W911SA25QA078 Attachment 16 - Annex A (PWS) Waste Pumping.docx

DOCX document 130 KB Posted

Attached to
Waste Pumping & Disposal Services at Garrison - Fort McCoy, WI
Solicitation number
W911SA25QA078
Issued by

About this file

This file is a Performance Work Statement (PWS) for waste pumping and disposal services at Fort McCoy, Wisconsin. The PWS outlines requirements for a non-personal services contract covering wastewater treatment plant liquid and dry cake sludge removal, cooking oil container and grease interceptor maintenance, WWTP grease and debris removal, vault toilet servicing, septic tank pumping, and oil water separator servicing. The contractor must provide all management, personnel, equipment, supplies, permits, licenses, fees, facilities, transportation, tools, materials, and supervision.

Key requirements include responding to emergencies within 4 hours, maintaining specific pumping levels for different types of waste (e.g., sludge pumped to no greater than 18" above tank base for WWTP, 6" for grit chambers, 1" for grease interceptors), providing confined space certified personnel, following environmental and safety regulations, and maintaining proper licensing and insurance. The contractor must operate during normal hours of 0700-1600 but be available for after-hours emergency response. The contract will have a 12-month base period with four 12-month options and a possible 6-month extension. The PWS includes detailed quality assurance surveillance plans and performance standards that will be used to evaluate contractor performance through customer complaints and inspections.

View the file

Other files

File Type Posted
W911SA25QA078 Amendment 0001 (f) 3-10-25.pdf PDF
W911SA25QA078 Attachment 03 - Waste Pumping Historical Data.xlsx XLSX spreadsheet
W911SA25QA078 Attachment 06 - Vault Latrines and Septic Workload.docx DOCX document
W911SA25QA078 Attachment 10 - Oil Water Separator Service Location Map.docx DOCX document
W911SA25QA078 Attachment 07 - South Post Latrines and Septic Tank Location Map.pdf PDF
W911SA25QA078 Attachment 02 - AT OPSEC.pdf PDF
W911SA25QA078 Attachment 09 - Cantonment Area Latrines and Septic Tank Location Map.pdf PDF
W911SA25QA078 Attachment 15 - Grease Interceptor WVO Sediment Tank Location Map.pdf PDF
W911SA25QA078 Attachment 13 - Grease Interceptor Drawing.docx DOCX document
W911SA25QA078 Attachment 14 - Fort McCoy Sewage Gray Water Dump Station Location Map.docx DOCX document
W911SA25QA078 Solicitation (f) 2-26-25.pdf PDF
W911SA25QA078 Attachment 08 - North Post Latrines and Septic Tank Location Map.pdf PDF
W911SA25QA078 Attachment 05 - WWTP Grease and Debris Lift Station Sediment Tank Workload.docx DOCX document
W911SA25QA078 Attachment 11 - OWS Collection Station Schedule Workload Estimate.docx DOCX document
W911SA25QA078 Attachment 12 - OWS Tank Technical Data.docx DOCX document
W911SA25QA078 Attachment 04 - WWTP Dry Cake - Sludge Workload.docx DOCX document
W911SA25QA078 Attachment 01 - Price Schedule - CUI.xlsx XLSX spreadsheet
W911SA25QA078 Attachment 17 - Annex B (PWS) Waste Pumping.docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS)

Waste Pumping and Disposal

ANNEX (A)

(5-April-2024)

Table of Contents

1.0 Introduction

1.1Background
1.2Objectives
1.3Climatic Conditions
1.4Facility Access
2.0Requirements

2.1 Description of Services

2.2 Work Management

2.3 Special Requirements

2.4 Security Training

2.5 Training, Physical Requirements, or other Expertise Required

2.6 Quality Assurance (QA)/Inspection Support

3.0 Performance Requirements and Standards

3.1 High Level Objectives (HLO)

4.0 Performance Requirements Summary (PRS) Matrix

4.1 Quality Assurance

5.0 DELIVERABLES

6.0Reserved
7.0Definitions
7.1Acronyms
7.2Applicable Directives, Publications

7.3 Reserved

7.4 Government-Furnished Material (GFM)/Property (GFP)/Equipment (GFE)

7.5 Contractor-Furnished Material (CFM)/Property (CFP)/Equipment (CFE)

7.6 U.S. Department of Labor (DOL) Wage Determination (WD).

1.0 Introduction. This is a non-personal services contract to provide Waste Pumping and Disposal services to Fort McCoy, Wisconsin in accordance with the work schedule and specifications contained herein. The Contractor shall provide all management, personnel, equipment, supplies, permits, licenses, fees (to include disposal, treatment, tipping, etc.) facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Performance Work Statement (PWS). The Contractor is not responsible for the removal of Biohazard, HAZMAT, UXO, and other waste materials not specifically mentioned. The Government will not exercise any supervision or control over the contract service providers. The Contractor shall perform to the standards specified in this PWS. Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Contractor’s work and responsibility shall include, but is not limited to, Wastewater Treatment Plant (WWTP) liquid and dry cake sludge removal, service and maintain cooking oil containers and grease interceptors, WWTP grease and debris removal, service vault toilets, septic tanks and oil water separator pumping and servicing, all job planning, programming, scheduling, administration, inspection, and management necessary to accomplish the required specified services at Fort McCoy, Wisconsin.

