PWS Fort Bliss NEC B30430 Endeavor Battery Replacement V.2.docx
DOCX document 71 KB Posted
- Attached to
- DC Battery Replacement/Disposal
- Solicitation number
- W911SG26QA068
About this file
This is a Performance Work Statement (PWS) for the replacement and disposal of a DC battery system at Fort Bliss Network Enterprise Center Building 30430, a remote Land Mobile Radio (LMR) facility located at grid coordinates 32.493132, -105.570030 in Otero County, New Mexico, approximately 1.5 hours from Fort Bliss proper. The existing system comprises six battery banks containing 144 Deka Unigy II batteries (4V 2000 AH each) installed in 2012 with a 10-year life expectancy and currently non-operational. The facility supports critical network communications and range operations for Fort Bliss and Special Operations, with power provided by two inverters (one 18.4 amp critical load, one 44 amp non-critical load) and a solar power array. The contractor must provide all labor, materials, equipment, supplies, transportation, supervision, and support necessary to remove and dispose of existing batteries as hazardous waste, install a replacement DC battery plant sized to connected loads and future projections, integrate remote monitoring and alarm systems with the Network Enterprise Center, and conduct comprehensive system testing and commissioning in compliance with IEEE Std 1188, NFPA 70 Article 480, UFC 3-520-01, and MIL-HDBK-419A.
The contract is anticipated to be firm-fixed-price with a 72-hour phase-in period commencing upon award. Remote site access requires All-Terrain Vehicles (ATVs) and a government escort familiar with the unmarked cross-country route through difficult desert terrain; contractors must arrive fully equipped with specialized electrical, mechanical, safety tools, and hazardous material handling equipment, as the Government provides no individual tools or specialty equipment. Key deliverables include a Quality Control Plan (within 30 days of award), hazardous waste disposal manifests (within 5 business days), battery plant design package (prior to installation), remote monitoring integration report (within 10 business days of installation), commissioning and testing report (within 10 business days of completion), and annual Service Contract Reporting via SAM.gov by October 30. The contractor must designate a Project Manager with five years' experience in a similar scope within five calendar days of contract start, designate Quality Control Inspectors with two years' documented experience, comply with background checks and security requirements including OPSEC protocols, maintain proper personnel identification and uniforms, and ensure all work meets 100% compliance standards with performance thresholds documented in the technical exhibits.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20121127_104752 1.jpg | JPG image | |
| 20121127_105206 1.jpg | JPG image | |
| 20121127_103933 1.jpg | JPG image | |
| 20121127_103849 1.jpg | JPG image | |
| Endeavor1.JPG | JPG image | |
| 2013-06-06_12-57-33_623 1.jpg | JPG image | |
| 20121127_103909 1.jpg | JPG image | |
| 20121127_105139 1.jpg | JPG image | |
| 20121127_104425 1.jpg | JPG image | |
| 20121127_105116 1.jpg | JPG image | |
| 20121127_105426 1.jpg | JPG image | |
| Endeavor tank specs.JPG | JPG image | |
| 20121127_104448 1.jpg | JPG image | |
| W911SG-26-Q-A068 Questions and Answers (DC Battery).pdf | ||
| 20121127_105447 1.jpg | JPG image | |
| 20121127_105156 2.jpg | JPG image | |
| 20121127_103257 1.jpg | JPG image | |
| PWS Fort Bliss NEC B30430 Endeavor Battery Replacement V.2.pdf | ||
| Solicitation - W911SG26QA068.pdf | ||
| Wage Determination - 15-5455.pdf | ||
| PWS Fort Bliss NEC B30430 Endeavor Battery Replacement V.2.pdf | ||
| Combined Synopsis-Solicitation_Battery Replacement.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Bliss Network Enterprise Center (NEC)
Replacement of the DC battery system in Building 30430 11 September 2026
PART 1
GENERAL INFORMATION
1. GENERAL: This is a non-personal service contract under which the personnel rendering the services are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. The United States (U.S.) Government shall not exercise supervision or control over the Contractor’s employees performing the tasks herein. Such contract employees shall be accountable solely to the Contractor who, in turn shall be responsible to the U.S. Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform replacement and disposal of existing DC battery system in Buildings 30430 as defined in this PWS except for those items specified as government furnished property (GFP) and government furnished services (GFS). The contractor shall perform to the standards in this contract. The main DC battery system is comprised of six (6) battery banks for a total of 144 Deka Unigy II batteries, each 4V 2000 AH. This system is due for life cycle replacement as the batteries were installed in 2012 with a 10-year life expectancy and are currently not operational. AC power is provided by two inverters; one is critical with an 18.4 amp load and the other in non-critical with a 44-amp load.
1.2 Background: The facility is essential/critical link of network communication services for Fort Bliss ranges, and Fort Bliss Special Operations. The batteries are supported and energized by a solar power array and a loss of power to the building will result in a major communication failure that will impact mission support for several hours/days. This Land Mobile Radio (LMR) facility, of which is a wireless communications system that allows for secure and immediate communication that effects life and safety.
