A07_Attachment_4_TM_Content_Selection_Matrix.pdf

PDF 234 KB Posted

Attached to
Screening Obscuration Module (SOM) RFP Federal contract opportunity
Solicitation number
W911SR-16-R-0002
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

Attachment 4 - TM Content Selection Matrix

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A4 - 1

ATTACHMENT 4: TECHNICAL MANUAL CONTENT SELECTION MATRIX

TABLE A-II. TM Requirements Matrix for SOM TM 3-1040-297-13&P (Combined Operator/ Maintenance Requirements and RPSTL)

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

FRONT MATTER R 5.2.1 <paper.frnt>

Front cover R 5.2.1.1 <frntcover>

(MC) Promulgation letter TBD pending

LPD

5.2.1.3 <promulgation>

Warning summary TBD pending

LPD

5.2.1.4 <warnsum>

Change transmittal page TBD pending

LPD

5.2.1.5 <chgsheet>

List of effective pages/work packages R 5.2.1.6 <loepwp>

Title page R 5.2.1.7 <titleblk>

Table of contents R 5.2.1.9 <contents>

How to use this manual R 5.2.1.10 <howtouse>

CHAPTER 1. R APPENDIX B <gim>

CHAPTER 1. GENERAL INFORMATION,

Equipment DESCRIPTION, AND

THEORY OF OPERATION

GENERAL INFORMATION WORK

PACKAGE

R B.5.2 <ginfowp>

Scope R B.5.2.3 <scope>

Maintenance forms, records, and reports R B.5.2.4 <mfrr>

Reporting Equipment Improvement Recommendations (EIR)

R B.5.2.5 <eir>

Hand Receipt (HR) manuals TBD pending

LPD

B.5.2.6 <handreceipt>

Corrosion Prevention and Control (CPC) R B.5.2.7 <cpcdata>

Ozone Depleting Substances (ODS) TBD pending

LPD

B.5.2.8 <odsdata>

Destruction of Army materiel to prevent enemy use

R B.5.2.9 <destructmat>

Preparation for storage or shipment R B.5.2.10 <pssref>

Warranty information TBD pending

LPD

B.5.2.11 <wrntyref>

Nomenclature cross-reference list R B.5.2.12 <nomenreflist>

ATTACHMENT 4: TM CONTENT SELECTION MATRIX

A4 - 2

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

List of abbreviations/acronyms R B.5.2.13 <loa>

Quality of material R B.5.2.15 <qual.mat.info>

Safety, care, and handling TBD pending

LPD

B.5.2.16 <sftyinfo>

Nuclear hardness TBD pending

LPD

B.5.2.17 <hcp>

Calibration TBD pending

LPD

B.5.2.18 <calref>

Item unique identification (IUID) TBD pending

LPD

B.5.2.19 <iuid>

Supporting information for repair parts, special tools, TMDE, and support equipment

TBD

pending

LPD

B.5.2.26 <supdata>

Copyright credit line TBD pending

LPD

B.5.2.27 <copyrt>

EQUIPMENT DESCRIPTION AND DATA

WORK PACKAGE

R B.5.3 <descwp>

Equipment characteristics, capabilities, and features

R B.5.3.3 <eqpinfo>

Location and description of major components

R B.5.3.4 <locdesc>

Differences between models TBD pending

LPD

B.5.3.5 <eqpdiff>

Equipment data R B.5.3.6 <eqpdata>

THEORY OF OPERATION WORK

PACKAGE

R B.5.4 <thrywp>

CHAPTER X. R APPENDIX C <opim>

OPERATOR INSTRUCTIONS

DESCRIPTION AND USE OF OPERATOR

CONTROLS AND INDICATORS WORK

PACKAGE

R C.5.2.2.1 <ctrlindwp>

OPERATION UNDER USUAL

CONDITIONS WORK PACKAGE (one or more WP as directed by LPD)

