ATTACHMENTS.pdf

PDF 1 MB Posted

Attached to
Grounds and maintenance and Janitorial services for Berlin Lake, OH.
Solicitation number
W911WN08R0021
Issued by

About this file

Attachments for W911WN08R0021

View the file

Other files

File Type Posted
Current Contract.pdf PDF
Price Schedule Berlin.xls XLS spreadsheet
W9112N08R00210002.pdf PDF
W911WN-08-R-0021-0001.pdf PDF
EXHIBITS.pdf PDF
W911WN08R0021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 3

ITEMS FOR CONTRACTOR TO BRING TO POST-AWARD CONFERENCE

• Name(s) and contact information for the Contractor's authorized representatives.

• Name(s) and contact information for Contractor's Quality Control Inspectors(s).

• The name and phone number(s) of Contractor's Emergency Contact.

• A letter of compliance and a signed release from the dump site property owner (Ref:

Section 4.4.2).

• A letter from either the sewage plant accepting sewage or the state environmental agency approval of an alternate dump site (Ref: Section 5.4.4).

• Certification that contractor's employees and those of any subcontractors have undergone a local police check for any record of criminal activity including, but not limited to, drugs and child abuse, with negative results. (Ref. Section 12.4)

ATTACHMENT 5—QUALITY ASSURANCE SURVEILLANCE PLAN

1. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). This plan will be used to assure the Government that the work specified under this contract is completed satisfactorily. This plan is included for information purposes and will not be made part of any resulting contract. Payment analysis will be conducted by using the Random, Periodic Inspection, or 100% sampling methods; however, the Government has the right to change or modify surveillance methods at its discretion.

2. DEFINITIONS.

a. Acceptable Quality Level (AQL). The AQL is a predetermined value selected and used by the Government Quality Assurance Inspector to distinguish between satisfactory and unsatisfactory performance. For evaluation by Random sampling, AQLs are stated in percentages (i.e., 95%, 90%, etc.) in accordance with Table 1. The AQL table has three parts: Population Size, sample size, and the allowable reject level.

i. Population Size—the total number of required services from which a sample is to be drawn. Example: 505 picnic sites to be cleaned each day x 20 cleaning days/mo. (inspection period) = Population Size of 10,000

ii. Sample—the number of samples to be taken. Example: AQL is 90% and Population Size is 10,000 = Sample of 26

iii. Reject level—the allowable margin of error allowed the Contractor under the Random sampling method. When the observed total number of defects per inspection period is equal to or below the Reject Level, the work will be considered satisfactory; if above, the work will be considered unsatisfactory.

An unsatisfactory rating will require corrective action and/or deductions.

Notification of unsatisfactory performance will be provided in the form of a Contractor Discrepancy Report (CDR). Example: AQL of 90%, Population of 10,000, Sample Size of 26 = Reject Level of 6.

3. PAYMENT ANALYSIS

a. Random Sampling Method: Surveillance based on random sampling is a Government quality assurance evaluation method designed to evaluate some part, but not all, of the contract service requirements being monitored. This method is based on statistical theory and estimates the Contractor's overall level of performance for a given service requirement. Random sampling is considered where there is a large, homogeneous population and 100% surveillance is not feasible. Surveillance of the results of a scheduled service is based on samples from finished work using the Random Sample Table. These results are compared to the specified performance standards.

i. Monitoring: Inspection of all services performed under this method will be conducted according to a schedule developed by the Government. Inspection samples will be selected randomly from each lot. Only those items appearing in the random samples will be used for evaluating performance.

ii. Deductions: Once a random sample has been taken of a lot, and the number of defective items exceeds the Reject Level for that lot, a deduction will be calculated as follows:

a) Population Size is 10,000 units.

b) Monthly contract price for cleaning picnic sites is $5,050.00

c) Sample size, using an AQL of 90%, is 26

d) Number of defects in the sample is 8 (Reject Level is 6)

e) Percentage of defects is 30.8% (8 ÷26 = 0.308)

f) Deduction from the current month's invoice is $1,555.54 ($5,050 x

0.308 = $1,554.54).

b. Periodic Inspection Method. Surveillance by Periodic Inspection, like Random Sampling, is designed to inspect some part, but not all of the contract service requirements being monitored. Periodic Inspection under this plan will differ from Random Sampling only in the way in which samples are selected. Periodic inspection will be used in lieu of random sampling when the population size is not large enough to make the random tables practical or the service is not critical enough to warrant 100% inspection or to avoid excessive travel and loss of productive time for the inspector. The results of these inspections, like random sampling, are then compared to the specific performance standards.