1.3 Objectives: The objective of this project is to replace/restore/repair the existing electrical infrastructure in Building 30430 to include replacement and disposal of existing unserviceable batteries. The batteries are structured into Banks and once the banks have been serviced, each Bank needs to be inspected and tested prior to turnkey for operation.
1.4 Scope: Contractor shall provide non-personal services to replace/restore/repair and dispose of existing DC battery system in Buildings 30430. The contractor shall accomplish replacement and testing to ensure the system is restored and fully operational.
1.5 Period of Performance: Please refer to the contract schedule for the contract’s period of performance.
1.6 General Information: Building 30430 – Site Description
Building 30430 is a remote facility located at grid coordinates 32.493132, -105.570030 also known as LMR Site Endeavor. The site lies in a remote area of the state of New Mexico, approximately 1.5 hours driving time from Fort Bliss proper.
Due to the rugged and undeveloped terrain surrounding the facility, access is extremely limited. All-Terrain Vehicles (ATVs) are critical for reaching the site. Standard vehicles are not recommended and will likely be unable to complete the final portions of the route.
A government escort familiar with the area is required to successfully navigate to the location, as the route is not marked and involves cross-country travel through difficult desert terrain.
Key Points:
· Coordinates: 32.493132, -105.570030
· Distance from Fort Bliss: ~1.5 hours
· Vehicle Requirement: All-Terrain Vehicles (ATVs) mandatory
· Navigation: Local guide/person familiar with the route required
Assessment Recommendation: Two independent condition assessments of the Deka Unigy II battery banks were conducted by U.S. Army Tobyhanna Army Depot and EPS Engineering & Design Service on different dates and in different years. Both assessments reached the same conclusion: a like-for-like replacement of the existing battery banks and inverters is required. This recommendation is driven by unspecified present connected electrical loads, which prevent evaluation of alternative system configurations. The AC power inverters are identified as an Eagle-Eye MIS-500 Modular Inverter System. It is recommended to replace these as well with identical (or higher) nameplate ratings than existing.
1.6.1 Quality Control Plan (QCP): The Contractor shall develop, implement, and maintain a QCP and program to ensure all work described in this contract is performed at or above the standard defined in the Performance Requirements Summary (PRS). The QCP is developed by the contractor for its internal use to ensure that it performs and delivers high-quality service. The contractor’s QCP is the means by which the contractor ensures all work complies with the requirements of the contract. The QCP identifies and corrects potential and actual problem areas throughout the entire scope of the contract.
1.6.1.1 The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The QCP shall be submitted within thirty (30) days of contract award. After acceptance of the QCP, the contractor shall receive the contracting officer’s (KO) acceptance in writing of proposed changes to the QC procedures. The contractor shall submit QCP changes within five (5) days to the KO and Contracting Officer’s Representative (COR) for review and approval prior to implementation.
1.6.1.2 The Quality Control Plan shall address as a minimum:
1.6.1.2.1 Inspection Program. Included shall be a quality control inspection program covering all general and specific tasks included in the contract scope of work. It shall specify tasks or areas to be inspected on a scheduled or unscheduled basis, the manner in which inspections are to be conducted, the titles of the individuals who will perform the inspections, and the percentage of the work that will be inspected on a recurring basis. In developing this inspection program, the Contractor shall identify the key activities and associated characteristics in each process that have a significant influence on specific services and provide for methods for evaluation of the selected characteristics.
1.6.1.2.2 Deficiency Identification. The QCP shall include a method of identifying deficiencies in the quality of services performed before the level of performance becomes unacceptable as defined in the PRS. This shall contain processes for corrective action without dependence upon Government direction.
1.6.1.2.3 Deficiency Correction. The program shall contain process control and process performance measurement procedures that shall include how the Contractor shall implement preventive corrective actions. The Contractor shall demonstrate that it has designed quality into the delivery of services thereby mitigating the risk(s) associated with delivery of deficient or nonconforming services.
1.6.1.2.4 Documentation and Enforcement. The QCP shall include a method of documenting and enforcing quality control operations of both prime contractor and subcontractor work; including inspection and testing.
1.6.1.2.5 Trend Analysis. The QCP shall include a method of performing trend analysis and assessments through the use of metrics.
1.6.1.2.6 Surveillance Methods. The QCP shall contain specific surveillance techniques for all contract services. The surveillance methods shall be comprehensive and adaptable to the reporting system of the plan.
