About this file

Attachment Rc

View the file

Other files

File Type Posted
Amendment-7.pdf PDF
Amendment-7-Guardian-60kW.pdf.pdf PDF
Amendment-6.pdf PDF
Amendment-5.pdf PDF
Attachment_T_v2.pdf PDF
Amendment-4.pdf PDF
Amendment_3.pdf PDF
Sign-In_Sheet.pdf PDF
REC.pdf PDF
Amendment_2.pdf PDF
Amendment_1.pdf PDF
Attachment_U.pdf PDF
Attachment_I.pdf PDF
Attachment_K.pdf PDF
Attachment_E.pdf PDF
Attachment_Ra.pdf PDF
Attachment_H.pdf PDF
Attachment_D.pdf PDF
Attachment_L.pdf PDF
W911SF-12-R-0020.pdf PDF
Attachment_F.pdf PDF
Attachment_A.pdf PDF
Attachment_O.pdf PDF
Attachment_C.pdf PDF
Attachment_B.pdf PDF
Attachment_R.pdf PDF
Attachment_M.pdf PDF
Attachment_Rb.pdf PDF
Attachment_P.pdf PDF
Attachment_J.pdf PDF
Attachment_Q.pdf PDF
Attachment_Rd.pdf PDF
Attachment_T.pdf PDF
Attachment_N.pdf PDF
Attachment_G.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORT BENNING, GEORGIA

DIRECTORATE OF

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

SCALE: �" = 1’-0"

P-4

43105-FP1

FP1

FIRE SUPPRESSION SYSTEM

SEE SECTION 21 13 00.00 40, FIRE SUPPRESSION SPRINKLER SYSTEM FOR MATERIALS AND INSTALLATION REQUIREMENTS.

SEE ARCHITECTURAL DRAWINGS FOR BUILDING DETAILS, ELEVATION VEIWS, AND BUILDING CROSS SECTIONAL VIEWS.

LIGHTS, AND EQUIPMENT CIRCUITS, AND WALL RECEPTACLE CIRCUITS.

SEE ELECTRICAL DRAWINGS AND DRAWINGS FOR THE FIRE ALARM CONTROLS AND MASS NOTIFICATION SYSTEMS, SEE SHEETS P1 THROUGH P5 FOR PLUMBING SYSTEMS.

SEE SHEETS M1 AN DM2 FOR HVAC AND EXHAUST SYSTEMS.

CONTRACTOR TO DESIGN FIRE SUPPRESSION SYSTEM FOR THE FIRE STATION.

FIRE SUPPRESSION SYSTEM

HVAC PLAN -FIRE STATION

DIRECTORATE OF

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

M1

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

SCALE: �" = 1’-0"

60 60

150 160

150140140

200 200

150 215

10" DIA

" D

IA

5" DIA5" DIA

6" DIA

7" DIA

X

12 X 12 12 X 10 12 X 8

D

IA

" D

IA

D

IA

12" DIA

9" DIA

9" DIA

10" DIA

7" DIA

9" DIA

" D

IA

12 X 12 12 X 10 12" DIA

" D

IA

10" DIA

10" DIA

9" DIA

EF-1

EF-2

EF-3

EF-4 EF-5

UH-1 UH-2

UH-3 UH-4

UH-5 UH-6

HVAC PLAN

AIR HANDLER.

CEILING MOUNTER

PAD

ON 6-INCH HIGH CONCRETE

� TON CONDENSER

CONCRETE PAD

ON 6 INCH HIGH

12.5 TON CONDENSER

12 X 4

DL

12 X 4

DL

12 X 4

DL

12 X 4

DL

12 X 5

DL

6 X 6

DL

6 X 6

DL

12 X 6

WL

12 X 4

DL

12 X 12

DL

12 X 5

DL

INSULATION WITH PLASTIC TIE STRAPS OR DUCT SUPPORTS.

INSULATION WHEN INSTALLING THE TAPE. DO NOT COMPRESS THE

INSULATION AT LEAST THREE INCHES. DO NOT COMPRESS THE

LAP THE MASTIC ONTO THE METAL SURFACE OF THE DUCT/

BETWEEN THE LAYERS BEFORE APPLYING THE MASTIC. OVER

INSTALL THREE (3) LAYERS OF TAPE, REMOVING AIR POCKETS

SEALED WITH UL-181 METAL FOIL TAPE AND DUCT MASTIC.