Background. Fort McCoy is situated on approximately 60,000 acres in the Coulee Region of West Central Wisconsin. Fort McCoy is located on HWY 21 between Tomah and Sparta. The population base consists of approximately 3000 military, Government civilian, and Contactor personnel, as well as resident family members. Fort McCoy’s primary mission is to underpin readiness of force by serving as a training center and support site for power projection missions. As a Total Force Training Center, Fort McCoy’s primary responsibility is providing quality training facilities for military forces, which require the periodic removal and disposal of various waste types.

Objectives. The Contractor shall ensure all work accomplished in the performance of this PWS meets all applicable Federal, State, and local laws, regulations, and directives to include, but not limited to, the written directives issued by the Contracting Officer (KO) or their authorized representative, and the publications in paragraph 7.2, Related Documents. The Contractor shall maintain the proper operation of the Wastewater Treatment Plant, Dining Facilities, septic tanks, and Oil Water Separators. The PWS is written to define “what” is required and leaves the decision on “how” to perform the work up to the Contractor. The intent is to establish work requirements that are performance-based and results-oriented. The Contractor shall determine the best and most cost-effective ways to fulfill Waste Pumping and Disposal and their component needs, emphasizing innovation and commercial best practices. Unless law or regulation specifically requires a particular process, the Contractor is free to determine “how” to do the work, subject to the overall expectation that the Contractor will use the most cost-effective methods appropriate to satisfy the Installation needs. The nature of this work requires the Contractor to use flexible employment and scheduling techniques to minimize cost and maximize performance outcomes, and to adapt to varying workload requirements. This may require work outside normal duty hours, including 24-hour operations and shift work to meet mission requirements. The Contractor shall perform to the standards within this contract, compile historical data, prepare required reports, and submit all information as specified by the Deliverables presented in the contract. The Contractor shall ensure all work in support of mission requirements tendered to the Government for acceptance conform to the measurable performance standards of quality, timeliness, and quantity specified in the Performance Requirements Summary (PRS) of this contract.

1.2.1 Type of Contract. The Government will award a Firm Fixed Price service contract. The quantity shown per Contract Line-Item Number (CLIN) is an estimate that shall not to be exceeded without prior approval in the form of a contract modification from the Contracting Officer (KO). It is the intent of the contract to be able to order any quantity, as necessary, up to the awarded amount to the base period or option period CLIN. The estimated quantities shown per CLIN is not guaranteed and may vary depending on actual need; and any unused quantities may be removed by contract modification at the end of the date range covered by the CLINs. The Government may order any quantity of items on a CLIN, until the respective contract period of performance CLIN dollar amount is maxed out. The Government pays only for the actual quantities ordered and received. The contractor shall not provide services exceeding the funded value of the CLINs.

Climatic Conditions. Ft McCoy is in Monroe County WI which is in the Upper Mississippi River Valley of the Midwest with relatively hilly terrain and bluffs. The area experiences a temperate climate with both warm and cold season extremes. Winter months can bring occasional heavy snows, intermittent freezing precipitation or ice, and prolonged periods of cloudiness. While true blizzards are rare, winter storms impact the area on average about 3 to 4 times per season. Occasional arctic outbreaks bring extreme cold and dangerous wind chills. Temperatures between river valleys and surrounding ridges can vary greatly. Typically, high temperatures on ridges are 3° to 5°F colder than valleys. This can lead to slightly more average snowfall on ridge tops and occasionally a difference in winter precipitation types from ridge to valley. Temperatures in lowlands, or bogs, are often 10 to 15 degrees colder at night and can even freeze in summer. Thunderstorms occur on average 30 to 50 times a year, mainly in the spring and summer months. The strongest storms can produce associated severe weather like tornadoes, large hail, or damaging wind. Heat and high humidity are occasionally observed in June, July, or August. The autumn season usually has the quietest weather. Valley fog is most common in the late summer and early fall months. On calm nights, colder air settles into valleys leading to colder low temperatures compared to ridge top locations.

Below are basic climatology figures for the Monroe County area. Data is valid for Ft McCoy, WI based on a 30-year period (1981-2010).