1.6.2 Operations Security (OPSEC) SOP/Plan Requirements The Contractor shall implement and maintain an OPSEC program for preventing the disclosure of critical information or sensitive information which could jeopardize the Government’s ability to execute its mission or to adequately protect its personnel and/or equipment. The Contractor shall develop an OPSEC Standing Operating Procedure (SOP)/plan within 90 calendar days of contract award to the Contracting Officer Representative (COR) or Contracting Officer (KO) to be reviewed and approved by the Government OPSEC Officer on the supporting installation. The SOP must contain a training plan that includes an initial OPSEC brief, continuous awareness, and annual OPSEC training. Awareness/training includes, but not limited to information disclosure via letters, conversations, photographs, resumes, electronic mail (e-mail), Social media/networking sites, dissemination of information and documents disposal. OPSEC Program shall fully comply with the provisions of AR 530-1, Operations Security.
1.6.2 Quality Assurance (QA): The government shall evaluate the contractor’s performance under this contract in accordance with (IAW) the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed IAW the performance standards and contract quality requirements are met. Contract quality requirements” means the technical requirements in the contract relating to the quality of the product or service and those contract clauses prescribing inspection, and other quality controls incumbent on the contractor, to ensure the product or service conforms to the contractual requirements. It defines how the performance standards will be applied, the frequency of surveillance, the performance threshold, and deductions, if applicable.
1.6.3 Recognized Holidays: The contractor is not required to perform services on the holidays listed below:
| New Year’s Day | Labor Day | ||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||
| President’s Day | Veteran’s Day | ||
| Memorial Day | Thanksgiving Day | ||
| Independence Day | Christmas Day |
Juneteenth
1.6.4 Hours of Operation: The contractor is responsible for conducting business between the hours of Monday through Friday, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Endeavor site Bldg 30430, in Otero County New Mexico coordinates 32.493132, -105.570030. The closest town/city is Pinon, New Mexico.
1.6.6 Type of Contract: The Government anticipates the award of a Firm-Fixed Price type contract.
1.6.7 Security Requirements:
1.6.7.1 Access and general protection/security policy and procedures: Contractor and all associated subcontractor employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
1.6.7.2 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured IAW Army Regulation (AR) 190-13, “The Army Physical Security Program.
1.6.7.3 Escort: The Contractor and all associated sub-contractor employees performing services under this contract shall be escorted at all times by host nation security personnel or by an individual designated by the Contracting Officer Representative (COR) while accessing U.S. facilities or activities.
1.6.7.4 Personnel Security Clearance Requirements: There are no Operational Security Requirement levels for this contract.
1.6.7.4.1 The contractor shall follow DOD Federal Acquisition Regulation Supplement (DFARS) clause 252.223-7004, Drug-free Work Force. The contractor shall conduct drug tests, ensuring all top secret cleared contractor employees are tested at least once per year, each year of the contract, as well as when there is a reasonable suspicion that an employee uses illegal drugs. The drug testing shall be at the contractor’s expense. Positive drug test results shall be made available to both the KO and COR within 24 hours of known test results. Records of drug testing shall be made available to the COR.
1.6.7.5 Background Checks : The Contractor shall ensure contractor employees and subcontractor employees performing services under this contract have passed a security check conducted by the State Police Department of their U.S. residence. Security checks that have been completed as part of a personnel security clearance background investigation, or a previous background check that was a condition of employment, meet this requirement. Documentation of these checks will be made available to the KO or COR upon request. The Government retains the right to exclude any employee from performance of duties under this contract if a background security check reveals an employee is a security risk. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. If the Government determines additional background checks are required, at a minimum, and upon request from the Government, the Contractor shall provide to the KO or COR, the following information on any contractor or subcontractor employee performing services under this contract:
· Full birth name
· Married name (if applicable)
· SSN or local equivalent (ID card number)
· Date of birth
· Place of birth (city, country)
1.6.7.5.1 Background Check Notification Requirements: If a background check on any employee or subcontractor employee performing services under this contract, whether the check was conducted as a condition of employment or as part of the contract with the Government, reveals any information from any source (including host country law enforcement) of criminal activity by Contractor employees, subcontractors, or subcontractor employees, the Contractor shall immediately notify the KO and COR of that information. The Contractor shall make notification of:
(1) Traffic violations, other than parking, will be reported to the KO or COR only if the contract is for drivers for the Government;
(2) Any suspicious activity by Contractor employees, subcontractors, or subcontractor employees the Contractor believes may pose a risk to U.S. or host nation national security or imminent risk of deadly bodily harm to any person; and
(3) Any actions taken against Contractor employees, subcontractors, or subcontractor employees pursuant to this requirement.
1.6.7.5.2 Remedies. In addition to other remedies available to the Government, the Contractor’s failure to comply with the requirements of this paragraph my result in requiring the Contractor to remove a Contractor employee or employees from the performance of the contract.
1.6.7.5.3 Subcontracts. The Contractor shall include the substance of this paragraph and the preceding paragraph in all subcontracts.