SEAMS AND JOINTS OF DUCTWORK AND INSULATION SHALL BE

BACKED BLANKET INSULATION (MINIMUM 2 INCHES THICK).

22 GAUGE, GALVANIZED STEEL, INSULATED WITH METAL FOIL

DUCTWORK:

SPLIT SYSTEM AIR CONDITIONER UNIT

MOCP: 20

MCA: 12.7

FLA: 10.2

208 VOLTS, 3 PAHSE, 60 HZ

3.7 HP,

BLOWER MOTOR:

CARRIER 40RUA14

AIR HANDLER:

MOCP: 100

MCA: 90.9

FLA: 62.5

-TOTAL: 22.5 KW

-STAGE 2: 7.5 KW

-STAGE 1: 15 KW

TWO STAGE HEATING:

COOLING: 12.5 TONS

POWER SUPPLY: MCA: 53.4, FUSE: 60

FLA: 1.5 EACH

FAN MOTORS (2 EACH): WATTS: 325 EACH,

COMPRESSOR NO. 2: RLA:22.4, LRA149

COMPRESSOR NO. 1: RLA: 22.4, LRA: 149

12.5 TONS, EER: 11.0

3 PHASE, 60 HZ

208 VOLTS

CARRIER 38AUD14

CONDENSER:

2 KW EACH, 3 PHASE, 208 VOLTS, 60 HZ

ELECTRIC RADIANT UNIT HEATERS

TYPICAL FOR 6 EACH CEILING MOUNTED

BALANCING DAMPER

AND 70 DEGREES F DURING THE HEATING SEASON.

MAINTAIN SPACES IN BUILDING AT 74 DEGREES F DURING COOLING SEASON

WINTER AMBIENT TEMPERATURE: 25 DEGREES F

76 DEGREES F WET BULB

SUMMER AMBIENT TEMPERATURES: 95 DEGREES F DRY BULB,

DESIGN PARAMETERS:

HEATING LOAD: 61,740 BTUH (18.08 KW) (2 STAGE HEATING)

STATIC PRESSURE LOSS (DUCT ONLY): 1.84 INCHES W.G.

OUTSIDE AIR: 400 CFM

TOTAL AIR: 4300 CFM

TOTAL LOAD: 158,866 BTUH

SENSIBLE COOLING LOAD: 129,000 BTUH

3" FD

CEILING

DRAIN ABOVE

�" CONDENSATE

�" DOWN

CFM RETURN AIR FLOW

WALL COLLAR 3900

AIR LOUVER AND

48 X 24 RETURN

IN DUCT CONNECTION AT MIXING BOX.

48 X 24 RETURN AIR DAMPER LOCATED

UNDER 43 X 12 SUPPLY DUCT.

48 X 24 RETURN AIR DUCT

DRAIN TO 3" FD

1" CONDENSATE

AIR DUCT.

TO MIXING BOX. INSULATE RETURN AIR DUCT AS SPECIFIED FOR SUPPLY

SET THE DAMPER FOR 400 CFM. ROUTE 12 X 12 DUCT TO AND CONNECT

AND FITTED WITH AN INSECT SCREEN. BALANCING DAMPER SHALL BE MANUAL.

WALL LOUVER SHALL BE GALVANIZED OR STAINLESS STEEL CONSTRUCTED

LOCATE THE INTAKE NO LESS THAN 9 FEET ABOVE THE FINAL GRADE.

12 X 12 THROUGH WALL OUTSIDE AIR INTAKE VENT AND WALL COLLAR.

DUCT DOWN

12 X 12 RETURN AIR

WITH PAINTABLE SILICONE SEALANT.

BETWEEN PIPE SLEEVES AND WALL

FIRE RESISTANT FOAM. SEAL JOINT

PIPING AND WALL SLEEVES WITH

SEAL SEAMS BETWEEN REFRIGERANT

DUCT CONNECTIONS OF THE LARGER UNIT.

PROVIDE FLEXIBLE DUCT CONNECTERS ON THE SUPPLY AND RETURN AIR

THE LARGE UNIT ONLY.

