W911SD24R0150 -0003 Amend_QASP-PWS _extend 8 14 24 _Solicitation Ski Slope Maint DPW FY24.pdf
PDF 428 KB Posted
- Solicitation number
- W911SD24R0150
About this file
This document is an amendment to a solicitation (W911SD24R0150) for the yearly preventative maintenance, inspection, and certification of the triple chairlift and handle tow at the Victor Constant Ski Slope located at the United States Military Academy in West Point, New York.
The key details are:
- The solicitation is being amended to update the Performance Requirements Summary section of the Performance Work Statement (PWS).
- The contractor shall provide all services, materials, supervision, and labor to perform the required maintenance, with the exception of government-furnished items.
- The maintenance services are required annually from April 1 to September 30, with emergency services available throughout the year.
- The contract will be a base year plus four option years.
- A site visit is scheduled for August 5, 2024 at 10 AM.
- The performance period is from August 15, 2024 to August 14, 2029.
- The agency issuing the solicitation is the Department of the Army Materiel Command Mission and Installation Contracting Command Fort Eustis.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SD24R0150
0012141551
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The perpose of the Amendment is to update the Performance Requirement Summary section of the PWS.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911SD24R0150
X 9B. DATED (SEE ITEM 11)
25-Jul-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2024
CODE
MICC - WEST POINT
681 ROGERS PLACE
WEST POINT NY 10996-1514
W911SD 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
PWS
PWS
Ski Lift Maintenance and Certification
JAN 17, 2024
Table of Contents
1.0 GENERAL INFORMATION
1.1 Overview
1.2 Components
1.3 Work Management and Control
2.0 DESCRIPTION OF SERVICES
2.1 Hours of Operation 1
2.2 Specific Tasks 2
2.3 Deficiencies 2
2.4 Wire Rope Certification and Inspection 2
2.5 Emergencies
3.0 Work to be Performed 2
3.1 Dynamic Testing of Triple Chairlift 3
1.0 General Information.
1.1 Overview: The contractor shall provide all trade certifications, expertise, services, materials, supplies, supervision, labor, except where specified as Government furnished to perform necessary yearly preventative maintenance on the handle tow, ski chair lift, inspection and certification for all wire ropes on the chair lift and handle tow at the Victor Constant Ski Slope West Point, NY 10996, in accordance with (IAW) applicable laws, rules, regulations, codes and guidelines at the United States Military Academy (USMA), West Point, NY 10996.
1.2 Components: The Contractor shall perform preventive maintenance (PM) and repairs. Facilities and components covered under this Performance Work Statement (PWS) include, but are not limited to, the following:
a. Victor Constant Ski Slope
1.3 Work Management and Control.
1.3.1 Reporting Requirements: The Contractor shall prepare and maintain all maintenance records, files, and reports and send copy to designated COR.
1.3.2 Publications and Forms: Borvig Instruction manual, current ANSI Standard B77.1, for the handle tow - Multi Ski lift manufacturer’s specifications and NYS Industrial Code Rule 32. All work shall comply with the requirements of the Engineer Safety Manual EM 385-1-1, OSHA 29 CFR 1926 Construction, and OSHA 29 CFR 1910.
2.0 Description of Services. The contractor shall provide all trade certifications, expertise, services, materials, supplies, supervision, labor, except where specified as Government furnished to perform necessary yearly, preventative maintenance on the handle tow, ski chair lift, inspection and certification for all wire ropes on the chair lift and handle tow at the Victor Constant Ski Slope West Point, NY 10996, in accordance with (IAW) applicable laws, rules, regulations, codes and guidelines at the United States Military Academy (USMA), West Point, NY 10996.
2.1 Hours of Operation: The Contractor Shall Perform Services during the normal work hours of 8:00AM – 4:30 PM Monday Thru Friday (Excluding Federal Holidays). No other work hours will be permitted unless requested in writing and approved by the Contracting Officer.