1.6.7.6 Uncleared Contractor Common Access Card (CAC) Credentialing and Access Procedures “Reserved”
1.6.7.6.1 Contractor Common Access Card (CAC) Eligible Requirements “Reserved”
1.6.7.6.1.1 Federal Installation/Facility Access: “Reserved”
1.6.7.6.2. Contractor Non CAC Eligible Requirements for DOD Facility and Installation Access: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.7.7 Access to Government Information Systems: “Reserved”
1.6.7.8 Key Control: “Reserved”
1.6.7.8.1 “Reserved”
1.6.7.8.2. “Reserved”
1.6.7.9 Lock Combinations: “Reserved”
1.6.8 Post Award Conference/Contract Periodic Progress Meetings: The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW Federal Acquisition Regulation (FAR) Subpart 42.5. The KO, COR, with other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the KO will apprise the contractor of how the government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.9 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: ensure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, specifications; monitor Contractor's performance and notifies both the KO and Contractor of any deficiencies; coordinate availability of government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.10 Key Personnel: The following contractor personnel are considered key personnel by the government. The Contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate, who shall act for the Contractor when the manager is absent, shall be designated in writing to the Contracting Officer prior to start of contract performance. The Contract Manager and alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The Contract Manager or alternate shall be available between .
Qualifications for all key personnel are listed below:
a) Project Manager: The Contractor Project Manager shall be designated in writing to the KO within five (5) calendar days after the start of the contract. Thereafter, any changes shall be provided five (5) business days prior to expected change and no less than 24 hours after unplanned changes. The contractor must provide with the designation at a minimum the electronic email address and contact telephone. The Government shall be able to locate these key personnel for emergencies after duty hours, including Federal holidays. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language. The Contractor shall designate a Project Manager (PM) who is responsible for the performance of the work. The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract. The PM shall have five (5) years of experience in Furnishings Management or a contract similar in scope and breadth to this solicitation. The name of the PM shall be provided to the KO, and the PM shall be present, on-site, and available during normal duty hours. In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
b) Quality Control Inspector (QCI): The Contractor shall designate QCI personnel sufficient to monitor Contract work to assure compliance with Government requirements. QCI shall have two (2) years of documented experience in quality control of movers and handlers of housing furnishings.
The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).
1.6.11 Special Qualifications or Certifications Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious. Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc.
1.6.11.1 IA/IT Training Certification: All Contractor employees and subcontractor employees supporting IA/IT functions must be certified upon contract award as directed in DoD 8570.01-M, DFARS 252.239.7001, and AR 25-2. Baseline certification as stipulated in DoD 8570.01-M must be completed upon contract award.
1.6.12 Identification of Contractor Employees: Contractor employees shall identify themselves as Contractor personnel and shall avoid representing themselves as Government employees. This identification includes meeting attendance, answering Government telephones, email communications, and working in other situations where Contractor status is not obvious. Contractor personnel identification shall be easily identifiable through the display of badges, name tags, lanyards, etc.
1.6.12.1 Badging of Contractor Employees: If required by the Government, contract personnel and all associated subcontractors employees accessing U.S. facilities or activities, shall present a valid picture ID provided by the Government while accessing Government owned or contracted facilities and shall adhere to facility security policies and restrictions. If applicable, Government issued access badges will not be worn outside designated facility where visible to the general public. Contractor personnel shall return all U.S. Government issued identification to appropriate U.S. Government authorities within five (5) days of the end of their contractual duties.
1.6.12.2 Uniform: The Contractor shall provide a standard uniform for all Contractor and subcontractor employees performing services under this contract, and ensure they wear the uniform during appointed duty hours. The uniform may consist of the same type and color shirt and slacks for all workers. Company logo is optional.
1.6.13 Contractor Travel: “Reserved”
1.6.14 Other Direct Costs (ODC): “Reserved”
1.6.15 Data Rights: “Reserved”
1.6.16. Non-Disclosure Requirements: Performance under this contract may require the Contractor to access data and information proprietary to a Government agency, another Government Contractor, or of such nature that its dissemination or use other than as specified in this work statement would be adverse to the interests of the Government or others. Neither the Contractor, nor Contractor personnel, shall divulge, nor release data or information developed, or obtained under performance of this work statement, except to authorize Government personnel or upon written approval of the KO. The Contractor shall not use, disclose, or reproduce proprietary data, which bears a restrictive legend, other than as specified in this PWS. All documentation showing individual names or other personal information shall apply, and shall be controlled and protected under the provisions of the Privacy Act of 1974, Public Law 93-579, 5 United States Code (U.S.C.) Section 552a.
1.6.16.1 Non-Disclosure Statements: “Reserved”
1.6.16.2 Advertisement and Social Media: The Contractor shall NOT post information to public website or social media locations, personal or professional, that in any way disclose names, locations, hotel data, participants, discussions, pictures, etc. before, during or after the contract period of performance without the express consent of the Government. The use of propaganda violates DOD Commercial Use of Imagery Guidelines stated at (http://www.defenseimagery.mil/products/DODimagery/commercialuse.html). The Contractor shall not cite any information (e.g., contract information, pictures, locations, etc.) obtained through this contract on any marketing tools to include its company website.