PROVIDE SMOKE DETECTORS IN SUPPLY AND RETURN AIR DUCT OF

43105-M1

12 X 16

DL

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

SCALE: �" = 1’-0"

EXHAUST FAN AND VENT PLAN

43105-M2

M2

CONTROLLED BY EF-6

ELECTRIC MOTOR OPERATED

48 X 18 WALL LOUVER

CONTROLLED BY EF-7

ELECTRIC MOTOR OPERATED

48 X 18 WALL LOUVER

4" DIA

FOR EACH LATRINE

SIDEWALLEXHAUST CAPS

6-INCH DIA MUSHROOM

6" DIA

EF-4

EF-2

EF-1

EF-3

EF-5

STEEL CONSTRUCTION

SCREEN. ALUMINUM OR STAINLESS

WITH GRAVITY DAMPER AND INSECT

DRYER EXHAUST. CAP EQUIPPED

3000 CFM

EF-7

3000 CFM

EF-6

EF-6

WALL SWITCH

WALL SWITCH

EF-7

WALL CAP.

FROM RANGE HOOD TO

WRAP EXHAUST VENT

FOR RANGE HOOD. FIRE

STEEL EXHAUST VENT

JOINT, 7" GALVANIZED

20 GAUGE, TWIST LOCK

WITH INSECT SCREEN

230 CFM GRAVITY DAMPER

FOR KITCHEN EXHAUST,

SIDEWALL MUSHROOM CAP

12 INCHES ABOVE FLOOR

AIR DUCT DOWN TO

48 X 18 FRESH

12 INCHES ABOVE FLOOR

AIR DUCT DOWN TO

48 X 18 FRESH

EXHAUST FAN SCHEDULE

UNIT CFM HORSEPOWER

MOTOR SIZE STATIC PRESSURE

LOSS (INCHES W.G.) LOCATION

FIRE ALARM SYSTEM.

HOOD. CONNECT THE FIRE SUPPRESSION SYSTEM TO THE

EXTINGUISHER CANNISTER IN CABINET ABOVE THE RANGE

FAN OFF IN EVENT OF FIRE. MOUNT CONTROLLER AND

CUTOFF SWITCH CONTROLLER TO SHUT STOVE AND EXHAUST

APPROVED EQUAL. PROVIDE 2 NOZZLES, ELECTRICAL

BE THE SENTRY 21 FIRE PROTECTION SYSTEM OR

FOR RANGE HOOD. FIRE SUPPRESSION SYSTEM SHALL

DUCT ADAPTER. PROVIDE FIRE SUPPRESSION SYSTEM

SINGLE PHASE, 60 HZ WITH TWO LIGHTS, 7-INCH

230 CFM RANGE HOOD, 2 SPEED FAN, 120 VOLTS,

ROOF I-BEAM

EXHAUST FANS TO AVOID

INSTALL ROOF MOUNTED

CEILING/ROOF I-BEAM

UNITS

WASHER/DRYER

COMBINATION

WASHER ON BOTTOM

DRYER ON TOP

EXHAUST PLAN

EF-8

ICE MACHINE

3 PHASE, 60 HZ.

EF-7 ARE ACTIVATED BY THE WALL MOUNTED SWITCHES. 48 X 18 MOTORS SHALL BE 208 VOLTS, -48 X 18 WALL LOUVERS SHALL BE OPERATED BY ELECTRIC MOTORS AND OPERATE WHEN EF-6 AND

SECURED TO THE BOTTOM OF THE EXHAUST FAN CABINET.

SHALL BE EQUIPPED WITH MOUNTING CABINET AND INTAKE GRILLE. INTAKE GRILLE SHALL BE HINGE

AND CURB ASSEMBLIES SHALL BE EXECUTED BY CERTIFIED METAL ROOF INSTALLERS. EXHAUST FAN

FOR THE UPBLAST CAP ASSEMBLIES. UPBLAST CAPS MUST BE MOUNTED LEVEL. ROOF PENETRATIONS

-EF-6 & EF-7 ARE CEILING MOUNTED WITH VERTICAL UPBLAST ROOF CAPS. PROVIDE ROOF CURBS

DAMPERS FOR LATRINES MUST BE CAPABLE OF OPENING AT THE LOWER CFM CAPACITY.