Month Normal Maximum Temperature Normal Minimum Temperature Average Temperature

Precipitation

Snowfall

JAN
25.8
6.1
15.9
0.61”
10.4”
FEB
31.6
11.1
21.3
0.80”
7.6”
MAR
43.2
22.7
32.9
1.57”
5.8”
APR
57.9
34.5
46.2
3.32”
1.9”
MAY
69.4
45.5
57.4
4.32”
0.0”
JUN
79.0
55.6
67.3
4.69”
0.0”
JUL
83.1
60.1
71.6
4.43”
0.0”
AUG
81.1
58.1
69.6
4.41”
0.0”
SEP
72.8
48.8
60.8
3.87”
0.0”
OCT
59.9
36.5
48.3
2.30”
0.2”
NOV
44.0
25.7
34.8
2.21”
3.4”
DEC
29.7
11.2
20.5
1.03”
9.7”
Year
56.3
34.9
45.6
32.86”
40.1”

1.4 Facility Access.

1.4.1 Access and General Protection/Security Policy and Procedures. "The contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. The contractor and all associated subcontractors’ employees shall also comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III), Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), the Real ID Act of 2005 and applicable installation, facility, and area commander installation/facility access and local security policies and procedures (provided by government representative). In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The Government may require monthly participation in the Installation Random Antiterrorism Program."

The contractor shall also provide all information required on the Fort McCoy form 451 and 452 for background checks to meet installation access requirements (SEE Below) to be accomplished by installation Director of Emergency Services Physical Security Division. Contractor personnel performing work under this contract shall submit to a NCIC-III Criminal History Check before access will be granted to Fort McCoy. Once the individual has cleared the criminal history, they will be issued an Installation Access Card (IAC). An un-favorable NCIC-III Criminal History Check will result in the contractor being denied access to the installation and a waiver request must be approved prior to gaining access. For waiver approval process coordinate with the installation physical security office.

The Government Contracting Officers Representative will provide the PDF document FMF 451 and 452 for installation background checks to the contractor upon award. Contractors must process all Fort McCoy forms 451 and 452 through their government sponsor (this is usually the COR).

Information required for Criminal History Check

• Full Name, Including middle name(s)

• Sex

• Date of Birth

• Driver’s License information

• Issuing State

• Beginning and End date

• Access Hours

• Work location

• Company Name

• Position (i.e., Construction)

1.4.1.1 COR notifies Contractor POC that personnel have been vetted and cleared for unescorted access to Fort McCoy cantonment area.

1.4.1.2 If derogatory information is contained in the background check, unescorted access may be denied in accordance with Army Directive 2014-05 (Policy Implementation Procedures for Common Access Card Credentialing and Installation Access for Uncleared Contractors).

· COR will notify DES of individuals who have been denied access.

· DES will complete Access Denial Letter and forward to COR along with Access Control Denial Waiver Package.

· COR provides Access Denial Letter and Access Control Denial Waiver Package to Contractor POC.

1.4.1.3 In cases where an uncleared Contractor employee, including any subcontractor employee, is denied access based on derogatory information, the individual may request a waiver.

· Contractor POC informs COR that employee desires to submit an Access Control Waiver Denial Application.

· COR will forward the individual’s completed packet to DES for review.

· DES will review members' Access Control Denial Waiver Application in consultation with Fort McCoy Access Control NCIC-III POC.

· DES provides recommendation to Senior Leadership.

· Senior Leadership or designee makes final fitness determination.

· DES will notify COR of final fitness determination.

· If waiver is granted, DES will provide Access Approval Letter to COR. COR will then provide copy of Access Approval Letter to Contractor POC, for facility access and retain copy for COR files.

1.4.1.4 Individuals may be denied unescorted access if derogatory information includes, but is not limited to, the following:

· The NCIC-III contains criminal information about the individual that causes the Senior Commander to determine that the individual presents a potential threat to the good order, discipline, or health and safety of the installation.

· The installation is unable to verify the individual's claimed identity based on the reasonable belief that the individual has submitted fraudulent information concerning his or her identity in the attempt to gain access. The individual has a current arrest warrant in NCIC, regardless of the offense or violation. The individual is currently barred from entry or access to a federal installation or facility. The individual has been convicted of crimes encompassing sexual assault, armed robbery, rape, child molestation, production or possession of child pornography, trafficking in humans, drug possession with intent to sell or drug distribution.

· The individual has a U.S. conviction of espionage, sabotage, treason, terrorism, or murder.

· The individual is a registered sex offender.

· The individual has been convicted of a felony within the past 10 years, regardless of the offense or violation.

· The individual has been convicted of a felony firearms or explosives violation.

· The individual has engaged in acts or activities designed to overthrow the U.S. Government by force.

· The individual is identified in the Terrorist Screening Data Base (TSDB) as known to be suspected of being a terrorist or belonging to an organization with known links to terrorism or support of terrorist activity. When this capability becomes available to DoD, security personnel performing installation access control personnel will strictly follow the Federal Bureaus on Investigation’s published engagement protocols.

For more information, please contact the Installation Physical Security Section at 608-388-8445/2010/4694 or 3794.