EXAMPLE: The inspector is to inspect bulletin boards. Bulletin board population size is only 38 and occurs in only one park and the headquarters area. If the random sampling method determines that the inspector must inspect the cleaning service of restrooms in a particular park that contains a bulletin board, then the inspector may chose to inspect the cleaning of that bulletin board in that same park rather than drive to another park to make a separate, similar inspection.

i. Monitoring: Inspection of all services performed under this method will be conducted according to a schedule developed by the Government. The Government may, however, choose facilities it wishes to inspect without randomly selecting. Only those samples will be used for evaluating performance.

ii. Deductions: Once a periodic inspection has been performed, and the number of defective items exceeds the Maximum Allowable Deviation from Requirement for that population (see Table 2), a deduction will be made based on the following example:

a) Contract price for bulletin boards is $19.00

b) Number in sample is 15 services per month

c) Number of deviations/defects in the sample is 6 (Max. Allowable Deviation is 4)

d) Percentage of sample defective is 40% (6/15 = 0.40)

e) Deduction for the current month is $7.60 ($19.00 x 0.40 = $7.60)

c. 100% Inspection Method: Surveillance by this method requires that every occurrence of a performed service be monitored. Contract requirements using these evaluations are generally that occur infrequently, are essential, or are costly to perform. These results are then compared to the specific performance standards.

i. Monitoring: Inspection of all services performed under this method will be conducted according to a schedule developed by the Government. All services in a Population will be inspected and used for evaluation purposes.

ii. Deductions: Below is an example of deductions taken under this method:

a) Population size is 60

b) Monthly lot contract price for cleaning campsites in a park is $1,200.00

c) Sample size is 100% or 60

d) Number of defects is 15

e) Percentage of sample defective is 25% (15 ÷60 = .25)

f) Deduction for the current month is $300 ($1,200 x 0.25)

TABLE 1—RANDOM SAMPLING

ACCEPTABLE QUALITY LEVELS (AQLs) 95% 90% 85% 80% Population

Size Sample

Size Reject Level

Sample Size

Reject Level

Sample Size

Reject Level

Sample Size

Reject Level

50 15 3 17 4 19 5 21 7 75 16 3 19 4 22 6 24 8 100 17 3 21 5 24 6 26 8 125 18 3 22 5 25 7 28 9 150 18 3 22 5 26 7 29 9 175 19 3 23 5 26 4 29 9 200 19 3 23 5 27 7 30 9 225 19 3 24 5 27 7 30 9 250 19 3 24 5 27 7 31 10 275 19 3 24 5 28 7 31 10 300 20 3 24 5 28 7 31 10 325 20 3 24 5 28 7 32 10 350 20 3 24 5 28 7 32 10 375 20 3 25 5 28 7 32 10 400 20 3 25 5 29 8 32 10 450 20 3 25 5 29 8 33 10 500 20 3 25 5 29 8 33 10 550 20 3 29 5 29 8 33 10 600 20 3 25 5 29 8 33 10 650 20 3 25 5 29 8 33 10 700 20 3 25 5 29 8 33 10 750 20 3 25 5 30 8 33 10 800 20 3 25 5 30 8 34 11 900 20 3 26 6 30 8 34 11

1,000 21 4 26 6 30 8 34 11 1,200 21 4 26 6 30 8 34 11 1,400 21 4 26 6 30 8 34 11 1,600 21 4 26 6 30 8 34 11 1,800 21 4 26 6 30 8 34 11 2,000 21 4 26 6 30 8 34 11 2,500 21 4 26 6 30 8 35 11 3,000 21 4 26 6 30 8 35 11 3,500 21 4 26 6 31 8 35 11 4,000 21 4 26 6 31 8 35 11 5,000 21 4 26 6 31 8 35 11 6,000 21 4 26 6 31 8 35 11 8,000 21 4 26 6 31 8 35 11 10,000 21 4 26 6 31 8 35 11

TABLE 2—QASP FOR Berlin Lake Cleaning

REQUIRED SERVICE STANDARD METHOD OF

SURVEILLANCE

Cleaning Timeliness (20% of unit price)

Within completion time stated in Contractor’s approved work schedule

Random Sample

Cleaning (60% of unit price)

In accordance with Section 3.3 Random Sample

Minor Maintenance (20% of unit price)

In accordance with Section 3.3.2.9. Random Sample

Solid Waste Removal Timeliness (15% of unit price)

Within completion time stated in Contractor’s approved work schedule

Random Sample

Dumpster Pickup (85% of unit price)

