Copy_of_Washers_and_Dryers_TE__002.xlsx
XLSX spreadsheet 25 KB Posted
- Solicitation number
- W911SG-19-R-0015
About this file
Washer and Dryers TE#002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_Question_27_March_2019_(002)1.docx | DOCX document | |
| 25_March_2019_More_Questions_(002).docx | DOCX document | |
| Site_Visit_Registration_Form_for_27_March_2019_Visit.doc | DOC document | |
| W911SG-19-R-0015-0002_Washer_and_Dryers.pdf | ||
| Wage_Determination_for_Services_New_Mexico.pdf | ||
| Reply_to_Questions_asked_18_March_2018.docx | DOCX document | |
| WAGE_DETERMINATION_FOR_SERVICES_12-26-2018.pdf | ||
| Reply_to_Questions_for_clarification_15_March_2019_rp.docx | DOCX document | |
| W911SG-19-R-0015_Questions_w_replies_14Mar19.docx | DOCX document | |
| W911SG-19-R-0015-0001_Amendment_Solicitation.pdf | ||
| Question_for_Washers_and_Dryers_Service.docx | DOCX document | |
| W911SG-19-R-0015_Solicitation_Washers_and_Dryers_Mantenance.pdf | ||
| PWS_for_Washers__Dryers_revision__6_20191801.docx | DOCX document | |
| Copy_of_Washer__Dryer_TE__001.xlsx | XLSX spreadsheet | |
| Wage_Determination_for_Services.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W&D Phase in-Phase Out
| Building # | Washers | Dryers | Type Washer | Type Dryer | Stack | Removal | Installing | Installation Date | ||||
| IBCT I Buildings - Phase 1 | ||||||||||||
| 21165 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 1 | 2/4/19 | |||
| 21167 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 1 | 2/4/19 | |||
| 21166 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 1 | 2/4/19 | |||
| 21168 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 2 | 2/5/19 | |||
| 21169 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 2 | 2/5/19 | |||
| 21170 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 2 | 2/5/19 | |||
| 21180 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 3 | 2/6/19 | |||
| 21181 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 3 | 2/6/19 | |||
| 21182 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 3 | 2/6/19 | |||
| 21183 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 4 | 2/7/19 | |||
| 21184 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 4 | 2/7/19 | |||
| 21185 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 4 | 2/7/19 | |||
| Total | 120 | 96 | 36 | 36 | 72 | |||||||
| IBCT II Buildings - Phase 2 | ||||||||||||
| 21205 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 5 | 2/8/19 | |||
| 21207 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 5 | 2/8/19 | |||
| 21206 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 5 | 2/8/19 | |||
| 21208 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 6 | 2/11/19 | |||
| 21209 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 6 | 2/11/19 | |||
| 21210 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 6 | 2/11/19 | |||
| 21220 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 7 | 2/12/19 | |||
| 21221 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 7 | 2/12/19 | |||
| 21222 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 7 | 2/12/19 | |||
| 21224 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 8 | 2/13/19 | |||
| 21223 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 8 | 2/13/19 | |||
| 21225 | 10 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 8 | 2/13/19 | |||
| Total | 120 | 96 | 36 | 36 | 72 | |||||||
| BCT III Buildings - Phase 3 | ||||||||||||
| 20600 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 9 | 2/14/19 | |||
| 20605 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 9 | 2/14/19 | |||
| 20610 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 9 | 2/14/19 | |||
| 20615 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 10 | 2/15/19 | |||