2.0 Requirements.

2.1 Description of Services. The Contractor shall provide all management, personnel, equipment, supplies, permits, licenses, fees (to include disposal, treatment, tipping, etc..) facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary as defined in this Performance Work Statement (PWS). The Contractor is not responsible for the removal of Biohazard, HAZMAT, UXO, and other waste materials not specifically mentioned. The Government will not exercise any supervision or control over the contract service providers . The Contractor shall perform to the standards specified in this PWS. Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. Contractor’s work and responsibility shall include, but is not limited to, Wastewater Treatment Plant (WWTP) liquid and dry cake sludge removal, service and maintain cooking oil containers and grease interceptors, WWTP grease and debris removal, service vault toilets, septic tanks and oil water separator pumping and servicing, all job planning, programming, scheduling, administration, inspection, and management necessary to accomplish the required specified services at Fort McCoy, Wisconsin.

2.1.1 Non-Personal Services. The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non-personal service contracts are authorized by the Government in accordance with (IAW) Federal Acquisition Regulation (FAR) Subpart 37.104, under general contracting authority, and do not require specific statutory authorization.

2.1.2 General Information.

2.1.2.1 Period of Performance (PoP). The PoP shall be for one (1) Base Period of 12 months and four (4) 12-month option periods with an option to extend services for up to six (6) months.

Note: The Government reserves the right to extend the term of this contract at the prices set forth in Section B of award in accordance with the terms and conditions contained in clause 52.217-9 entitled, “Option to Extend the Term of the Contact.”

2.1.3 Place of Performance and Hours of Operation.

2.1.3.1 Place of Performance. The work to be performed under this contract will be performed on Fort McCoy at various facilities and locations. Please see location maps (attachments) which are subject to change due to mission requirements.

2.1.3.2 Hours of Operation. The Government's regular (normal) hours are from 0700 – 1600 hours, except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. The Contractor shall conduct business during regular hours.

2.1.4 Federal Holidays. The Contractor’s performance shall not be required on the Federal public holidays listed below. Holidays occurring on weekends will be observed as directed by the Federal calendar (5 U.S.C. 6103). When required services occur on holidays, work will be performed on either the previous or following workday, unless otherwise specified.

New Year’s Day1st day of January
Martin Luther King Jr.'s Birthday3rd Monday of January
Presidents Day3rd Monday of February
Memorial DayLast Monday of May
Juneteenth19th day of June
Independence Day4th day of July
Labor Day1st Monday of September
Columbus Day2nd Monday of October
Veterans Day11th day of November
Thanksgiving Day4th Thursday of November
Christmas Day25th day of December

2.1.4.1 Unscheduled Services. The Contractor shall provide personnel support within four (4) hours of notification outside the normal hours of operation as required, including holidays, to support the Directorate of Public Works (DPW) mission. Prior to performance of services outside the locally established hours of operation, the Contractor shall request and obtain, in writing, approval from the COR. The Program Manager shall be available after normal hours to serve as the central point of contact for Contractor operations. Contractor personnel shall not be scheduled for overtime work.

2.1.4.2 Installation Closures. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall:

a. Reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a legal public holiday, and when routine work is not scheduled for that day; or

b. Reschedule the work on any day mutually satisfactory.

2.1.4.3 Inclement Weather Delay. If the Contractor determines unsafe weather conditions for continued operations, then the Contractor shall notify the COR if inclement weather suspends operations within two (2) hours. The Contractor shall resume operations with COR approval within twenty-four (24) hours.

2.1.4.4 Inclement Weather Rescheduling. The Contractor shall not perform services during unduly severe weather as authorized by the COR. The Contractor shall submit a revised make-up collection schedule to the COR within two (2) working days for approval and rescheduling.

2.1.5 Emergency Services. The Contractor shall provide an emergency point of contact name and telephone number prior to commencement of work and upon any changes. The Contractor or their employees shall immediately notify their supervisor of any accident requiring emergency medical treatment. The Contractor shall notify the Directorate of Emergency Services (DES) 608-388—2266, COR/ACOR immediately, not later than (NLT) two (2) hours of the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel.

2.1.6 Contract Administration and Management.

2.1.6.1 Post Award Conference/Performance Evaluation Meetings. The Contractor shall attend the post award conference convened by the contracting activity or contract administration office IAW FAR Subpart 42.5. Written minutes of meetings will be recorded by the Government and signed by both the Program Manager and the KO. The written minutes will be distributed within five (5) workdays after the meeting. If the Contractor does not concur with any portion of the minutes, recorded by the Government, the non-concurrence shall be provided in writing to the KO within two (2) calendar days following receipt of the minutes.

2.1.6.2 Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.

2.1.6.3 The following provides the roles and their respective authority during the performance of the contract:

2.1.6.4 Contracting Officer (KO). The KO is the only person authorized to direct changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO. In the event the Contractor makes any change at the direction of any person other than the KO, the change shall be considered to have been made without authority and solely at the risk of the Contractor. The KO will effect all contract administration. Communications pertaining to contractual administrative matters shall be addressed to the KO. No changes in or deviation from the terms and conditions shall be affected, without a written modification to the contract, executed by the KO authorizing such changes. The KO will approve all submittals and plans required in this PWS.