In accordance with Section 4.4.5 Random Sample

Mowing Timeliness (30% of unit price)

Within completion time stated in Contractor’s approved work schedule

Random Sample

Grass Height (45% of unit price)

In accordance with Section 1.3.1 Random Sample

Mowing Operations (10% of unit price)

In accordance with Section 1.3.2 Random Sample

Trimming (15% of unit price)

In accordance with Section 1.3.3 Random Sample

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

Net 30 Days

964145

(No Collect Calls)

30.0 mil

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

CODE

SEE ITEM 9

X

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 4/2002)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

31-Jan-2008

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2116

PITTSBURGH PA 15222-4186

B. R. MOWING INC

WILLIAM R. RANSOM

7400 STATE HWY 198

CONNEAUTVILLE PA 16406

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX:

X

NAICS:TEL:

CODE 18a. PAYMENT WILL BE MADE BYOFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

1SD46

TEL. 814-587-2186

W911WN

412-644-5109 SIZE STANDARD:

9. ISSUED BY

FACILITY

CODE

17a.CONTRACTOR/

US ARMY CORPS OF ENGRS FINANCE CENTER

5720 INTEGRITY DRIVE

MILLINGTON TN 38054-5005

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE H4R04C0 16. ADMINISTERED BY

BERLIN LAKE

RENE BERBERICH

US ARMY CORPS OF ENGINEER 7400 BEDELL ROA

BERLIN CENTER OH 44401-9714

W911WN-06-D-0003 31-Jan-2008 0017

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

561210

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

X SMALL BUSINESS

HUBZONE SMALL BUSINESS

8(A)

SET ASIDE: 100 % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81ET480040083

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

PAMELA D BROGLIO / CONTRACTING OFFICER

TEL: 412-395-7464 EMAIL: pamela.broglio@usace.army.mil

See Schedule $706.76 EST

0 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

.OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE pamela.d.broglio Typewritten Text

ATTACHMENT 6

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 4/2002) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

W911WN-06-D-0003

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1036 4 Each $106.47 $425.88 EST

EXERCISED

OPTION

Project Office Cleanings

FFP

Administration Bldg.

FOB: Destination

MILSTRIP: W81ET480040083

PURCHASE REQUEST NUMBER: W81ET480040083

NET AMT $425.88 (EST.)

ACRN AA

CIN: W81ET4800400830001

$425.88

1037 4 Each $50.72 $202.88 EST

EXERCISED

OPTION

Project Office Cleanings

FFP

Maintenance Office FOB: Destination

NET AMT $202.88 (EST.)

CIN: W81ET4800400830002

$202.88

W911WN-06-D-0003

1058 12 Each $6.50 $78.00 EST

EXERCISED

OPTION

Solid Waste Removal - Site 4

FFP

Winter Pickup FOB: Destination

NET AMT $78.00 (EST.)

CIN: W81ET4800400830003

$78.00

ACCOUNTING AND APPROPRIATION DATA

AA: 96X31230000 082439 2520C83KF6001400 NA 96364

AMOUNT: $706.76

CIN W81ET4800400830001: $425.88

CIN W81ET4800400830002: $202.88

CIN W81ET4800400830003: $78.00

ADDENDUM

PERIOD OF PERFORMANCE

1 February 2008 to 29 February 2008; services to be performed in accordance with the Work Orders.

INVOICING

I.A.W. the Contract.

ATTACHMENT 7

SAMPLE OF CONTRACTOR'S WORK SCHEDULE

Start Finish Area/Service(s) Provided

6:00 a.m. 6:30 a.m. Junction Area. All services requested in [identify document]

6:30 a.m. 6:45 a.m. Junction Area, Inspection

6:45 a.m. 6:55 a.m. Travel to Dam and Spillway

6:55 a.m. 7:40 a.m. Below Dam and Spillway. All services requested in [identify document].

7:40 a.m. 7:55 a.m. Below Dam and Spillway, Inspection.

CONTRACT DISCREPANCY REPORT

1. CONTRACT NUMBER 2. REPORT NUMBER FOR THIS DISCREPANCY

3. TO (Contractor and Manager's Name) 4. FROM (Name of QAE)

5. DATES (YYYYMMDD)

a. PREPARED b. RETURNED BY CONTRACTOR c. ACTION COMPLETE

6. DISCREPANCY OR PROBLEM (Describe in detail. Include reference to PWS Directive; attach continuation sheet if necessary.)