SHALL BE MUSHROOM STYLE FITTED WITH GRAVITY DAMPERS AND INSECT SCREENS. GRAVITY

-EF-1 THROUGH EF-5 AND EF-8 SHALL EXHAUST THROUGH THE SIDE OF THE BUILDING. WALL CAPS

-EXHAUST FANS EF-6 AND EF-7 ARE 208 VOLTS, 3 PHASE, 60 HZ.

-EXHAUST FANS EF-1 THROUGH EF-5 ARE 120 VOLTS, SINGLE PHASE, 60 HZ.

EF-8

EF-7

EF-6

EF-5

EF-4

EF-3

EF-2

EF-1

1/10

1/8

1/12

1/10

1/12

1/12

0.5

1.5

1.5

0.5

0.5

0.5

0.5

0.5

LAUNDRY

BAY

BAY

KITCHEN

TOILET

SHOWER

TOILET

SHOWER

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

SCALE: �" = 1’-0"

43105-P1

P1

DRAIN/WASTE/VENT

DRAIN/WASTE/VENT

TRENCH DRAIN

P-1A

P-1A

P-1

P-1 P-2 P-3A

P-3A

P-3 P-3

P-3

P-5

P-5

P-5

P-6

P-7

SEPARATOR

TO OIL/WATER

4" C.O.

2" C.O.

2" VTR

2" C.O.

4" C.O.

2" SCHEDULE 40 PVC DWV

S

C H

E D

U L

E

P V

C

W

V

P

V

3" FD

PIPE TO OIL/WATER SEPARATOR

CONNECTED TO TRENCH DRAIN

INTEGRAL CLEAN OUT IN P-TRAP

TO BACK BY 10 INCH DEEP,

20-INCH WIDE BY 20-INCH FRONT

SERVICE SINK, SINGLE BOWL

WITH LAYIN STAINLESS STEEL

STAINLESS STEEL WORK BENCH

TRENCH AS INDICATED.

AND 10" DEEP AT SHALLOW END. SLOPE

DRAIN TRENCH SHALL BE 9-INCHES WIDE

3" F.D

ABOVE CEIING

�" PVC DWV

DRAIN

1" CONDENSATE

3" FD

3" FD

2"

3"

3"

3" FD

4" VTR

4" C.O.

3" VENT

3" VTR

3"

3"

4"

3"3"

3" FD

3" FD 2"

3"

2" VENTS

2" VENTS

1"

WH

80 GAL

ELECTRIC

5’-0"

SLOPE = � INCHES PER FOOT

1. ALL DRAIN/WASTE/VENT PIPING SHALL BE SCHEDULE 40 PVC DWV, SOLVENT JOINT.

2. PROVIDE GALVANIZED STEEL FLASHING AT VENT PENETRATIONS THROUGH THE ROOF.

SYMBOL DESCRIPTION COLD HOT WASTE

PIPE CONNECTIONS (INCHES)

1/2

1/2

1/2

1/2

1/2

1/2

PLUMBING FIXTURE SCHEDULE

PIPING FROM LAUNDRY ROOM

DOES NOT CONNECT TO DRAIN

DRAIN LINE FROM LAVATORIES

COMMERCIAL WASHERS

3" DRAIN PIPE

AND DRAIN BOX

COLD/HOT WATER

RECESSED WASHER

FROM OIL/WATER SEPARATOR

SEE SITE PLAN FOR SEWER LATERAL

BY COLUMBUS WATER WORKS

NEW MANHOLE INSTALLED

P

V

END OF PIPE WITH 2-INCH PVC PIPE AND LABEL.

PERIMETER AND INSTALL TEMPORARY CAP. STUB

KITCHEN, AND LATRINES 5 FEET FROM BUILDING

TERMINATE SEWER LATERALS FROM LAUNDRY ROOM,PVC AND LABEL.

AND STUB END OF PIPE WITH 2-INCH

DRIVEWAY. INSTALL TEMPORARY CAP

CONTRACTOR TO OTHER SIDE OF

SHALL BE INSTALLED BY THE

FROM SEPARATOR TO MANHOLE TO

TO SEPARATOR. SEWER LATERAL

LENGHT OF PIPE FROM BUILDING

CONTRACTOR TO INSTALL FULL

TURNING POINT

FROM EDGE OF BUILDING TO

TO DETERMINE LENGHT OF PIPE

OF NEW OIL/WATER SEPARATOR

SEE SITE PLAN FOR LOCATION

WATER CLOSET AREAS SHALL BE FITTED WITH TRAP PRIMERS.