2.1.6.5 Contracting Officer’s Representative (COR). The KO will appoint a COR during the performance of this contract. Additional Government personnel may be assigned to assist in contract oversight IAW AR 70-13, Management and Oversight of Service Acquisitions. Other surveillance personnel may be designated as COR or ACOR, and shall be trained and appointed IAW DoDI 5000.72, DoD Standard for Contracting Officer’s Representative (COR) Certification and DFARS 201.602-2. The ACOR will serve as on-site representatives of the COR in performance of actual contract surveillance, if they meet all COR training, experience requirements, and are appointed by the KO as an ACOR. The COR/ACOR will aid in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems. The COR/ACOR will perform IAW the responsibilities and duties identified in the appointment letter.

2.1.6.6 COR Authority. A letter of designation will be issued to the COR/ACOR by the KO. A copy of the letter will be sent to the Contractor. The letter of designation states the responsibilities and limitations of the COR/ACOR, especially regarding changes in cost, price estimates, or changes in delivery dates. The COR/ACOR is not authorized to change any of the terms and conditions regarding cost, quantity, or schedule of the resulting order.

2.1.6.7 The Contractor shall not in any way represent the United States (U.S.) Government, or that it has the authority to contract or procure supplies for the account of the United States of America (USA).

2.1.6.8 COR/ACOR Functions. The COR/ACOR monitors all technical aspects of the contract and assists in contract administration. The COR/ACOR is authorized to perform the following functions: assure the Contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements; monitor, document, and report Contractor's performance and notify both the KO and Contractor of any deficiencies; coordinate availability of Government-Furnished Property, and coordinate site entry of Contractor personnel.

2.1.6.9 Inspection Results. The contractor will be notified of Government inspection results. The contractor shall acknowledge receipt of the inspection results. The contractor may be notified of inspection results verbally. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made based on the initial inspection.

2.1.7 Quality Control (QC). Quality Control is the responsibility of the Contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.212-4, Contractor Terms and Conditions – Commercial Items). A formal Quality Control Plan (QCP) is not required for this commercial service. However, the contractor shall maintain an inspection system commensurate with commercial practices to ensure the Contractor only tenders for acceptance those items or services that conform to the requirements of this contract.

2.1.7.1 The Procurement Integrated Enterprise Environment (PIEE) Tool (https://wawf.eb.mil/xhtml/auth/home/home.xhtml#) shall be used for nomination, tracking, documentation, and management of CORs IAW DoDI 5000.72, DFARS 201.602-2 and PGI 201.602-2.

2.1.7.2 Invoicing. The contractor shall submit all invoices in Procurement Integrated Enterprise Environment (PIEE) Wide Area Workflow (WAWF).

2.1.8 Key Personnel.

2.1.8.1 Contract Manager. The Contractor shall provide a contract manager and an alternate who shall be responsible for the performance of the work. The name of this person and alternate(s) shall be designated in writing to the COR no later than fifteen (15) days prior to the contract start date. Changes to personnel shall be submitted to the Government within five (5) workdays of the change for approval. The contract manager or alternate shall have full authority to act on all contract matters relating to the daily operation of the contract. The Contractor shall furnish after duty hour telephone numbers for the contract manager and alternate. The contract Manager shall be available between 0700 - 1600 hours, Monday through Friday except Federal holidays or when the Government facility is closed for administrative reasons. The contract manager or alternate shall be available to meet with the KO or COR within two (2) business days of request within normal operating hours and return phone calls and or emails within one (1) business day. The Contract Manager and any individuals designated as key personnel shall be able to understand, speak, read, and write the English language.

2.1.8.2 Contractor Employees. The Contractor shall furnish an adequate number of supervisory, quality control, administrative and direct labor personnel skilled in all trades necessary to fulfill Contract requirements. The Contractor shall not hire any person whose employment would result in a conflict with the "Joint Ethics Regulation" (JER) DOD 5500.7-R. Personnel employed to provide the services described herein shall be competent in the performance of such services. Contractor personnel shall speak, read, and write the English language. All Contractor employees shall be legal U.S. residents. The Contractor shall immediately remove any employee that is not a legal U.S. resident. The Contractor personnel shall be able to communicate clearly in the English language.

2.1.9 Qualification Standards.

2.1.9.1 Contractor Identification. Identification of Contractor Employees. The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name, and a color photo of the employee. ID Badges for Key Personnel shall also indicate their job title. Employees ID badges shall always be worn while performing work under this contract. Each Contractor (to include subcontractors) employees shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. An Employee Roster with a listing of issued identification cards shall be furnished to the Contracting Officer prior to the contract performance date and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.

2.1.9.2 Standards of Conduct. Contractor personnel’s conduct shall not reflect discredit upon the Government. The Contractor shall ensure all personnel present a professional appearance while working on the Government installation. The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance. The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner. The Contractor shall remove, from the job site, any employee for reasons of misconduct or security. The Contractor shall ensure employee conduct complies with 41 USC 423, Procurement Integrity. The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.