| 20630 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 10 | 2/15/19 | |||
| 20635 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 10 | 2/15/19 | |||
| 20640 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 11 | 2/19/19 | |||
| 20645 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 11 | 2/19/19 | |||
| 20650 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 11 | 2/19/19 | |||
| 20655 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 12 | 2/20/19 | |||
| 20665 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 12 | 2/20/19 | |||
| 21014 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 12 | 2/20/19 | |||
| Total | 132 | 96 | 36 | 36 | 72 | |||||||
| BCT II Buildings - Phase 4 | ||||||||||||
| 20300 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 13 | 2/21/19 | |||
| 20305 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 13 | 2/21/19 | |||
| 20310 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 13 | 2/21/19 | |||
| 20315 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 14 | 2/22/19 | |||
| 20330 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 14 | 2/22/19 | |||
| 20335 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 14 | 2/22/19 | |||
| 20340 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 15 | 2/25/19 | |||
| 20345 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 15 | 2/25/19 | |||
| 20350 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 15 | 2/25/19 | |||
| 20355 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 16 | 2/26/19 | |||
| 20360 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 16 | 2/26/19 | |||
| Total | 121 | 88 | 33 | 33 | 66 | |||||||
| BCT I Buildings - Phase 5 | Hours | Hours | ||||||||||
| 20200 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 17 | 2/27/19 | |||
| 20205 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 17 | 2/27/19 | |||
| 20210 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 17 | 2/27/19 | |||
| 20215 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 18 | 2/28/19 | |||
| 20230 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 18 | 2/28/19 | |||
| 20235 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 18 | 2/28/19 | |||
| 20240 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 19 | 3/1/19 | |||
| 20245 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 19 | 3/1/19 | |||
| 20250 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 19 | 3/1/19 | |||
| 20255 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 20 | 3/4/19 | |||
| 20265 | 11 | 8 | Top Load | Gas | Stack | 3 | 3 | Day 20 | 3/4/19 | |||
| Total | 121 | 88 | 33 | 33 | 66 | |||||||
| CAB Buildings - Phase 6 | ||||||||||||
| 11341 | 20 | 15 | Top Load | Electric | Stack | 4 | 4 | Day 21 | 3/5/19 | |||
| 11342 | 20 | 15 | Top Load | Electric | Stack | 4 | 4 | Day 21 | 3/5/19 | |||
| 11343 | 20 | 15 | Top Load | Electric | Stack | 4 | 4 | Day 22 | 3/6/19 | |||
| 11344 | 20 | 15 | Top Load | Electric | Stack | 4 | 4 | Day 22 | 3/6/19 | |||
| Total | 80 | 60 | 16 | 16 | 32 | |||||||
| Biggs Field - Phase 7 | ||||||||||||
| 11144 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 23 | 3/7/19 | |||
| 11147 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 23 | 3/7/19 | |||
| 11150 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 23 | 3/7/19 | |||
| 11151 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 23 | 3/7/19 | |||
| 11152 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 23 | 3/7/19 | |||
| 11354 | 3 | 4 | Top Load | Electric | Single | 1 | 1 | Day 23 | 3/7/19 | |||
| Total | 13 | 14 | 6 | 6 | 12 | |||||||
| IHG Barracks - Phase 8 | ||||||||||||
| 11265 | 6 | 8 | Top Load | Electric | Single | 2 | 2 | Day 24 | 3/8/19 | |||