6. FLOOR DRAIN P-TRAPS IN THE MECHANICAL ROOM AND WATER

PIPE SIZES AND TRAP PRIMER LOCATIONS.

5. SEE RISER DIAGRAM ON SHEET P-4 FOR CLARIFICATION OF

4. PIPE THAT PENETRATES THE ROOF SHALL BE PAINTED TO MATCH THE ROOF COLOR.

BOLTS.

CAST BRONZE GRATE COVERS. ALL COVERS SHALL BE SECURED TO THE DRAIN BODIES WITH MACHINE

FLOOR DRAINS IN THE MECHANICAL ROOM AND BAY SHALL BE CAST BRONZE WITH HEAVY DUTY

3. FLOOR DRAINS SHALL BE CAST BRONZE BODY WITH CHROME PLATED COPPER GRATES IN THE LATRINES.

2" VENTS

2" VENT

EYE WASH

EMERGENCYEYE WASH

EMERGENCY

2" VENT

PLATE AND FRAME

STEEL COVER

WITH STAINLESS

PLUG IN WALL

2" CLEANOUT

P-8

P-7

P-6

P-5

P-4

P-3

P-3A

P-2

P-1

P-1A

EMERGENCY EYE WASH

KITCHEN SINK

MOP SINK

SHOWER

SERVICE SINK

LAVATORY

LAVATORY, HANDICAPPED

URINAL

WATER CLOSET

WATER CLOSET, HANDICAPPED

1/2

1/2

1/2

1/2

1/2

1/2

1/2

1/2

3/4

3/4

1-1/4

1-1/2

1-1/4

1-1/4

P-8

P-8

3"

3" VTR

P-4

THAN 5 FEET LONG.

COUNTERTOP. COUNTERTOP SHALL BE NO LESS

SPOUT, LEVER HANDLES, AND MOUNTED ON THE

BE 8-INCH CENTER SET TYPE WITH SWINGING

SHALL HAVE A SATIN POLISH FINISH. FAUCET SHALL

OUT IN TH EP-TRAP ASSEMBLY. STAINLESS STEEL

SPLASH. DRAIN SHALL BE 3-INCHES WITH A CLEAN

COMPLETE WITH STAINLESS STEEL LEGS AND BACK

TO THE COUNTERTOP. COUNTERTOP SHALL BE

9 INCHES DEEP. THE SINK SHALL BE INTEGRAL

BY 20 INCHES FRONT TO BACK, AND NO LESS THAN

SERVICE SINK SHALL MEASURE 24 INCHES WIDE

SERVICE SINK P-4 IN APPARATUS BAY

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

SCALE: �" = 1’-0"

43105-P2

P2

P-1A

P-1A

P-1

P-1 P-2 P-3A

P-3A

P-3 P-3

P-3 P-5

P-5

P-5

P-6

P-7

ICE MACHINE

WH

80 GAL

ELECTRIC

DOMESTIC WATER PLAN

DOMESTIC WATER PLAN

EIXSTING 8-INCH WATER MAIN

�" IN CEILING

�" IN CEILING

DOWN TO P-4

COLD WATER

�" HOT &

HYDRANT

DOWN TO WALL

�" COLD WATER

CLOSETS AND URINAL

CHASE FOR WATER

DOWN INTO PIPE

1" COLD WATER

SHOWER

WALL FOR

DOWN INTO

COLD WATER

�" HOT &

SHOWER

WALL FOR

DOWN INTO

COLD WATER

�" HOT &

FOR SHOWERS

DOWN INTO WALL

�" HOT WATER

�" COLD &

SINK

WALL FOR MOP

WATER DOWN INTO

�" COLD & HOT ABOVE CEILING

COLD WATER

�" HOT &

CEILING

WATER ABOVE

1 �" COLD

1"

TO LAVATORIES

WATER DOWN

�" COLD & HOT

KITCHEN SINK

WATER DOWN TO

�" COLD AND HOT

1"

VALVE BOXES

DOWN TO RECESSED

WATER CONNECTION

�" HOT & COLD

6. SEE RISER DIAGRAM ON P-5 FOR VERIFICATION OF PIPE SIZES AND VALVE LOCATIONS.

5. INSTALL PIPE SUPPORTS AS PER THE PLUMBING SPECIFICATION 22 00 00.

DEVICE IN THE BELOW GRADE VAULT.