R C.5.2.2.2 <opusualwp>

Operation under usual conditions task R C.5.2.2.2.3 <opertsk>

Security measures for electronic data TBD pending

LPD

C.5.2.2.2.4 <secref>

A4 - 3

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

Siting requirements TBD pending

LPD

C.5.2.2.2.5 <site>

Shelter requirements TBD pending

LPD

C.5.2.2.2.6 <shelter>

Assembly and preparation for use TBD pending

LPD

C.5.2.2.2.7 <prepforuse>

Initial adjustments, before use and self-test TBD pending

LPD

C.5.2.2.2.8 <initial>

Operating procedures R C.5.2.2.2.9 <oper>

Operating auxiliary equipment TBD pending

LPD

C.5.2.2.2.11 <operaux>

Preparation for movement TBD pending

LPD

C.5.2.2.2.12 <prepmove>

Decals and instruction plates TBD pending

LPD

C.5.2.2.2.13 <instructplt>

OPERATION UNDER UNUSUAL

CONDITIONS WORK PACKAGE

R C.5.2.2.3 <opunuwp>

Security measures for electronic data TBD pending

LPD

C.5.2.2.3.4 <secref>

Unusual environment/weather R C.5.2.2.3.5 <unusualenv>

Fording and swimming TBD pending

LPD

C.5.2.2.3.6 <fording>

Interim Chemical, Biological, Radiological, and Nuclear (CBRN) decontamination procedures

TBD

pending

LPD

C.5.2.2.3.7 <decon>

Jamming and Electronic Countermeasures (ECM) procedures

TBD

pending

LPD

C.5.2.2.3.8 <ecm>

Degraded operation procedures TBD pending

LPD

C.5.2.2.3.9 <degraded>

Decals and instruction plates TBD pending

LPD

C.5.2.2.3.10 <instructplt>

Emergency WORK PACKAGE TBD pending

C.5.2.2.4 <emergencywp>

A4 - 4

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

STOWAGE AND DECAL/DATA PLATE

GUIDE WORK PACKAGE

TBD

pending

LPD

C.5.2.2.5 <stowagewp>

ON-VEHICLE EQUIPMENT LOADING

PLAN WORK PACKAGE

TBD

pending

LPD

C.5.2.2.6 <eqploadwp>

CHAPTER X. TROUBLESHOOTING APPENDIX D <tim>

TROUBLESHOOTING TBD

pending

LPD

D.5.4.4 <masterindexcategory>

MASTER INDEX

TROUBLESHOOTING INDEX WORK

PACKAGE

TBD

pending

LPD

D.5.5.5 <tsindxwp>

CHAPTER X. R APPENDIX D <tim>

TROUBLESHOOTING PROCEDURES D.5.4.2 <troublecategory>

NOTE

The notation (*) indicates that at least one of these content items shall be included

INTRODUCTION WORK PACKAGE TBD

pending

LPD

D.5.5.3 <tsintrowp>

TROUBLESHOOTING INDEX WORK

PACKAGE

TBD

pending

LPD

D.5.5.5 <tsindxwp>

*OPERATIONAL CHECKOUT WORK

PACKAGES

TBD

pending

LPD

D.5.5.8.3 <opcheckwp>

*TROUBLESHOOTING WORK

PACKAGES

TBD

pending

LPD

D.5.5.8.4 <tswp>

*COMBINED OPERATIONAL CHECKOUT

AND TROUBLESHOOTING WORK

PACKAGES

TBD

pending

LPD

D.5.5.8.5 <opcheck-tswp>

CHAPTER X. PMCS TBD

pending

LPD

APPENDIX E <mim>

PMCS TBD

pending

LPD

E.5.2.1 <pmcscategory>

MAINTENANCE INSTRUCTIONS

NOTE

A4 - 5

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

PMCS may be in its own chapter or may be combined with other maintenance work packages in a maintenance chapter but not both places.