1.6.16.3 INFORMATION ASSURANCE: At no time will the Contractor or associated sub-contractor employees transmit government documents or information over using methods that do not meet the security requirements specified in the National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, "Protecting Controlled Unclassified Information in Nonfederal Information Systems and Organizations" such as personal electronic mail accounts, public digital data storage sites (cloud storage), social media platforms or instant messaging. Approved government sites such as U.S. Army Aviation and Missile Research Development and Engineering Center (ARMDEC) Safe Exchange at https://safe.amrdec.army.mil/SAFE/About.aspx, or All Partners Access Network (APAN) at https://community.apan.org/, or other transmission means determined by the government must be used.
1.6.17 Organizational Conflict of Interest (OCI: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.18 Phase-in/Phase-Out (PIPO) Period: “Reserved”
1.6.19 General Training Requirements:
1.6.19.1 Anti-Terrorism (AT) Level I Training “Reserved”
1.6.19.2 OPSEC Awareness: If the Contractor, or a subcontractor, or employees of either disclose any information that disrupts or harms the Government's operations or activities, then the Government retains the right to exclude any employee from performance of duties under this contract. The exclusion of an employee for security reasons will not relieve the Contractor from performance of services required under this contract. By way of example, personnel shall not sketch or take photos of government facilities or activities, unless related to service to be provided. All government paper products and removable digital storage material that is received, generated, or stored during the contract will be destroyed completely when no longer needed to preclude recognition of information.
1.6.19.3 Information Assurance (IA) Training “Reserved”
1.6.19.4 Information Assurance (IA)/Information Technology (IT) Training “Reserved”
1.6.19.5 Threat Awareness Reporting Program (TARP Training) “Reserved”
1.6.19.6 iWATCH Training “Reserved”
1.6.19.7 OPSEC Training “Reserved”
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. Definitions:
2.1.1. Contractor. The total contractor organization or a separate entity of it; such as an affiliate, division, or plant that performs its own purchasing.
2.1.2. Contracting officer (KO). A person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings.
2.1.3. Contracting Officer’s Representative (COR). An individual designated and authorized in writing by the contracting officer to perform specific technical or administrative functions.
2.1.4. Defective Service. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. Deliverable. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. Key Personnel. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. Performance Work Statement (PWS). A statement of work for performance-based acquisitions that describes the required results in clear, specific, and objective terms with measurable outcomes.
2.1.8. Physical Security. Protection of the perimeter area, government property, and assets that prevent the loss or damage of Government property.
2.1.9. Quality Assurance. The various functions, including inspection, performed by the government to determine whether a Contractor has fulfilled the contract obligations pertaining to quality and quantity.
2.1.10. Quality Assurance Surveillance Plan (QASP). A plan describing how the agency will survey, observe, test, sample, evaluate and document the Contractor’s performance in meeting critical performance standards identified in the contract.
2.1.11. Quality Control (QC). Tasks performed by the Contractor to improve the quality of the organization’s output.
2.1.12. Shall. An imperative command; has a duty to or is required to. Denotes that a regulation must be followed unless the contracting officer has obtained a deviation.
2.1.13. Subcontractor. Any supplier, distributor, vendor, or firm that furnishes supplies or services to or for a prime contractor or another subcontractor.
2.1.14. Work Day. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.15. Work Week. Monday through Friday, unless specified otherwise.