2.1.9.3 Contractor Hiring Restrictions. The Contractor shall not hire or sub-contract with off duty or former Government employees whose employment would result in a conflict with AR 600-50, Standards of Conduct.

2.1.9.4 Organizational Conflict of Interest (OCI). Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications, or work statements, etc.), or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the KO immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the KO to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the KO, and in the event the KO unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the KO may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

2.1.10 Business Relations. The Contractor shall successfully integrate and coordinate all activity needed to execute the requirement of this PWS. The Contractor shall manage the timeliness, completeness, and quality of problem identification to a degree acceptable to the Government. The Contractor shall provide to the COR/ACOR corrective action plans, timely identification of issues, and effective management of subcontractors within fifteen (15) days or at a mutually agreed upon date. The Contractor shall ensure customer satisfaction and professional and ethical behavior of all Contractor personnel.

2.2 Work Management:

2.2.1 Coordination. The Contractor shall schedule and coordinate with the COR/ACOR to minimize disruptions to the facility mission.

2.2.2 Other Documents. The Contractor shall update and maintain all technical exhibits as shown and stated in the PWS.

2.3 Special Requirements.

2.3.1 Security.

2.3.2 Installation Access. “Reference PWS ANNEX A 1.4 Facility Access” The COR/ACOR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or installation changes.

2.3.3 Motor Vehicle Operators. Contractor’s personnel, whose tasks involve operation of any vehicles, shall possess a valid State driver’s license and/or Commercial Driver’s License (CDL), certificates, and permits applicable for the type and class of vehicle being operated.

2.3.4 Contractor-Vehicle Licensing and Insurance. The Contractor shall ensure that all Federal, State, County insurance and licensing, certification requirements and permits are met and kept current. The Contractor shall provide documentation of insurance and employee licensing and certification upon request by the COR.

2.3.5 Physical Security. The Contractor shall safeguard all Government property provided for Contractor use (Keys). The Contractor shall secure Government facilities, ranges, and Training areas at the close of each work period. The Contractor will be provided a government furnished on-site staging area(s) for necessary equipment and materials. The Contractor shall secure the area at the close of each work period. The Contractor shall be solely responsible for any loss or damage of equipment and material. The Contractor shall ensure debris of any type will be disposed of according to local policies and directives.

2.3.6 Confined Spaces. The Contractor must be certified to work in a confined space and must comply with all State and Federal regulations for confined space entry and provide all required safety equipment and personnel protective equipment for use by their employees. The Contractor shall provide documentation of confined space certification and submit a confined space plan, to include contacting the Fort McCoy Fire Department at 502-898-2508, upon an employee entering and exiting such spaces, within 15 workdays of being initially awarded this contract, at the start of each option period, at any changes, and upon request to the COR.

2.3.7 Mishaps Reporting. In the event of any mishap to property or person(s), the Contractor shall take reasonable and prudent action to establish control of the mishap scene, prevent further damage to persons or property and notify emergency services by calling 911. The Contractor shall remain on-scene until released by the Fort McCoy Police Department. The Contractor shall record and report promptly (within one (1) hour) to the COR all available facts relating to each instance of damage to Government property, Personal property or any personal injury. Initial notification may be made by phone followed up by a written report.

2.4 Security Training.

2.4.1 Safety. The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract. The Contractor shall develop and implement a safety program for its employees. The Contractor shall comply with AR 385-10, The Army Safety Program.

2.4.2 Occupational Safety and Health. The Contractor shall comply with the Occupational Safety and Health Administration (OSHA) standards. The Contractor shall comply with all applicable Federal, State, and local laws, regulations, and directives.

2.5 Training, Physical Requirements, or other Expertise Required.

2.5.1 The Contractor shall ensure all Contractor’s employees and associated subcontractors are certified or licensed in the specific areas required by the State of Wisconsin. The Contractor shall ensure employees are certified or licensed in the appropriate Environmental Protection Agency (EPA) areas required. The Contractor shall ensure all required documentation of certification or licensure for Contractor personnel are filed with the COR/ACOR within twenty-four (24) hours prior to employees commencing performance.

2.5.2 Environmental Requirements.

2.5.3 Green Procurement. Section 6002 of the Resource Conservation and Recovery Act of 1976 (RCRA) requires the use of recycled and recovered products identified in the EPA’s Comprehensive Procurement Guidelines. This includes Army regulations, operating procedures, and permit conditions. Contractor operations are subject to environmental compliance inspections without notice. In the event environmental laws/regulations changed during the term of this contract, the Contractor is required to comply as such laws come into effect.