PMCS INTRODUCTION WORK PACKAGE R E.5.3.4.1 <pmcsintrowp>

PMCS, INCLUDING LUBRICATION R E.5.3.4.2 <pmcswp>

INSTRUCTIONS, WORK PACKAGE

CHAPTER X. R APPENDIX E <mim>

MAINTENANCE INSTRUCTIONS E.5.2.2 <maintenancepmcscategory>

NOTE E.5.2.3 <maintenancecategory>

PMCS is required as a minimum in one maintenance chapter. PMCS may be in its own chapter or may be combined with other maintenance work packages in a maintenance chapter but not both places.

SERVICE UPON RECEIPT WORK

PACKAGE (maintainer level only)

R E.5.3.2 <surwp>

Service upon receipt tasks R E.5.3.2.3 <surtsk>

Siting TBD pending

LPD

E.5.3.2.3.1 <siting>

Shelter requirements TBD pending

LPD

E.5.3.2.3.2 <shltr>

Service upon receipt of materiel R E.5.3.2.3.3 <surmat>

Installation instructions R E.5.3.2.3.4 <install>

Preliminary servicing of equipment TBD pending

LPD

E.5.3.2.3.5 <preserv>

Preliminary checks and adjustment of equipment

TBD

pending

LPD

E.5.3.2.3.6 <prechkadj>

Preliminary calibration of equipment TBD pending

LPD

E.5.3.2.3.7 <precal>

Circuit alignment TBD pending

LPD

E.5.3.2.3.8 <calign>

Ammunition markings TBD pending

E.5.3.2.3.9.1 <mark>

A4 - 6

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

Classification of defects TBD pending

LPD

E.5.3.2.3.9.2 <ammo.defect>

Ammunition handling TBD pending

LPD

E.5.3.2.3.9.3 <ammo.handling>

Procedures to activate ammunition TBD pending

LPD

E.5.3.2.3.9.4 <arm>

Additional maintenance task TBD pending

LPD

E.5.3.2.3.10 <other.surtsk>

Follow-on maintenance TBD pending

LPD

E.5.3.2.3.11 <followon.maintsk>

EQUIPMENT/USER FITTING

INSTRUCTIONS WORK PACKAGE

TBD

pending

LPD

E.5.3.3 <perseqpwp>

PMCS INTRODUCTION WORK PACKAGE TBD

pending

LPD

E.5.3.4.1 <pmcsintrowp>

PMCS WORK PACKAGE TBD

pending

LPD

E.5.3.4.2 <pmcswp>

MAINTENANCE WORK PACKAGES R E.5.3.5 <maintwp>

Maintenance tasks R E.5.3.5.3 <maintsk>

Inspect TBD pending

LPD

E.5.3.5.3.2 <inspect>

Test TBD pending

LPD

E.5.3.5.3.3 <test>

Service TBD pending

LPD

E.5.3.5.3.4 <service>

Adjust TBD pending

LPD

E.5.3.5.3.5 <adjust>

Align TBD pending

LPD

E.5.3.5.3.6 <align>

Calibrate TBD pending

LPD

E.5.3.5.3.7 <calibration>

Remove TBD pending

E.5.3.5.3.8 <remove>

A4 - 7

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

Install TBD pending

LPD

E.5.3.5.3.9 <install>

Replace TBD pending

LPD

E.5.3.5.3.10 <replace>

Repair TBD pending

LPD

E.5.3.5.3.11 <repair>

Paint TBD pending

LPD

E.5.3.5.3.12 <paint>

Overhaul TBD pending

LPD

E.5.3.5.3.13 <overhaul>

Rebuild TBD pending

LPD

E.5.3.5.3.14 <rebuild>

Lubricate TBD pending

LPD

E.5.3.5.3.15 <lube>

Mark TBD pending

LPD

E.5.3.5.3.16 <mark>

Pack TBD pending

LPD

E.5.3.5.3.17 <pack>

Unpack TBD pending

LPD

E.5.3.5.3.18 <unpack>

Preserve TBD pending

LPD

E.5.3.5.3.19 <preserv>

Prepare for use TBD pending

LPD

E.5.3.5.3.20 <prepforuse>

Assemble TBD pending

LPD

E.5.3.5.3.21 <assem>

Disassemble TBD pending

LPD

E.5.3.5.3.22 <disassem>

Clean TBD pending

LPD

E.5.3.5.3.23 <clean>

Nondestructive inspection TBD pending

