issuance. The Contractor's response shall identify the cause and corrective action taken and identify corrective actions. The COR will evaluate the Contractor's response and record the corrective action to be taken, which may include deductions in payment. Upon finalization of the CDR, the Contractor and the COR shall sign the form and the Contractor will be given a copy of the completed form. Should the Contractor not concur with any decision or finding, the Contractor may so state, in writing, and request a final decision by the Contracting Officer. The Contracting Officer will review all CDRs issued; CDRs will also become a part of the permanent contract file.
12.12 CONTRACTOR PERFORMANCE EVALUATIONS: In accordance with the provisions of FAR 42.15, Contractor Performance Information, and supplements thereto, the Contractor’s performance for service contracts awarded at or above $1,000,000.00 shall be evaluated throughout performance of the contract. The Government uses a web-based system, Contractor Performance Assessment Reporting System (CPARS), to prepare interim and final performance evaluation reports. In addition, an "interim" assessment report may be prepared at the completion of 12 months' performance of a service contract of any dollar value and annually thereafter until the contract is physically complete. After USACE prepares an interim or final evaluation, the Contractor has the ability to access, review and comment on the evaluation for a period of 30 days. Access to CPARS requires specific software, called PKI certification, which is installed on a specific user's computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. Current information about the PKI certification process can be found on the web site: http://www.cpars.navy.mil/. If the Contractor wishes to participate in the performance evaluation process, access to CPARS and PKI certification is the sole responsibility of the Contractor. The specific elements that will be used to evaluate performance will be discussed in further detail at the Post-Award Conference held with Government and Contractor personnel after award of the contract.
12.13 RESERVED
EXHIBITS AND ATTACHMENTS
The following Exhibits and Attachments are provided as separate documents: Exhibits A, C, and D, incorporated herein by reference; Attachments 3, 5, 6, 7, 8, and 9.
Exhibits B, E, F, G, H, and I as well as Attachments 1, 2, and 4 do not pertain to this procurement and are therefore NOT included.
CLAUSES INCORPORATED BY FULL TEXT
52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (FEB 2007)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights (1) within a reasonable time after the defect was discovered or should have been discovered; and
(2) before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.
(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.
(d) Disputes. This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. 601-613). Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.
(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.
(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement or any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(g) Invoice. (1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--
(i) Name and address of the Contractor;
(ii) Invoice date and number;
(iii) Contract number, contract line item number and, if applicable, the order number;
(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;
(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;
(vi) Terms of any discount for prompt payment offered;
(vii) Name and address of official to whom payment is to be sent;
(viii) Name, title, and phone number of person to notify in event of defective invoice; and
(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.
(x) Electronic funds transfer (EFT) banking information.
(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.
(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer--Central Contractor Registration, or 52.232-34, Payment by Electronic Funds Transfer--Other Than Central Contractor Registration), or applicable agency procedures.
(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.
(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.
(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.
(i) Payment.--
(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.
(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C.
3903) and prompt payment regulations at 5 CFR part 1315.
(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.
(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.
(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall immediately notify the Contracting Officer and request instructions for disposition of the overpayment.
(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:
(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or
(2) Delivery of the supplies to the Government at the destination specified in the…