2.5.4 The Contractor shall use these recycled or recovered products unless they cannot be procured within a reasonable period of time not to exceed seven (7) calendar days; at prices not to exceed five (5) percent of prevailing rates; or the product(s) does not meet technical or performance standards. EPA Guidelines are the minimum requirement. The Contractor shall use materials and products commonly used in industry. The Contractor shall maintain records and submit an annual report to the COR/ACOR, along with the annual certification required by FAR 52.223-9 (Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items), upon completion of the base year and each option year.

2.5.5 Environmental Compliance. The Contractor shall be knowledgeable of and comply with all Federal, State, local, and installation environmental laws, rules, plans, and policies. The Contractor shall use and store all materials, chemicals, and equipment used in the performance of services on the installation IAW with industry standards, local, State and Federal laws, and according to manufactures' recommendations. The Contractor shall be financially responsible for all fines and associated costs for hazardous waste management, transportation, and disposal of waste due to the Contractor's non-compliance. The Contractor shall submit Safety Data Sheets (SDS) for approval on all materials, five (5) days before delivery of the material, to the COR/ACOR. The Contractor shall provide upon request from the COR/ACOR all required data to meet environmental-mandated reporting requirements (e.g., air emission data, hazardous material storage/usage, herbicide/pesticide usage, solid/hazardous waste generation). The Contractor shall provide data to meet reporting deadlines and during compliance inspections upon request from the COR/ACOR.

2.5.6 Notification of Environmental Spills. The Contractor shall immediately report the incident to the Police Desk at 911 of any spills or releases of hazardous substances or material in performance of this contract or any other substance contained in 40 CFR 302 into the environment, The Contractor or its agent shall notify the COR/ACOR within one (1) hour in the event of spills or releases.

2.5.7 Spill Response Plan. The Contractor shall have an emergency spill response plan, for spills that could occur on Fort McCoy and those that could occur off Fort McCoy. The plan(s) shall include at a minimum detailed instructions for handling spills, reporting requirements, clean up and restoration procedures. Spills that occur on Fort McCoy shall be handled IAW Fort McCoy Pamphlet 420-28 and all reporting requirements shall be submitted only to the Fort McCoy Directorate of Public Works, Environmental Compliance Branch who will be responsible to report the occurrence to all outside agencies. i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification. The Contractor shall submit a Spill Plan to the COR for approval within thirty (30) days of contract award IAW Spill Prevention Control and Countermeasure Plan. In the event of a spill, the Contractor shall initiate their spill response plan and continue to work until the emergency situation no longer exists.

2.5.8 Plan Updates. The Contractor shall update these plans as changes occur and shall submit a copy of the proposed plan to the KO/COR for approval at least thirty (30) days prior to the proposed effective date of the updated plan.

2.5.9 Liability. The Contractor shall assume liability for acts or omission in regard to compliance with Federal, State, and local environmental statues, regulations, and applicable guidelines, including, but not limited to fines or penalties associated with enforcement actions and costs for environmental restoration (removal actions, remedial actions, and corrective actions). The Contractor and any subcontractor shall assume liability in the event that their actions result in the release of hazardous substance into the environment. The liability for the spill or release of such substance’s rests solely with the Contractor and its agent. The Contractor and any subcontractors shall be responsible for documentation, reporting, assessment, and remedial action requirements associated with such release and restoration of any damages.

2.5.10 Environmental Pollution Prevention. The Contractor shall perform all work to minimize environmental pollution or degradation of the environment of natural/cultural resources. The Contractor shall comply with all Federal, State, and local regulations and guidelines, while on the reservation to ensure safe working conditions for contractor personnel and a safe environment for the occupants of Army facilities.

2.6 Quality Assurance (QA)/Inspection Support. The Government may use a variety of surveillance methods to evaluate the contractor’s performance. The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price. If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the Performance Requirements Summary (PRS), the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Contract Discrepancy Report (CDR) in which the contractor will be required to respond with the development of a corrective action plan (CAP) which identifies the root cause, corrective action (CA) for the root cause, CA for the specific nonconformance, and the date the CAs will be complete. The Government may also reduce the payment to the contractor IAW the PRS or reduce payment to reflect the value of the services performed or may perform the services and charge the Contractor for any related cost incurred and/or may terminate this contract for cause.

3.0 Performance Requirements and Standards.

3.1 High Level Objectives (HLO).

3.1.1 Performance Task Requirements, Standards and Acceptable Quality Levels (AQLs).

3.1.2 Damage Caused by Contractor. Damages caused by Contractor employees shall be repaired at no cost to the Government. The Contractor shall notify the COR/ACOR and return the damaged area to its previous condition. The Contractor shall furnish all labor, materials, and equipment to perform the repair work including cultivating and applying seed, sprigging, or placing sod. The Contractor shall maintain all turf repair work to ensure successful growth.

3.1.3 Damage Report. The Contractor shall submit a damage report to the COR/ACOR that annotates the damage, corrective action, and date corrected.