E.5.3.5.3.24 <ndi>

A4 - 8

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

Radio interference suppression TBD pending

LPD

E.5.3.5.3.25 <ris>

Place in service TBD pending

LPD

E.5.3.5.3.26 <pis>

Towing TBD pending

LPD

E.5.3.5.3.27 <tow>

Jacking TBD pending

LPD

E.5.3.5.3.28 <jack>

Parking TBD pending

LPD

E.5.3.5.3.29 <park>

Mooring TBD pending

LPD

E.5.3.5.3.30 <moor>

Covering TBD pending

LPD

E.5.3.5.3.31 <cover>

Hoisting TBD pending

LPD

E.5.3.5.3.32 <hoist>

Sling loading TBD pending

LPD

E.5.3.5.3.33 <sling>

External power TBD pending

LPD

E.5.3.5.3.34 <extpwr>

Preparation for shipment and storage TBD pending

LPD

E.5.3.5.3.35 <pss>

Arm TBD pending

LPD

E.5.3.5.3.36 <arm>

Load TBD pending

LPD

E.5.3.5.3.37 <load>

Unload TBD pending

LPD

E.5.3.5.3.38 <unload>

Software maintenance TBD pending

LPD

E.5.3.5.3.39 <softwaremaint>

Additional maintenance task TBD pending

E.5.3.5.3.40 <other.maintsk>

A4 - 9

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

Follow-on maintenance TBD pending

LPD

E.5.3.5.3.41 <followon.maintsk>

GENERAL MAINTENANCE WORK

PACKAGE

TBD

pending

LPD

E.5.3.7 <gen.maintwp>

LUBRICATION INSTRUCTIONS WORK

PACKAGE

TBD

pending

LPD

E.5.3.8 <lubewp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE (maintainer level and above)

E.5.3.10

TBD

pending

LPD

Illustrated list of manufactured items introduction work package

R E.5.3.10.1 <manu_items_introwp>

Manufacturing procedures work package R E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE

(MAINTAINER level and above)

TBD

pending

LPD

E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK PACKAGE

(MAINTAINER level and above)

TBD

pending

LPD

E.5.3.12 <wiringwp>

CHAPTER X. TBD

pending

LPD

APPENDIX E <mim>

AUXILIARY EQUIPMENT E.5.2.6 <auxiliarycategory>

MAINTENANCE INSTRUCTIONS

AUXILIARY EQUIPMENT MAINTENANCE

WORK PACKAGE

TBD

pending

LPD

E.5.3.14 <auxeqpwp>

ILLUSTRATED LIST OF

MANUFACTURED ITEMS WORK

PACKAGE (maintainer level and above)

TBD

pending

LPD

E.5.3.10

Illustrated list of manufactured items introduction work package

R E.5.3.10.1 <manu_items_introwp>

Manufacturing procedures work package R E.5.3.10.2 <manuwp>

TORQUE LIMITS WORK PACKAGE

(maintainer level and above)

TBD

pending

LPD

E.5.3.11 <torquewp>

WIRING DIAGRAMS WORK PACKAGE

(maintainer level and above)

TBD

pending

LPD

E.5.3.12 <wiringwp>

CHAPTER X. TBD

pending

APPENDIX E <mim>

A4 - 10

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

AMMUNITION TBD

pending

LPD

E.5.2.7 <ammunitioncategory>

MAINTENANCE INSTRUCTIONS TBD

pending

AMMUNITION MAINTENANCE WORK

PACKAGE

TBD

pending

LPD

E.5.3.15.1 <ammowp>

AMMUNITION MARKING INFORMATION

WORK PACKAGE

TBD

pending

LPD

E.5.3.15.2 <ammo.markingwp>

FOREIGN AMMUNITION (NATO) WORK

PACKAGE

TBD

pending

LPD

E.5.3.15.3 <natowp>

CHAPTER X. RPSTL APPENDIX F <pim>

PARTS information

(-13&P) R

Introduction work package R F.5.3.5 <introwp>

Repair parts list work package R F.5.3.6 <plwp>

Repair parts for special tools work package (s)