7. SIGNATURE OF CONTRACTING OFFICER

8a. TO (Contracting Officer) b. FROM (Contractor)

9. CONTRACTOR RESPONSE AS TO CAUSE, CORRECTIVE ACTION AND ACTIONS TO PREVENT RECURRENCE. (Cite applicable Q.C.

program procedures or new Q.C. procedures. Attach continuation sheet(s) if necessary.)

10. SIGNATURE OF CONTRACTOR REPRESENTATIVE b. DATE (YYYYMMDD)

11. GOVERNMENT EVALUATION (Acceptance, partial acceptance, reflection. Attach continuation sheet(s) if necessary)

12. GOVERNMENT ACTIONS (Reduced payment, cure notice, show cause, other)

13. CLOSE OUT

NAME

(1)

TITLE

(2)

SIGNATURE

(3)

DATE (YYYYMMDD)

(4)

a. CONTRACTOR

NOTIFIED

b. QAE

c. ACO

DD FORM 2772, SEP 1998 (EG) REPLACES MT FORM 352-R, WHICH IS OBSOLETE. Designed using Perform Pro, WHS/DIOR, Sep 98

ATTACHMENT 8

pamela.d.broglio Typewritten Text

ATTACHMENT 9

file:///C|/Documents%20and%20Settings/pamela.d.broglio/My%20Documents/Active/Berlin/New%20Contract/Attachment%209_WD.txt premium of 25% of your basic rate for each hour of Sunday work which is not overtime (i.e. occasional work on Sunday outside the normal tour of duty is considered overtime work).

HAZARDOUS PAY DIFFERENTIAL: An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordinance, explosives, and incendiary materials. This includes work such as screening, blending, dying, mixing, and pressing of sensitive ordance, explosives, and pyrotechnic compositions such as lead azide, black powder and photoflash powder. All dry-house activities involving propellants or explosives. Demilitarization, modification, renovation, demolition, and maintenance operations on sensitive ordnance, explosives and incendiary materials. All operations involving regrading and cleaning of artillery ranges.

A 4 percent differential is applicable to employees employed in a position that represents a low degree of hazard when working with, or in close proximity to ordance, (or employees possibly adjacent to) explosives and incendiary materials which involves potential injury such as laceration of hands, face, or arms of the employee engaged in the operation, irritation of the skin, minor burns and the like; minimal damage to immediate or adjacent work area or equipment being used.

All operations involving, unloading, storage, and hauling of ordance, explosive, and incendiary ordnance material other than small arms ammunition. These differentials are only applicable to work that has been specifically designated by the agency for ordance, explosives, and incendiary material differential pay.

** UNIFORM ALLOWANCE **

If employees are required to wear uniforms in the performance of this contract (either by the terms of the Government contract, by the employer, by the state or local law, etc.), the cost of furnishing such uniforms and maintaining (by laundering or dry cleaning) such uniforms is an expense that may not be borne by an employee where such cost reduces the hourly rate below that required by the wage determination. The Department of Labor will accept payment in accordance with the following standards as compliance:

The contractor or subcontractor is required to furnish all employees with an adequate number of uniforms without cost or to reimburse employees for the actual cost of the uniforms. In addition, where uniform cleaning and maintenance is made the responsibility of the employee, all contractors and subcontractors subject to this wage determination shall (in the absence of a bona fide collective bargaining agreement providing for a different amount, or the furnishing of contrary affirmative proof as to the actual cost), reimburse all employees for such cleaning and maintenance at a rate of $3.35 per week (or $.67 cents per day). However, in those instances where the uniforms furnished are made of "wash and wear" materials, may be routinely washed and dried with other personal garments, and do not require any special treatment such as dry cleaning, daily washing, or commercial laundering in order to meet the cleanliness or appearance standards set by the terms of the Government contract, by the contractor, by law, or by the nature of the work, there is no requirement that employees be reimbursed for uniform maintenance costs.

file:///C|/Documents%20and%20Settings/pamela.d.brogl...s/Active/Berlin/New%20Contract/Attachment%209_WD.txt (10 of 12) [9/17/2008 3:53:14 PM] file:///C|/Documents%20and%20Settings/pamela.d.broglio/My%20Documents/Active/Berlin/New%20Contract/Attachment%209_WD.txt

REQUEST FOR AUTHORIZATION OF ADDITIONAL CLASSIFICATION AND WAGE RATE {Standard Form

1444 (SF 1444)}

Conformance Process:

The contracting officer shall require that any class of service employee which is not listed herein and which is to be employed under the contract (i.e., the work to be performed is not performed by any classification listed in the wage determination), be classified by the contractor so as to provide a reasonable relationship (i.e., appropriate level of skill comparison) between such unlisted classifications and the classifications listed in the wage determination. Such conformed classes of employees shall be paid the monetary wages and furnished the fringe benefits as are determined. Such conforming process shall be initiated by the contractor prior to the performance of contract work by such unlisted class(es) of employees. The conformed classification, wage rate, and/or fringe benefits shall be retroactive to the commencement date of the contract. {See Section 4.6 (C)(vi)} When multiple wage determinations are included in a contract, a separate SF 1444 should be prepared for each wage determination to which a class(es) is to be conformed.