Contractor shall coordinate the date and time of the maintenance with CCSB office Bldg.
667A 4th floor.
2.2 Specific Tasks: The intent of this service contract is the complete inspection, certification, and maintenance to ensure trouble free and safe operation of the Multi Ski lift Handle Tow and the Borvig Triple Chair Lift located at the Victor Constant Ski Slope.
Reference is specifically made to the Borvig instruction manual, 1983 edition and for the handle tow lift references are specifically made to the Multi Ski lift manufacturer’s Quality Management requirements for construction, operation, handling, and maintenance of Multi Lifts.
All work to be accomplished 01 April - 30 Sept of any calendar year and provide emergency service throughout the year.
2.3 Deficiencies: Contractor shall notify COR immediately upon finding any deficiencies that are not directed to be repaired within these specifications. The Contractor shall provide a written report of any deficiencies noted during inspections.
The report shall include a detailed cost estimate to include parts, labor and materials of what repairs are required and should be submitted to the COR within 24 hours of identification of deficiencies. COR will then determine the proper course of action with the Mission Installation Contracting Command (MICC). The contractor shall submit a written report, to the COR documenting all work performed on the components of the chair lift and handle tow.
The contractor shall identify all deficiencies found, corrective measures taken, replacement parts required, quantities and quality of lubricants utilized. Same shall be submitted within 30 days upon completion of services.
Contractor shall insure triple chair lift and handle tow to be in full and safe working order.
2.4 Wire Rope Inspection and Certification: Inspection and certification of all wire ropes specified in the performance section shall be performed by an experienced wire rope inspector.
The Contractor shall perform the wire rope inspection in accordance with the ANSI B77.1 standard. See page 155. Section 7.4.1. WIRE ROPE in the ANSI B77.1-1999 Standard for a description of the qualifications and procedures to follow as required for proper wire rope inspecting.
2.5 Emergencies: The contractor shall respond to emergency services as and when called for by the (COR) or (KO) and within 24 hrs. of notification by same.
3.0 WORK TO BE PERFORMED:
STRUCTURES:
Check for cracks in welds and general appearance that may indicate deterioration of the structural integrity of each.
Prep, spot prime and fully paint towers as per statement, or as directed by the KO or
COR;
a. Tower #'s 6, 7, 8 & 9, during the base year.
b. Tower #’s 1,2,3,4 & 5 during the 1st opt year.
Prep, spot prime and spot paint all other structures.
Paint shall be oil base and color shall remain the same.
Check and ensure all brittle bars are adequate and all connections are sound.
GEAR BOX
Check for water accumulation and ensure oil level is adequate.
SERVICE BRAKE
1. Change hydraulic fluid.
2. Clean and grease piston rod
3. Inspect pads and replace if necessary.
4. Ensure shoe to drum gap is within tolerances.
5. Ensure brake functions as designed.
6. Check, adjust, if necessary, that stopping distances are within acceptable standards.
Torque test to 103 ft./lbs. at the APU shaft.
Correct deficiencies as required.
EMERGENCY BRAKE
Remove, clean, check for rust, lubricate with grease and reassemble conical springs.
Inspect pads, replace, if necessary, check gap and adjust as required.
Ensure bull-wheel rim and brake lining is clean.
Ensure hydraulic cylinders and lines are in good operating condition, hydraulic fluid is adequate.
Torque test to 108 ft. lbs. and ensure emergency brake functions as designed.
Inspect bull-wheel welds and liner.
Correct deficiencies as required.
BACKSTOP
Lubricate dog bearing and under-speed switch.
Clean linkages, dog and area between dog and housing.
Clean, inspect and replace, if necessary, the under-speed switch wheel.
REVERSION TERMINAL
Check and lubricate bearing.
Inspect rubber liner, structure and bull-wheel welds.
COUNTERWEIGHT (see also para-K) Clean wire rope of all old grease and apply new light grease.
Grease all sheaves.
Ensure counterweight is positioned correctly.