| 11266 | 5 | 6 | Top Load | Electric | Single | 2 | 2 | Day 24 | 3/8/19 | |||
| 11332 | 5 | 6 | Top Load | Electric | Single | 2 | 2 | Day 24 | 3/8/19 | |||
| Total | 16 | 20 | 6 | 6 | 12 | |||||||
| Beaumont/WTU - Phase 9 | ||||||||||||
| 880 | 69 | 75 | Front Load | Gas | Single | 8 | 8 | Day 25 | 3/11/19 | ADA COMPLIANT | 27W X 29L X 41.5H This would be the critical dimensions for the ADA compliant machines in the WTU building. | |
| 2900 Area - Phase 10 | ||||||||||||
| 2901 | 8 | 10 | Top Load | Electric | Single | 2 | 2 | Day 26 | 3/12/19 | |||
| 2902 | 8 | 9 | Top Load | Electric | Single | 2 | 2 | Day 26 | 3/12/19 | |||
| 2903 | 8 | 9 | Top Load | Electric | Single | 2 | 2 | Day 26 | 3/12/19 | |||
| 2904 | 8 | 9 | Top Load | Electric | Single | 2 | 2 | Day 27 | 3/13/19 | |||
| 2905 | 8 | 9 | Top Load | Electric | Single | 2 | 2 | Day 27 | 3/13/19 | |||
| Total | 40 | 46 | 10 | 10 | 20 | |||||||
| 2400 Area - Phase 11 | ||||||||||||
| 243 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 27 | 3/13/19 | |||
| 2410 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 28 | 3/14/19 | |||
| 2411 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 28 | 3/14/19 | |||
| 2412 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 28 | 3/14/19 | |||
| 2413 | 6 | 7 | Top Load | Electric | Single | 1 | 1 | Day 29 | 3/15/19 | |||
| 2414 | 5 | 7 | Top Load | Electric | Single | 2 | 2 | Day 29 | 3/15/19 | |||
| 2416 | 8 | 9 | Top Load | Electric | Single | 2 | 2 | Day 29 | 3/15/19 | |||
| 2417 | 9 | 9 | Top Load | Electric | Single | 2 | 2 | Day 30 | 3/18/19 | |||
| 2418 | 7 | 8 | Top Load | Electric | Single | 1 | 1 | Day 30 | 3/18/19 | |||
| 2419 | 8 | 6 | Top Load | Electric | Single | 2 | 2 | Day 30 | 3/18/19 | |||
| 2420 | 5 | 6 | Top Load | Electric | Single | 1 | 1 | Day 31 | 3/19/19 | |||
| 2421 | 7 | 7 | Top Load | Electric | Single | 2 | 2 | Day 31 | 3/19/19 | |||
| 2442 | 7 | 7 | Top Load | Electric | Single | 2 | 2 | Day 31 | 3/19/19 | |||
| 2444 | 9 | 8 | Top Load | Electric | Single | 2 | 2 | Day 32 | 3/20/19 | |||
| 2445 | 8 | 8 | Top Load | Electric | Single | 2 | 2 | Day 32 | 3/20/19 | |||
| 2447 | 7 | 8 | Top Load | Electric | Single | 1 | 1 | Day 32 | 3/20/19 | |||
| 2448 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 33 | 3/21/19 | |||
| 2449 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 33 | 3/21/19 | |||
| 2450 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 33 | 3/21/19 | |||
| 2452 | 4 | 4 | Top Load | Electric | Single | 2 | 2 | Day 34 | 3/22/19 | |||
| 2471 | 8 | 6 | Top Load | Electric | Single | 2 | 2 | Day 34 | 3/22/19 | |||
| 2472 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 34 | 3/22/19 | |||
| 2473 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 35 | 3/25/19 | |||
| 2474 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 35 | 3/25/19 | |||
| 2475 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 35 | 3/25/19 | |||
| 2476 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 36 | 3/26/19 | |||
| 2477 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 36 | 3/26/19 | |||
| 2478 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 36 | 3/26/19 | |||
| 2479 | 6 | 6 | Top Load | Electric | Single | 2 | 2 | Day 37 | 3/27/19 | |||
| 2480 | 4 | 4 | Top Load | Electric | Single | 2 | 2 | Day 37 | 3/27/19 | |||
| Total | 188 | 190 | 55 | 55 | 110 | |||||||
| 1000 Area - Phase 12 | ||||||||||||
| 1003 | 9 | 7 | Top Load | Electric | Stack | 2 | 2 | Day 38 | 3/28/19 | |||
| 1004 | 8 | 7 | Top Load | Electric | Stack | 2 | 2 | Day 38 | 3/28/19 | |||
| 1005 | 11 | 9 | Top Load | Electric | Stack | 2 | 2 | Day 38 | 3/28/19 | |||
| 1006 | 12 | 9 | Top Load | Electric | Stack | 3 | 3 | Day 39 | 3/29/19 | |||
