GENERAL CONSTRUCTION NOTES:
1. THE CONTRACTOR SHALL CONSTRUCT TEMPORARY BYPASS ROAD IN
CONJUNCTION WITH THE TRAFFIC CONTROL PLAN. THE CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING THE TEMPORARY BYPASS ROAD
THOUGHOUT THE DURATION OF THE PROJECT AS PER NMDOT STANDARD
SPECIFICATIONS FOR HIGHWAY AND BRIDGE CONSTRUCTION (SSHBC)
SECTION 405, DETOUR PAVEMENTS.
2. THE CONTRACTOR SHALL BLADE AND GRADE THE BYPASS ROAD TO A
SMOOTH AND CONTINUOUS ALIGNMENT WITH MINIMUM RADIUS OF
CURVATURE AS SHOWN. ELEVATION TO MATCH EXISTING PAVEMENT
ELEVATION OF HEADQUARTERS AVE.
3. REMOVE AND DISPOSE OF SILT ON THE ARROYO (MIN. 12”) TO THE WSMR
LANDFILL PRIOR TO CONSTRUCTING THE BYPASS ROAD.
4. SCARIFY AND BUILT UP THE BYPASS ROAD AS SHOWN ON THE CROSS
SECTION: 24 FT WIDE ROAD WITH 2% CROWN SLOPE; EMBANKMENT SLOPES
NO STEEPER THAN 3:1. CONTRACTOR MAY USE WSMR BORROW PITS. ALL
FILL MATERIALS SHALL BE COMPACTED IN IN LIFTS NOT TO EXCEED 8”.
PREPARE SUBGRADE AS PER SECTION 207 OF NMDOT SSHBC, 2014 ED.
PROVIDE, INSTALL AND COMPACT TYPE II BASE COURSE MATERIAL AS PER
SECTION 303 OF THE NMDOT SSHBC, 2014 ED. PRIME COAT AND PLACE 1.5”
THICK CLASS B ASPHALT MIX PERFORMANCE GRADE PG 64-22.
5. INSTALL FIVE 42” DIAMETER CORRUGATED METAL PIPE (CMP) AS PER
SECTION 206 OF NMDOT SSHBC, 2014 ED. CMP SHALL BE GALVANIZED GAGE
14 WITH 2-2/3” x ½” CORRUGATIONS AND CAPABLE TO WITHSTAND H20 AND
H25 LIVE LOADS.
6. INCLUDE TEMPORARY LANE MARKINGS ON THE BYPASS ROAD, BOTH
CENTER AND EDGE LINES.
7. UPON COMPLETION AND ACCEPTANCE OF THE WORK, THE CONTRACTOR
SHALL REMOVE THE TEMPORARY BYPASS ROAD; DISPOSE OF MATERIALS
TO THE RECYCLING CENTER AND/OR LANDFILL ACCORDINGLY; AND RE-
ESTABLISH SURROUNDING AREA TO ORIGINAL OR BETTER CONDITIONS
WITH SURFACE RUNOFF FLOW INTO THE ARROYO.