2.2 Acronyms:
| ALMS | Army Learning Management System | |
| ANSI | American National Standards Institute | |
| AOR | Area of Responsibility | |
| AR | Army Regulation | |
| ATCTS | Army Training Certification Tracking System | |
| AT | Anti-Terrorism | |
| CAC | Common Access Card | |
| CFR | Code of Federal Regulations | |
| CI | Counter Intelligence | |
| CLIN | Contract Line Item Number | |
| CONUS | Continental United States (excludes Alaska and Hawaii) | |
| COR | Contracting Officer Representative | |
| DD Form 254 | Department of Defense Contract Security Requirement List | |
| DOD | Department of Defense | |
| DODD | Department of Defense Directive | |
| DODI | Department of Defense Instruction | |
| FAR | Federal Acquisition Regulation | |
| FHP | Force Health Protection | |
| FCG | Foreign Clearance Guide | |
| FY | Fiscal Year | |
| GFE | Government Furnished Equipment | |
| GFP | Government Furnished Property | |
| IA | Information Assurance | |
| IAW | In Accordance With | |
| IT | Information Technology | |
| JPAS | Joint Personnel Adjudication System | |
| JTR | Joint Travel Regulation | |
| KO | Contracting Officer | |
| LOA | Letter of Authorization | |
| NCIC-III | National Crime Information Center Interstate Identification Index | |
| NIST | National Institute of Standards and Technology | |
| ODC | Other Direct Costs | |
| OCI | Organizational Conflict of Interest | |
| OCONUS | Outside Continental United States (includes Alaska and Hawaii) | |
| ODC | Other Direct Costs | |
| OSHA | Occupational Safety and Health Administration | |
| OPSEC | Operation Security | |
| PIPO | Phase In/Phase Out | |
| PRS | Performance Requirements Summary | |
| PWS | Performance Work Statement | |
| QA | Quality Assurance | |
| QASP | Quality Assurance Surveillance Plan | |
| QCP | Quality Control Program | |
| RA | Requiring Activity | |
| SCR | Service Contract Reporting | |
| SOP | Standard Operating Procedures | |
| SPOT | Synchronized Predeployment and Operational Tracker | |
| TE | Technical Exhibit | |
| TSDB | Terrorist Screening Data Base | |
| U.S.C. | United States Code |
PART 3
GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1 Government Furnished Property
3.1.1 The contractor shall submit their Property Management System (PMS) procedures at least thirty (30) days after award (Deliverable Technical Exhibit B). The PMS shall contain the intricate details of the inner workings of the contractor’s Property Management System and how it will meet the ten (10) established outcomes (i.e. Acquisition, Receipt (includes Identification), Records, Physical Inventory, Subcontractor Control, Reports, Relief of Stewardship Responsibility/Liability, Utilization (includes Consumption, Movement, and Storage), Maintenance and Property Close-Out (includes Disposition). This written document is known as the contractor’s Property Management System procedures. These procedures are used by the contractor’s operational personnel as their daily standard operating procedure (SOP) for the management of Government Property. The contractor’s Property Management System procedures are working document(s) that may require updates as processes change; however, a contractor cannot change its procedures unilaterally. Proposed changes to the contractor’s processes shall be submitted to the Property Administrator for review/concurrence prior to the implementation of the changes.
3.1.2 A joint inventory of Government-furnished property must be completed within the timeline outlined in the Government approved transition plan. Items of equipment missing or not in working order shall be recorded and the COR shall be notified in writing. The Contractor and the Government representative shall jointly determine the working order and condition of all equipment and document their findings. Rejection of GFP by the Contractor shall not relieve the Contractor of responsibility in performance of this contract, but will relieve the Government from the obligation of providing the same or similar GFP at a future date. The Contractor shall not use property provided by the Government for any purpose other than the performance of this contract. The Contractor shall conduct 100% inventories of Government property at a minimum, annually, IAW Contractor’s approved property management procedures and provide results IAW the DFARS PGI 245.103-72 format.
3.1.2.1 Final Inventory. At the completion of the contract, the Contractor and Government representative(s), shall conduct a joint inventory.
3.1.3 The contractor shall not mark, affix any decals, emblems or signs portraying the contractor's name on Government property. The contractor shall not remove GFP from the Installation or other supported areas without written approval of the KO.
3.1.4 The contractor shall track and maintain warranty records for all contractor property and supplies for use under this contract – both Government furnished and contractor acquired. The contractor shall enforce all warranties when applicable. The contractor shall ensure no unnecessary expenditure of Government funds, either direct or through cost reimbursement, for repair or maintenance of warranted items. The contractor shall inform the Government of difficulties encountered in the enforcement of warranties and of instances in which the costs of enforcement would exceed the benefits derived.
3.1.5 The contractor shall not modify or cannibalize, any GFP/CAP without prior written approval of the KO.
3.1.6 The Government may choose to withdraw or replace GFP at any time during the contract. The KO will provide a written 30-day notice of the impending withdrawal of GFE for use on this contract and provide direction to the contractor as to the method(s) by which the Government may replace GFP. The contractor shall ensure all IT equipment is purged of proprietary data prior to turn-in or disposal IAW the PLCO/KO.
3.1.7 Contractor may be held liable for the loss, damage or destruction of Government property in event of negligence or willful misconduct. The utmost care will be given to the preservation of Government property. The contractor will implement a system in which employees can report fraud waste and abuse to their supervisors without fear of retribution. Contractor will also brief all employees on the procedures for reporting via the Governmental programs.
3.1.8 Loss of any sensitive item will indicate a material weakness in the contractor’s method of accounting for equipment and will revoke the Government’s assumption of risk. Additionally, the KO may revoke the Government’s assumption of risk (see FAR 45.104) if the property administrator determines that the contractor’s property management practices are inadequate and/or present an undue risk to the Government. In the event that any sensitive or CCI Government property furnished to, or acquired by the contractor is lost, damaged, destroyed or stolen, the contractor shall notify the COR in writing within one hour of discovery of loss. The notification must contain a description of the item, serial number and last known location. All loss shall be reported IAW 52.245-1 and approved contractor procedures.