BY COLUMBUS WATER WORKS. IF METER HAS BEEN INSTALLED, CONNECT THE SERVICE TO THE METER/BACKFLOW

END OF THE PIPE WITH A PVC PIPE AND LABEL IF THE WATER METER AND VAULT HAVE NOT BEEN INSTALLED

4. INSTALL SERVICE 5 FEET FROM BUILDING AND TERMINATE. INSTALL A TEMPORARY CAP AND STUB THE

RECOMMENDED BY THE INSULATION MANUFACTURER. DO NOT INSTALL INSULATION ON PIPE BELOW THE SLAB.

AND VALVES SHALL BE FACTORY MOLDED. ALL JOINTS AND SEAMS SHALL BE SEALED WITH ADHESIVE AS

3. ALL PIPE SHALL BE INSULATED UTILIZING FOAM RUBBER TUBE INSULATION. INSULATION FOR PIPE FITTINGS

2. PIPE BELOW THE SLAB IS TYPE L COPPER TUBE PIPING. NO JOINTS ALLOWED UNDER THE FLOOR.

1. ALL WATER PIPING SHOWN IS TYPE L COPPER, SWEAT JOINT ABOVE THE CONCRETE SLAB.

LAVATORIES

DRAIN LOCATED IN FRONT OF THE

IN THIS WALL FOR THE FLOOR

LOCATE THE PRIMER TRAP VALVE

OF LAVATORIES

FOR FLOOR DRAIN IN FRONT

IN WALL AT THIS LOCATION

LOCATE TRAP PRIMER VALVE

CEILING

WATER ABOVE

1 �" COLD

2 GALLON EXPANSION TANK

WATER WORKS.

GRADE VAULT INSTALLED BY COLUMBUS

AND BACKFLOW DEVICE IN BELOW

DOMESTIC WATER METER

G P

M

O

M E

S T

IC

A

T E

R

S

R V

IC

E

IN

S T

A L

L

B Y

L U

M B

U S

A

T

R

R K

S

HOT TAP REQUIRED

CAST IRON COVER

IRON VALVE BOX WITH

GATE VALVE IN CAST

AND LABEL THE PIPE AND TANK. THE TANK NUMBER SHALL BE

PAINT THE GAS TANK ALUMINUM. PAINT EXPOSED PIPING ALUMINUM

THE BOLLARDS.

EXTEND 2 INCHES ABOVE THE GRADE AND SLOPED AWAY FROM

PIPE TO A DEPTH OF 4 FEET. THE ANCHORING CONCRETE SHALL

GROUND WITH NO LESS THAN 6-INCHES CONCRETE AROUND THE

PIPE FILLED WITH 3000 PSI CONCRETE AND ANCHOR IN THE

HIGHWAY REFLECTIVE PAINT. BOLLARDS SHALL BE 6-INCH STEEL

CORNER OF THE TANK. BOLLARDS SHALL BE PAINTED WITH

LOCATION. PROVIDE 4 PROTECTIVE BOLLARDS, ONE AT EACH

STRUCTURES. SEE UTILITY SITE PLAN FOR LP GAS TANK

BE MOUNTED NO LESS THAN 50 FEET FROM OCCUPIED

FORCE PROTECTION REGULATIONS REQUIRE THE LP TANK TO

BE AS PER THE APPROVED GENERATOR SPECIFICATIONS.

UTILIZING CATHODIC PROTECTION AS SPECIFIED. PIPE SIZE SHALL

SPECIFICATIONS. PIPING BELOW GRADE SHALL BE PROTECTED

NEW CONCRETE PAD AS PER THE GAS TANK’S MANUFACTURER’S

CUTOFF VALVES AT THE TANK AND GENERATOR. INSTALL

PIPING FROM TANK TO THE GENERATOR. PROVIDE GAS

STEEL LIQUID PETROLEUM GAS TANK, REGULATOR, AND

CONTRACTOR TO FURNISH AND INSTALL NEW GALVANIZED

INFORMATION TO 60 KW GENERATOR.