The process for preparing a conformance request is as follows:

1) When preparing the bid, the contractor identifies the need for a conformed occupation) and computes a proposed rate).

2) After contract award, the contractor prepares a written report listing in order proposed classification title), a Federal grade equivalency (FGE) for each proposed classification), job description), and rationale for proposed wage rate), including information regarding the agreement or disagreement of the authorized representative of the employees involved, or where there is no authorized representative, the employees themselves. This report should be submitted to the contracting officer no later than 30 days after such unlisted class(es) of employees performs any contract work.

3) The contracting officer reviews the proposed action and promptly submits a report of the action, together with the agency's recommendations and pertinent information including the position of the contractor and the employees, to the Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, for review. (See section 4.6(b)(2) of Regulations 29 CFR Part 4).

4) Within 30 days of receipt, the Wage and Hour Division approves, modifies, or disapproves the action via transmittal to the agency contracting officer, or notifies the contracting officer that additional time will be required to process the request.

5) The contracting officer transmits the Wage and Hour decision to the contractor.

6) The contractor informs the affected employees.

file:///C|/Documents%20and%20Settings/pamela.d.brogl...s/Active/Berlin/New%20Contract/Attachment%209_WD.txt (11 of 12) [9/17/2008 3:53:14 PM] file:///C|/Documents%20and%20Settings/pamela.d.broglio/My%20Documents/Active/Berlin/New%20Contract/Attachment%209_WD.txt

Information required by the Regulations must be submitted on SF 1444 or bond paper.

When preparing a conformance request, the "Service Contract Act Directory of Occupations" (the Directory) should be used to compare job definitions to insure that duties requested are not performed by a classification already listed in the wage determination. Remember, it is not the job title, but the required tasks that determine whether a class is included in an established wage determination.

Conformances may not be used to artificially split, combine, or subdivide classifications listed in the wage determination.

The duties of employees under job titles listed are those described in the "Service Contract Act Directory of Occupations", Fifth Edition, April 2006, unless otherwise indicated. Copies of the Directory are available on the Internet. A links to the Directory may be found on the WHD home page at http://www.dol.gov/esa/whd/ or through the Wage Determinations On-Line (WDOL) Web site at http://wdol.gov/.

file:///C|/Documents%20and%20Settings/pamela.d.brogl...s/Active/Berlin/New%20Contract/Attachment%209_WD.txt (12 of 12) [9/17/2008 3:53:14 PM]

Attachment 3_Postaward Conf
Attachment 5 QASP
Attachment 6 Task Order
Attachment 7_Sample Schedule
Attachment 8 DD2772
Attachment 9_WD
Local Disk
file:///C|/Documents%20and%20Settings/pamela.d.broglio/My%20Documents/Active/Berlin/New%20Contract/Attachment%209_WD.txt
1_CONTRACT_NUMBER:
2_REPORT_NUMBER_FOR_THIS:
3_TO_Contractor_and_Manag:
4_FROM_Name_of_QAE:
a_PREPARED:
b_RETURNED_BY_CONTRACTOR:
c_ACTION_COMPLETE:
6_DISCREPANCY_OR_PROBLEM:
7_SIGNATURE_OF_CONTRACTIN:
8a_TO_Contracting_Officer:
b_FROM_Contractor:
9_CONTRACTOR_RESPONSE_AS:
10_SIGNATURE_OF_CONTRACTO:
b_DATE_YYYYMMDD:
11_GOVERNMENT_EVALUATION:
12_GOVERNMENT_ACTIONS_Red:
NAME_1:
TITLE_2:
SIGNATURE_3:
DATE_YYYYMMDD_4:
NAME_2:
TITLE_1:
SIGNATURE_1:
DATE_YYYYMMDD_1:
NAME_3:
TITLE_3:
SIGNATURE_2:
DATE_YYYYMMDD_2:
Reset:

File details come from the government source that posted it. Updated .