3.2 Emergency and Rescue
3.2.1 The Government will furnish emergency medical and rescue services to prevent loss of life, limb, or undue suffering within the areas serviced by the applicable installation emergency services provider. The Government will seek reimbursement for medical services rendered, as appropriate.
3.2.2 The Government will provide installation fire services to include firefighting, fire prevention inspections and investigations; Installation security services; confined space rescue; and Hazardous Material (HAZMAT) first response.
3.3 Telecommunications/Utilities
3.3.1 The Government will provide reasonable access to Government-furnished telecommunications for official use related to this effort. Line service will include on-post service, and Defense Switched Network (DSN). The cost of unofficial telephone service (e.g., telephone service not incidental to performance of the contract) shall be reimbursed to the Government. The contractor shall ensure compliance with AR 25-1 Information Assurance as related to telecommunications use and access. The Government will not provide reimbursement for additional services or special connectivity relative to contractor unique equipment, software, or corporate requirements.
3.3.2 The Government will furnish appropriate amounts of heat, heating fuels, gas, electricity, sewage, and water utilities, as currently installed in GFF, for use under this contract. All facilities do not receive the same utility services. The contractor shall not change or modify any Government provided utility systems or components or install any CFE components or system without prior KO or designated representative written approval as coordinated through the DPW.
3.3.3 The Government will provide limited access to the existing Local Area Network (LAN) to include electronic mail (e-mail). The number of active LAN drops and e-mail accounts available will be determined by the Government. The contractor shall not use the LAN or e-mail for purposes other than official Government work required under this contract.
3.3.4 Radio frequency assignments and authorization will be controlled and furnished by the Government. The contractor will not operate any radio (e.g. FMS/GMRS [Family Radio Service / General Mobile Radio Service] typically commercially available with frequencies in the 450-470 MHz band and less than 50 watts) on the installation without proper authorization.
3.5.1 The Government will provide special tools, hand tools and equipment that is not included in a general mechanic’s tool set.
3.5.2 The Government will provide calibration and repair services for Government provided Test, Measurement and Diagnostic Equipment (TMDE) as prescribed by applicable AMC program.
3.5.3 Property, equipment, hand tools, tools, parts, furnished materials, and scrap metals resulting from or furnished under this contract shall remain the property of the Government. Unserviceable non-repairable equipment, hand tools, tools, parts, scrap metals and materials shall be disposed of by the contractor in accordance with Class Deviation of Defense Federal Acquisition Regulation Supplement (DFARS) 252.245-7004, Reporting, Reutilization, and Disposal. Contractors are required to complete inventory disposal schedules in the Government Furnished Property (GFP) Module of the Procurement Integrated Enterprise Environment, in lieu of the Defense Contract Management Agency (DCMA) Plant Clearance Automated Reutilization Screening System eTool software application.
3.6 Government Furnished Facilities and Real Property
3.6.1 The Government will provide the facilities listed in Technical Exhibit - A Government Furnished Facilities including installed equipment listed in Technical Exhibit – A Government Furnished Equipment. Some facilities may be jointly occupied by contractor and Government personnel or other third party contractor personnel.
3.6.2 The contractor shall not make alterations to GFF without the prior written approval of DPW.
3.6.3 The contractor is directly responsible to coordinate for any and all facility repairs with the local DPW Work Order Section (emergency or normal work orders) for required repairs.
3.6.4 The contractor shall submit all other facility maintenance, repair, new construction, and major equipment installation requests using DA Form 4283 to the appropriate Facility Coordinator for processing.
3.6.5 The contractor shall establish and maintain an up-to-date GFF work order log on-site for each major functional area and equipment maintenance shop for all DPW work and service orders submitted. The contractor shall ensure the DPW work order logs contain the following information: work order number, date and time work order(s) submitted, name of person initiating work order(s), reason for work order(s), any follow-up data and date of work order closeout.
3.6.6 The Government will provide parking areas for privately owned vehicles (POV). Contractor personnel shall comply with all local regulations and directives concerning POV traffic and parking.
3.6.7 The contractor shall ensure areas are properly being mowed in accordance with DPW provided common levels of service. The contractor will keep all areas controlled and occupied by the contractor free from over-grown vegetation. The contractor may be responsible for incidental grass (weed) trimming / mowing not provided under the DPW common level of service as directed by the KO
3.6.8 The contractor shall clear areas adjacent to GFF as required to gain safe access to facilities from parking areas. This may include sidewalks, walk ways, or other incidental areas.
3.7 Government Furnished Services
3.7.1 The Government will provide preventive maintenance and repair of GFF in accordance with AR 420-1. The contractor shall provide the name and telephone number of its designated point of contact that will be requesting repairs / opening work orders to the appropriate Facility Coordinator during the transition-in period.
3.7.2 The Government may provide scheduled custodial services for contractor operated administrative areas on a limited basis in accordance with the current DPW contract. The contractor shall report to the Government, any discrepancies in performance of Government provided services.