| 1007 | 10 | 6 | Top Load | Electric | Stack | 2 | 2 | Day 39 | 3/29/19 | |||
| 1008 | 10 | 8 | Top Load | Electric | Stack | 3 | 3 | Day 39 | 3/29/19 | |||
| 1009 | 20 | 20 | Top Load | Electric | Single | 3 | 3 | Day 40 | 4/1/19 | |||
| 1010 | 9 | 12 | Top Load | Electric | Single | 2 | 2 | Day 40 | 4/1/19 | |||
| 1011 | 12 | 9 | Top Load | Electric | Stack | 3 | 3 | Day 40 | 4/1/19 | |||
| 1012 | 12 | 9 | Top Load | Electric | Stack | 3 | 3 | Day 41 | 4/2/19 | |||
| 1013 | 12 | 9 | Top Load | Electric | Stack | 3 | 3 | Day 41 | 4/2/19 | |||
| 1014 | 12 | 9 | Top Load | Electric | Stack | 3 | 3 | Day 41 | 4/2/19 | |||
| Total | 137 | 114 | 31 | 31 | 62 | |||||||
| BOQ & SOQ Area - Phase 13 | ||||||||||||
| 5040 | 2 | 2 | Bottom | Electric | Combo | 1 | 1 | Day 42 | 4/3/19 | We need stacked washer and dryer combo. We were just letting you know the washer is on the bottom with a dryer on top. | ||
| 5045 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 42 | 4/3/19 | |||
| Total | 3 | 3 | 2 | 2 | 4 | |||||||
| 900 Area - Phase 14 | ||||||||||||
| 900C | 20 | 15 | Top Load | Gas | Stack | 3 | 3 | Day 42 | 4/3/19 | |||
| 909C | 15 | 10 | Top Load | Gas | Stack | 3 | 3 | Day 43 | 4/4/19 | |||
| 919C | 15 | 10 | Top Load | Gas | Stack | 3 | 3 | Day 43 | 4/4/19 | |||
| Total | 50 | 35 | 9 | 9 | 18 | |||||||
| 7309 | 8 | 9 | Top Load | Electric | Single | 2 | 2 | Day 44 | 4/5/19 | |||
| Total | 8 | 9 | 2 | 2 | 4 | |||||||
| McGregor - Phase 15 | ||||||||||||
| 9408 Portable | 10 | 10 | Top Load | Electric | Single | 2 | 2 | Day 45 | 4/8/19 | |||
| 9412 Portable | 10 | 10 | Top Load | Electric | Single | 2 | 2 | Day 45 | 4/8/19 | |||
| 9419 Portable | 10 | 10 | Top Load | Electric | Single | 2 | 2 | Day 46 | 4/9/19 | |||
| 9423 Portable | 10 | 10 | Top Load | Electric | Single | 2 | 2 | Day 46 | 4/9/19 | |||
| 9427 Portable | 8 | 6 | Top Load | Electric | Single | 2 | 2 | Day 47 | 4/10/19 | |||
| 9513 | 42 | 23 | Top Load | Gas | Stack | 4 | 4 | Day 48 | 4/11/19 | |||
| 9403 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 49 | 4/12/19 | |||
| 9404 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 49 | 4/12/19 | |||
| 9405 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 49 | 4/12/19 | |||
| 9406 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 49 | 4/12/19 | |||
| 9407 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 49 | 4/12/19 | |||
| 9408 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 50 | 4/15/19 | |||
| 9409 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 50 | 4/15/19 | |||
| 9410 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 50 | 4/15/19 | |||
| 9411 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 50 | 4/15/19 | |||
| 9412 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 50 | 4/15/19 | |||
| 9413 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 51 | 4/16/19 | |||
| 9414 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 51 | 4/16/19 | |||
| 9416 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 51 | 4/16/19 | |||
| 9417 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 51 | 4/16/19 | |||
| 9418 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 51 | 4/16/19 | |||
| 9419 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 52 | 4/17/19 | |||
| 9420 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 52 | 4/17/19 | |||
| 9421 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 52 | 4/17/19 | |||
| 9422 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 52 | 4/17/19 | |||
| 9423 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 52 | 4/17/19 | |||
| 9425 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 53 | 4/18/19 | |||
| 9427 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 53 | 4/18/19 | |||