SEE UTILITY SITE AND ELECTRICAL PLANS FOR GAS SERVICE

ICE MACHINE

1/2 " CW TO

TO LAVATORIES

COLD WATER DOWN

1/2 " HOT AND 3/4 "

MECHANICAL ROOM

ACCESS PANEL IN

IN WALL. INSTALL

PRIMER VALVE

�" TO TRAP

P-4

P-8

P-8

DOWN TO P-4

COLD WATER

�" HOT &

TO P-8

WATER DOWN

1/2 " COLD

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

SCALE: �" = 1’-0"

43105-P3

P3

P-1A

P-1A

P-1

P-1 P-2 P-3A

P-3A

P-3 P-3

P-3 P-5

P-5

P-5

P-4

P-6

P-7

ICE MACHINE

WH

80 GAL

ELECTRIC

PNEUMATIC AIR SYSTEM

AIR COMPRESSOR SYSTEM

PIPE CONNECTION TO REELS.

REGULATOR WITH FILTER AT EACH

AIR HOSE. PROVIDE PRESSURE

PSI RATED RUBBER PNEUMATIC

COIL ACTION. 50 FEET OF 150

REEL, SPRING QUICK REALEASE

CEILING MOUNTED PNEUMATIC HOSE

TYPICAL FOR 5 LOCATIONS IN BAY

1 �"

1 �"

1"

1 �"

HOSE REEL HOSE REEL

HOSE REEL

HOSE REEL

OF AIR COMPRESSOR.

RATED FOR OPERATING PRESSURE

ASSEMBLY, AND BALL VALVE

PRESSURE REGULATOR/AIR FILTER

TERMINATE PIPE WITH COMBINATION

DOWN TO WORK BENCH.

�" BLACK STEEL PIPE

COMPRESSOR

AT PIPE CONNECTION TO AIR

SPACE. PROVIDE BALL VALVE

RISER PIPE UP TO CEILING

1 �" INCH BLACK STEEL

LENGHTS SHALL BE 50 FEET LONG AND RATED FOR OPERATING PRESSURE OF AIR COMPRESSOR.

SHALL BE MOUNTED ON THE WALLS. ALL MOUNTS TO BE FURNISHED BY THE REEL MANUFACTURER. HOSE

SHALL BE ANCHORED TO THE ROOF STRUCTURAL STEEL. REELS INSTALLED ALONG THE PERIMETER WALLS

5. INSTALL QUICK RELEASE PNEUMATIC HOSE REELS AT LOACTIONS SHOWN. REELS INSTALLED IN THE CEILING

4. INSTALL BALL VALVES, AIR RELIEF VALVES, FILTERS, AND REGULATORS AT THE WORK STATIONS.

3. INSTALL PIPE SUPPORTS AS PER THE PLUMBING SPECIFICATION 22 00 00.

2. ALL PIPE SHALL BE PAINTED GREEN AND LABELED "PNEUMATIC AIR - 125 PSI"

1. ALL AIR PIPING SHOWN IS STANARDARD WEIGHT BLACK STEEL.

PIPE DISCHARGE OF COMPRESSURE.

REGULATOR AND FILTER AT

PROVIDE COMBINATION PRESSURE

REDUCED TO 125 PSI

OPERATING PRESSURE OF SYSTEM

PRESSURE IS 200 PSI

COMPRESSOR MAXIMUM OPERATING

PAD.

ON 4 INCH HIGH CONCRETE

STANDING. MOUNT ASSEMBLY

TANK SIZE, VERTICAL

TWO STAGE, 80 GALLON

3 PHASE, 208 VOLTS,

5 HP AIR COMPRESSOR,

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO: FPXXXXXXP

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

43105-P4

P4

WASHER WASHER

P-4

3"VTR

3"

3"

3"

2"4"

3"

P-3A

P-3

IN WALL

3" C.O.

3"

2" VENT

3" F.D.

P-1

P-2 P-1

P-1A

2" SD

P-1A

2" SD

2" SD

3" FD

3" FD

IN WALL

2" C.O.

2" VENT

P-3

P-3

P-3A

2" C.O.

2" C.O.

P-7

2" VTR

2" C.O.2" C.O.

2"

2"

1 �"

4" VTR

2" VENT

2" VENT

2"

1 �"

1 �"

2" VENT

2" VENT

3"

3"

3"

2"

2"

4"

4"

3"

2"

3"

4"

IN WALL

4" C.O.

3"

3"

3"

PRIMER

WITH TRAP

3" F.D.

PRIMER

WITH TRAP

3" F.D.