3.7.3 The Government will provide pest control services as required.
3.7.4 The Government will provide grass cutting in accordance with the current post-wide grass cutting contract.
3.7.5 The Government will provide snow removal outside the contractor’s area of responsibility at contractor-occupied facilities.
3.8 The Government will provide available containers at specific contractor occupied facilities for collection of recyclable paper and cardboard, on-hand scrap metal, non-hazardous waste wood and wood by-products, and trash pickup.
Page 2 of 2 Version 202407
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4.1 Contractor‑Furnished Facilities and Equipment – General
4.1.1 The contractor shall procure all materials, equipment, and supplies necessary to perform the removal, replacement, installation, and commissioning of the DC battery plant in Building 30430. The contractor shall ensure all on‑site personnel are equipped with the proper electrical, mechanical, and safety tools required for battery system work, hazardous material handling, and remote‑site access (e.g., battery lifting equipment, insulated tools, test instruments, PPE, and ATV‑compatible transport containers). The Government shall not provide individual tools or specialty equipment for this effort. Each technician must arrive fully equipped with the tools required to complete assigned tasks. The Government assumes no risk for contractor‑owned tools; at no time shall the Government be responsible for lost, damaged, or broken tools.
4.1.2 Except for those items specifically identified as Government‑furnished in Part 3, the contractor shall furnish all labor, materials, equipment, transportation, and support necessary to execute the full replacement of the DC battery system in accordance with all terms, conditions, and technical requirements of this PWS.
4.1.3 Contractor‑furnished equipment that becomes inoperable or unserviceable for any reason shall be removed from the installation within ten (10) business days of failure. Equipment condition shall not relieve the contractor of its responsibility to maintain continuous performance of required services, including safe transport to the remote site and uninterrupted execution of battery replacement activities. The contractor shall immediately notify the KO and COR, in writing, of any delays caused by equipment or material issues.
4.1.4 If additional communication or monitoring equipment is required to support battery commissioning, remote alarm integration, or coordination with the Network Enterprise Center (NEC), the contractor shall furnish such equipment. Any associated costs must be approved in writing by the KO prior to installation or use.
4.1.5 All contractor‑furnished vehicles—including ATVs, trailers, and transport vehicles used to access Building 30430—shall be maintained in a neat, presentable, and fully operational condition and must meet all Government safety inspection standards. Vehicles not meeting standards shall not be operated or stored on the installation. The contractor shall clearly mark both sides of all vehicles with the contractor’s company name and telephone number.
4.2 Materials and Equipment
4.2.1 The contractor shall use equipment of the appropriate type and capacity to safely remove, transport, install, and test the new DC battery plant. When required, contractor equipment may operate from existing Government‑furnished electrical power sources. All contractor‑owned equipment shall bear a permanent, highly visible contractor identification nameplate. If commingling of Government‑furnished and contractor‑furnished equipment occurs, the contractor shall ensure all items remain clearly identifiable and separable for inspection and inventory.
4.2.2 The contractor shall maintain sufficient quantities of materials and supplies to ensure uninterrupted performance of all work associated with the battery plant replacement. Failure to maintain adequate stock levels shall not justify delays or reductions in service. The contractor shall maintain inventory levels necessary to support continuous operation of mission‑critical systems, including temporary power support if required. Mission‑critical systems include those directly supporting communication, safety, and operational continuity for Fort Bliss ranges and Special Operations. The contractor shall maintain a rapid‑procurement process for items not stocked on‑hand, including a vendor list, availability data, and expected delivery timelines for all critical electrical and battery‑system components.
PART 5
SPECIFIC TASKS
5. SPECIFIC TASKS: The contractor shall provide all labor, materials, equipment, transportation, supervision, and non‑personal services necessary to remove, replace, and dispose of the existing DC battery plant in Building 30430; conduct demand‑load analysis; design and install the replacement battery system; integrate remote monitoring alarms; and ensure continuous mission‑critical communication support for Fort Bliss ranges and Special Operations. All work shall comply with IEEE Std 1188, NFPA 70 (2020), UFC 3‑520‑01, MIL‑HDBK‑419A, environmental regulations, and all requirements identified in this PWS.
5.1 BASIC SERVICES: The contractor shall perform all services required to safely remove the existing DC battery system, install the replacement plant, conduct system testing, integrate remote monitoring alarms, and ensure operational continuity of the Land Mobile Radio (LMR) facility. Services shall be performed in accordance with applicable commercial, industry, IEEE, NFPA, UFC, Army, and environmental standards. Work shall be scheduled to ensure site access during solar production hours unless otherwise coordinated with the NEC.
5.2 TASKS
5.2.1 Battery Plant Replacement (HLO)
Replacement of the DC battery plant in Building 30430.
5.2.1.1 Battery Plant Removal and Disposal (Task Statement):The contractor shall remove all existing battery banks, cells, racks, cabling, and associated components and…