| 9428 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 53 | 4/18/19 | |||
| 9430 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 53 | 4/18/19 | |||
| 9432 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 53 | 4/18/19 | |||
| 9435 | 8 | 10 | Front Load | Gas | Single | 2 | 2 | Day 54 | 4/19/19 | |||
| 9448 | 16 | 20 | Top Load | Electric | Single | 4 | 4 | Day 55 | 4/22/19 | |||
| 9449 | 16 | 20 | Top Load | Electric | Single | 4 | 4 | Day 56 | 4/23/19 | |||
| 9450 | 16 | 20 | Top Load | Electric | Single | 4 | 4 | Day 57 | 4/24/19 | |||
| 9451 | 16 | 20 | Top Load | Electric | Single | 4 | 4 | Day 58 | 4/25/19 | |||
| 9504 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 59 | 4/26/19 | |||
| 9506 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 59 | 4/26/19 | |||
| 9517 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 59 | 4/26/19 | |||
| 9518 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 59 | 4/26/19 | |||
| 61 | 61 | 122 | ||||||||||
| Total | 218 | 215 | ||||||||||
| Westbrook - Phase 16 | ||||||||||||
| Building 11 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 60 | 4/29/19 | |||
| Building 12 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 60 | 4/29/19 | |||
| Building13 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 60 | 4/29/19 | |||
| Building14 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 61 | 4/30/19 | |||
| Building 15 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 61 | 4/30/19 | |||
| Building 16 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 61 | 4/30/19 | |||
| Building 17 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 62 | 5/1/19 | |||
| Building 18 | 6 | 3 | Front Load | Propane | Stack | 2 | 2 | Day 62 | 5/1/19 | |||
| Total | 48 | 24 | 16 | 16 | 32 | |||||||
| Oro Grande Area - Phase 17 | ||||||||||||
| 8609 | 1 | 1 | Top Load | Electric | Single | Day 63 | 5/2/19 | |||||
| 8610 | 1 | 1 | Top Load | Electric | Single | Day 63 | 5/2/19 | |||||
| 8680 | 1 | 1 | Top Load | Electric | Single | Day 63 | 5/2/19 | |||||
| 8681 | 1 | 1 | Top Load | Electric | Single | Day 63 | 5/2/19 | |||||
| 8682 | 1 | 1 | Top Load | Electric | Single | Day 63 | 5/2/19 | |||||
| Total | 5 | 5 | 3 | 3 | 6 | |||||||
| Dona Ana Area - Phase 18 | ||||||||||||
| 8127 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8128 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8129 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8221 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8222 | 2 | 2 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8252 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8253 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8254 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8255 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8256 | 1 | 1 | Top Load | Electric | Single | 1 | 1 | Day 64 | 5/3/19 | |||
| 8257 | 10 | 10 | Top Load | Electric | Single | 2 | 2 | Day 65 | 5/6/19 | |||
| 8258 | 10 | 10 | Top Load | Electric | Single | 2 | 2 | Day 65 | 5/6/19 | |||
| Total | 34 | 34 | 14 | 14 | 28 | |||||||
| Warehouse Bldg 1103 - Phase 19 | ||||||||||||
| 1103 - Warehouse | 76 | 67 | Day 66 | 5/7/19 | ||||||||
| Total | ||||||||||||
| Dryers | ||||||||||||
| Total Washers | 1523 | Gas Stack-27 | 2333 | |||||||||
| Total Dryers | 1308 | Propane Stack - 1 | ||||||||||
| Total Units | 2831 | Electric Stack - 7 | ||||||||||
| W/D Combo - 1 | ||||||||||||
| Frontload ADA Comp - 4 | ||||||||||||
| Frontload SGL Elec - 27 | ||||||||||||
| Total Dryers 67 | ||||||||||||
| Washers | ||||||||||||
| Frontload ADA Comp - 3 | ||||||||||||
| Frontload Washers - 3 | ||||||||||||
| Topload Washers - 70 | ||||||||||||
| Total Washers 76 |