4.0 Performance Requirements Summary (PRS) Matrix.

Performance Requirement Summary Description: The minimum timeliness and quality standards to be achieved by the Contractor for the various functions and tasks covered in this PWS are provided in the Performance Requirements Summary. The performance standards will be used by the Government to inspect Contractor’s performance. Government quality assurance surveillance of Contractor performance is not limited to the task requirements as outlined in the Performance Requirements Summary (PRS). The Government reserves the right to conduct surveillance of any contract requirement.

PRS #
Performance Objective
Performance Standard
Acceptable Quality Limit
Method of Surveillance
Consequence for Failure
1
PWS Annex (B) 2.1 – Schedule of Services
No more than two hours variance from established schedule.
No more than three (3) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
2
PWS Annex (B) 2.1.1 Emergency Services
Respond to emergencies within four (4) hours and shall begin work within six (6) hours of notification by the COR
Zero Deviation
Customer Complaint
Failure will result in a CAR
3
PWS Annex (B) 2.2.2- Sludge Removal
Sludge pumped out to a level of no greater than 18” above the most center point of the tank’s base.
Zero Deviation
Customer Complaint
Failure will result in a CAR
4
PWS Annex (B) 2.2.3- Digester Pumping, Cleaning, and Inspection
All sludge and other materials removed from structure surfaces. Sludge pumped out to a depth of no greater than 18” from center of tank or until pump loses prime.
Zero Deviation
Customer Complaint
Failure will result in a CAR
5
PWS Annex (B) 2.2.4- Dry Cake Sludge Removal
All cake sludge removed from each bed and sand replenished and leveled even with the top of the concrete access pads with no more than a deviation of ½” below the concrete access pads.
Zero Deviation
Customer Complaint
Failure will result in a CAR
6
PWS Annex (B) 2.2.5- Drying Bed Reconditioning
Remove and replenish all sand and other bed materials; Refilled with sand leveled even with the top of the concrete access pads with no more than a deviation of ½” below the concrete access pads.
Zero Deviation
Customer Complaint
Failure will result in a CAR
7
PWS Annex (B) 2.3.1- WWTP Grit Chamber
Rinsing of the inlets, outlets, baffles and all other associated parts and assemblies, removal of all grease, sludge, grit, and solid waste materials. Pump the tank until there is no greater than 6” of liquids remaining from center of tank or until the pump loses prime.
No more than two (2) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
8
PWS Annex (B) 2.3.2- WWTP Contact Pit
Rinsing of the inlets, outlets, baffles, by-pass vents, and all other associated parts and assemblies, removal of all sludge, grit, and solid waste materials. Pump the tank until there is no greater than 18” of liquids remaining from center of tank or until the pump loses prime.
Zero Deviation
Customer Complaint
Failure will result in a CAR
9
PWS Annex (B) 2.4- Interior Grease Recovery Devices
Remove all grease, solids, residue, and other foreign materials; flushed with water and pumped out.
No more than two (2) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
10
PWS Annex (B) 2.4.2-Waste Vegetable Oil Pumping
Pump contents to a minimum of 1” of the bottom of the container or until pump loses prime.
No more than two (2) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
11
PWS Annex (B) 2.4.1- Exterior Grease Interceptors Pumping
All grease, grit and debris removed; inlet and outlet baffles are free of sludge and operating correctly; and system rinsed. Pump contents to a minimum of 1” of the bottom of the container or until pump loses prime.
No more than two (2) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
12
PWS Annex (B) 2.5- Lift Stations
Removal of all sludge, grit, and solid waste materials, rinsing of the inlets, outlets, level floats, by-pass vents, grinders and all other associated parts and assemblies. Pump contents to a minimum of 1” of the bottom of the container or until pump loses prime.
No more than one (1) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
13
PWS Annex (B) 2.6.1- Septic Tanks
Cleaning effluent screens and removal of all sewage, sludge, and solid waste materials. Pump contents to a minimum of 6” of the bottom of the tank or until pump loses prime.
No more than three (3) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
14
PWS Annex (B) 2.6.2- Vault Toilets
Removal of all sewage, sludge, solid waste, and litter. Pump contents to a minimum of 2” of the bottom of the tank or until pump loses prime.
No more than three (3) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
15
PWS Annex (B) 2.7- Oil Water Separators
Removal of all POL, water, sludge, sediment, and other waste materials, rinsing of the inlets, outlets, baffles, screens, coalesce plates, strainers and all other associated parts and assemblies and removal of the rinsing materials, fluids, and sediments.
No more than three (3) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR
16
PWS Annex (B) 2.8 Miscellaneous Pumping and Disposal
Pump contents to a minimum of 1” of the bottom of the container or until pump loses prime.
No more than one (1) validated customer complaint per contract period of performance.
Customer Complaint
Failure will result in a CAR

4.1 Quality Assurance. The Government will evaluate the Contractor’s performance under the contract IAW the Government’s Quality Assurance Surveillance Plan (QASP). QASPs are "living documents," dynamic, adaptable, and subject to modification based on Contractor performance surveillance results. The QASP is not part of the PWS and will not be issued with the solicitation.