3"

DRAIN/WASTE/VENT PLAN

NO SCALE

INSTALLED BY COLUMBUS WATER WORKS

BOOT.

METAL BOOTS TO HAVE RUBBER GASKET TO SEAL VENT PIPE THROUGH THE

PROVIDE GALVANIZED STEEL FLASHING AND PIPE BOOT AT ROOF PENETRATIONS.

COVER AND FRAME ASSEMBLY SECURED IN PROTECTIVE CONCRETE PAD.

CONCRETE PAD, 4 INCHES THICK. CONCEAL CLEANOUT WITH CAST IRON

ALL CLEAN OUTS IN GRADE SHALL BE PROTECTED BY 12-INCH DIAMETER

STEEL COVER AND FRAME ASSEBLY.

ALL CLEAN OUTS IN WALLS TO BECONCEALED IN WALLS BY STAINLESS

SOLVENT JOINT.

ALL DRAIN/WASTE/VENT PIPING SHALL BE SCHEDULE 40 PVC DWV

DRAIN/WASTE/VENT RISER DIAGRAM

3" C.O.

3"

MANHOLE

WORKS

BY COLUMBUS WATER

SEPARATOR. INSTALLED

FROM OIL/WATER

3" F.D.

PRIMER

TRAP

WITH

3" FD

NOT GLUE CAP. STUB END OF PIPE WITH 2" PVC PIPE AND LABEL.

AND CONSTRUCTION DEBRIS PRIOR TO INSTALLING CAP. DO

INSTALL TEMPORARY CAP ON END OF PIPE. REMOVE DIRT

INSTALLED BY COLUMBUS WATER WORKS.

BUILDING EXTERIOR WALL. REMAINING PIPING TO BE

THE SEWER LATERAL SHALL STOP 5 FEET FROM THE

OIL/WATER SEPARATOROIL/WATER SEPARATOR

TRENCH DRAIN

P-8P-8

2" C.O.

2" VENT

2" VTR

2"

2"

2"2"

1-1/4"

4"

2"

ON P-TRAP

3" C.O.

P-4

P-8

PUBLIC WORKS

B Y

D A

T E

R E

V

IS

IO

N S

S Y

M B

O L

DRAWN BY

APPROVED

DRAWING NUMBER SCALE

NOTED

DATE

L&E NO:

CONSTRUCT FIRE STATION IN

EXISTING CTA, SAND HILL

FORT BENNING, GEORGIA

21 JAN 11

BONAIR

SAYLOR

43105-P5

P5

NO SCALE

DOMESTIC WATER REISER DIAGRAM

DOMESTIC WATER RISER DIAGRAM

THRU FLOOR

FROM METER

1 �" COPPER

�" HOSE BIB

WALL HRYDRANT

�" 1"

1 �"

P-1

P-1

P-1A

P-1A

P-2

1"

1"

P-5

P-5

P-5

P-4

HEATER

ELECTRIC WATER

80 GALLON

1 �"

P-7

P-3

P-3

P-3A

P-3A

P-3

MAKER

ICE

FOR PIPE FITTINGS AND VALVES SHALL BE FACTORY PREMOLDED.

ALL PIPE ABOVE THE FLOOR SHALL BE INSULATED WITH FOAM RUBBER INSULATION. FOAM INSULATION

ALL PIPING BELOW THE FLOOR IS SOFT DRAWN TYPE L COPPER TUBE.

ALL DOMESTIC WATER PIPE SHOWN IS TYPE L COPPER SWEAT JOINT ABOVE THE FLOOR.

PIPE.

WHERE 1 �" COPPER SERVICE PENETRATES FLOOR SHALL BE SLEEVE WITH SCHEDULE 40 PVC

ET

ET EXPANSION TANK

HOT WATER PIPE

COLD WATER PIPE

FPXXXXXXP

TRAP PRIMER

FLOOR TRAP

1/2 " CW TO

PRIMER

FLOOR DRAIN TRAP

WATER PIPE TO

ROUTE 1/2" COLD

VALVE IN WALL

TRAP PRIMER

PRIMER VALVE

�" PIPE FROM TRAP

P-8

P-8

P-4

43105fp1
43105m1
43105m2
43105p1
43105p2
43105p3
43105p4
43105p5

File details come from the government source that posted it. Updated .