TBD

pending

LPD

F.5.3.7 <stl_partswp>

Kit parts list work package TBD pending

LPD

F.5.3.8 <kitswp> bulk Item Work Package TBD pending

LPD

F.5.3.9 <bulk_itemswp>

Special tools list work package TBD pending

LPD

F.5.3.10 <stlwp>

NSN index work package R F.5.3.11.1 <nsnindxwp>

P/N index work package R F.5.3.11.2 <pnindxwp>

Reference designator index work package TBD pending

LPD

F.5.3.11.3 <refdesindxwp>

CHAPTER X. TBD

pending

LPD

APPENDIX H <dim>

DESTRUCTION OF EQUIPMENT TO

PREVENT ENEMY USE

TBD

pending

NOTE

A4 - 11

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

If a separate destruction of material manual is not developed for this equipment, then the destruction chapter must be included.

Destruction OF EQUIPMENT TO PREVENT ENEMY USE introduction work package

R H.5.3 <destruct-introwp>

Authority to destroy R H.5.3.3 <authorize_to_destroy>

Reporting destruction R H.5.3.4 <report_destruct>

General destruction information R H.5.3.5 <general_destruct_info>

Degree of destruction R H.5.3.6

Essential components and spare parts TBD pending

LPD

H.5.3.7 <component_spares>

DESTRUCTION OF EQUIPMENT TO

PREVENT ENEMY USE PROCEDURES

WORK PACKAGE

R H.5.4 <destruct-materialwp>

Parts list TBD pending

LPD

H.5.4.3 <essential_spares>

Specific destruction procedures R H.5.4.4 <proc>

CHAPTER X. R APPENDIX G <sim>

SUPPORTING INFORMATION

NOTE

Applicable supporting information work packages shall be arranged in the order in which they are presented here and numbered accordingly.

REFERENCES WORK PACKAGE R G.5.2 <refwp>

INTRODUCTION FOR non-aviation TWO- LEVEL maintenance mac WORK

PACKAGE

R G.5.3.1 <macintrowp>

MAC WORK PACKAGE (non-aviation

TWO-LEVEL)

R G.5.3.3 <macwp>

COMPONENTS OF END ITEM (COEI)

AND BASIC ISSUE ITEMS (BII) LISTS

WORK PACKAGE

R G.5.4 <coeibiiwp>

ADDITIONAL AUTHORIZATION LIST

(AAL) WORK PACKAGE

TBD

pending

G.5.5 <aalwp>

A4 - 12

TM Content -13 MIL-STD-40051- 2B

Element Name

-13&P Reference

EXPENDABLE AND DURABLE ITEMS

LIST WORK PACKAGE

R G.5.6 <explistwp>

TOOL IDENTIFICATION LIST WORK

PACKAGE

TBD

pending

LPD

G.5.7 <toolidwp>

MANDATORY REPLACEMENT PARTS

WORK PACKAGE

TBD

pending

LPD

G.5.8 <mrplwp>

CRITICAL SAFETY ITEMS WORK

PACKAGE

TBD

pending

LPD

G.5.9 <csi.wp>

SUPPORT ITEMS WORK PACKAGE TBD

pending

LPD

G.5.10 <supitemwp>

ADDITIONAL SUPPORTING WORK

PACKAGES

TBD

pending

LPD

G.5.11 <genwp>

REAR MATTER R 5.2.3 <rear>

Glossary TBD pending

LPD

5.2.3.1 <glossary>

Alphabetical index TBD pending

LPD

5.2.3.2 <aindx>

DA Form 2028 R 5.2.3.3 <da2028>

Authentication page R 5.2.3.4 <authent>

Foldout pages TBD pending

LPD

5.2.3.5 <foldsect>

Back cover R 5.2.3.6 <back>

Legend

R - Required

P - Prohibited

Shaded - As Required

File details come from the government source that posted it. Updated .