HAUL ROPE (see also para-K) Clean and lubricate with industrial castor oil.
CHAIRS
Lubricate pivot points at grips.
Inspect welds for cracks and re-weld as necessary.
Check all nuts and bolts for wear and tightness.
Move grips backward on haul rope approximately 24" and mark with spray paint. In this movement, ensure all chairs are equally spaced over the entire length of the haul rope.
Test all grips for slippage to the required torque of 240 ft lbs.
Perform inspection and magnetic particle testing on ten grips as identified by the COR.
Contractor shall provide written certification attesting to the safety and condition of the grips. If a grip fails this inspection and testing, contractor shall provide a written report documenting the reason for the chair grip failure to the COR within three working days.
Grip or grips shall be given to the COR for further evaluation and replacement procedures.
Replace chair slats as required. Prime and paint same to match existing.
Prep and paint a total of 30 continuous chairs in their entirety. Record chair numbers for inclusion in final report. Protect chair numbers from paint or replace in kind.
NOTE: Disassembly of all chair grips are to be done every odd calendar year.
LINE SHEAVES
Ensure all bearings are adequately lubricated.
Insure tightness of all bolts. Visually check all sheaves, replace six (6) liners as required
* and ensure all line sheaves are correctly aligned with the haul rope.
* If additional liners need to be replaced contact Contract Monitor (COR).
WIRE ROPE INSPECTION AND CERTIFICATION
Perform a complete and detailed inspection of the counterweight and haul ropes of the chair lift and the handle tow to ensure these wire ropes are safe for their intended use.
Inspect and certify the chair lift and handle tow haul rope, paying particular attention to the splices.
Inspect and certify the counterweight rope paying particular attention to its’ end connections.
Report shall be included in the total PM report on a form applicable to satisfy the requirements of ANSI B77.1 for Aerial Passenger Tramways and signed by the qualified wire rope inspector.
LOW VOLTAGE SAFETY CONTROL SYSTEM
System check, by competent electrician for low voltage control systems on aerial chair lifts, to entire safety control circuitry. Repair, adjust or replace components as required.
Install additional lift start control operator into the existing electrical control box on the exterior of bottom lift house. One time requirement to allow lift operator to be in contact with patrons upon a restart.
Provide and maintain a minimum of 4 replacement brittle bars as spares and stored in bottom lift house.
HANDLE TOW MAINTENANCE
Check and service both upper and lower drive stations to include the electric motor, check and grease bearings. Check all remaining mechanical components. Inspect the status and ensure the quality of the gear oil (replace if necessary). The wheel hub bearings and the non-return device at the return station are to be checked and to be lubricated with bearing grease.
Inspect the foundations and anchorages for their proper condition.
Inspect the proper condition of the entire electrical system and its earthing. Inspect all stop switches and safety gates and safety mechanisms. Insure all operate properly.
All screws of the lift construction are to be checked for their firm fit and to be retightened if necessary.
The steel wire rope is to be inspected at the whole length for wire break, intense corrosion, and distortion. The inspection result is to be documented and submitted to the COR or the KO.
3.1 Dynamic Testing to the chairlift is required.
Work procedures shall be performed in accordance with (IAW) OSHA 29 CFR 1926, EM 385- 1-1, ANSI B77.1. All work shall be performed without any facility and/or property damage.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Tasks)
Performance
Standards
Acceptable Quality Levels
Methods of Surveillance
Incentive (Positive and/or
Negative) (Impact on Contractor Payments)
EXAMPLES:
Perform the Ski Lift Maintenance as per PWS in completed.
Perform Emergency repairs.
Submit inspection and maintenance report by December .
Perform dynamic test-ing base year
Lift will be ready for use by Dec 1st each year.
Contractor to reply within 2hrs of notification and have personnel onsite within 3 hrs.
when needed.
Final inspection report received
Contractor will ensure lift can handle weight
100%
Periodic
100% Inspection
N/A
NA
(End of Summary of Changes)