W911SA-17-R-3001_0006_Conformed_Solicitation.docx
DOCX document 284 KB Posted
- Solicitation number
- W911SA-17-R-3001
About this file
This solicitation requests proposals for logistics readiness support services for the 63rd Regional Support Command in multiple states. Key details include:
-
The contractor shall provide planning, programming, administration, management and execution to perform logistics maintenance and operations services at various Army Reserve locations in Arizona, New Mexico, Oklahoma, Texas, and Arkansas.
-
Services include base logistics support at specific sites, as well as surge support for potential increased workloads. The period of performance is one base year with four one-year options and one six-month option.
-
The solicitation identifies minimum and maximum order guarantees, pricing terms including firm fixed price, and a small business set-aside under NAICS code 561210 with a size standard of $38.5 million.
-
The document provides instructions for offeror registration requirements, the proposal submission process, and notes that a site visit is scheduled on specified dates for interested offerors to tour facilities.
W911SA-17-R-3001 0006 Conformed Solicitation
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA-17-R-3001
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
COE/63rd RSC SMMS, NEFF/ETS, HHC 63rd RS
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 63rd, RSC LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010989653
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
COE/ SMMS, NEFF/ETS, HHC 10% Surge
COE/63rd RSC SMMS, NEFF/ETS,HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
COE/ SMMS, NEFF/ETS, HHC 10% Surge
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
COE/ SMMS, NEFF/ETS, HHC 10% Surge
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 2, ECS 7 and ECS 87
ECS 2, ECS 7 and ECS 87 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 2, ECS 7 and ECS 87 10% Surge
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 2, ECS 7 and ECS 87 10% Surge
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 2, ECS 7 and ECS 87 10% Surge
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 64
ECS 64 LOCATION LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 64 10% Surge
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 64 10% Surge
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
ECS 64 10% Surge
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
Multi locations
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
Multi locations 10% Surge
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
Multi locations 10% Surge
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 9 |
| Months |
Multi locations 10% Surge
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Travel-Reimbursable
THIS CLIN IS A PLUG NUMBER OF $150,000.00 TRAVEL REIMBURSABLE. THE TOTAL COST FOR THE TRAVEL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE. ONLY TRAVEL COSTS AUTHORIZED BY THE GOVERNMENT MAY BE INVOICED AGAINST THIS CLIN. THE GOVERNMENT WILL NOT PAY FOR TRAVEL THAT HAS NOT BEEN USED. SEE PWS 5.16 FOR TRAVEL REQUIREMENTS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Material-Reimbursable
THIS CLIN IS A PLUG NUMBER OF $10,000.00 MATERIAL REIMBURSABLE. THE TOTAL COST FOR THE MATERIAL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE. THE ONLY REIMBURSABLE MATERIAL AUTHORIZED IS MATERIAL RELATED IN SUPPORT OF PWS CONTRACTOR REIMBURSABLE PURCHASES. SEE PWS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
Contractor Manpower Reporting
THE CONTRACTOR SHALL REPORT ALL CONTRACTOR MANPOWER REQUIRED FOR PERFORMANCE OF THIS CONTRACT. IF NEEDED, PLEASE REFER TO THE CMR USERS GUIDE AT THE WEBSITE PROVIDED IN THE PWS, TO ASSESS THE LEVEL OF EFFORT THAT WILL BE REQUIRED TO COMPLY WITH THIS REQUIREMENT. REPORTING MUST OCCUR BY OCT 31 FOR ALL CONTRACTS THAT WERE MODIFIED OR CREATED DURING THE JUST COMPLETED FISCAL YEAR (OCT 1 TO SEP 30). IF CONTRACT PERFORMANCE IS COMPLETED BEFORE SEP 30 OF A FISCAL YEAR, THE DATA MAY BE ENTERED UPON CONTRACT COMPLETION RATHER THAN WAITING FOR THE END OF THE FISCAL YEAR. INVOICE FOR THIS CLIN SHALL NOT BE SUBMITTED FOR PAYMENT UNTIL COMPLETION OF REPORTING AS INDICATED. IF NO DIRECT COST IS ASSOCIATED WITH PROVIDING THE DATA, ENTER "NO COST". PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
Project Management
Project Management for the Logistical Support of the Directorate of Logistics, 63rd Readiness Division; Includes, but is not limited to, all project management staff for all functional areas of the DOL such as, Project Manager, Supervisors, Quality Control, Safety, Environmental, Human Resources, contract administration and data entry support (payroll, pass & ID, etc.). Contractor is to comply with the Performance Work Statement, the Solicitation, and all Contract Documents.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
PHASE-IN
PHASE IN PERIOD OF NINETY (90) DAYS. DURING THE PHASE IN PERIOD, THE CONTRACTOR SHALL BECOME FAMILIAR WITH PERFORMANCE REQUIREMENTS AND GATHER ALL EQUIPMENT IN ORDER TO COMMENCE FULL PERFORMANCE OF SERVICES ON THE CONTRACT START DATE. CONTRACTOR SHALL HAVE PERSONNEL ON BOARD DURING THE NINETY(90) DAY PHASE IN PERIOD. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 63rd RS |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 63rd, RSC LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS,HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 |
FFP
ECS 2, ECS 7 and ECS 87 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 |
FFP
ECS 64 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Travel-Reimbursable |
FFP
THIS CLIN IS A PLUG NUMBER OF $150,000.00 TRAVEL REIMBURSABLE. THE TOTAL COST FOR THE TRAVEL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE. ONLY TRAVEL COSTS AUTHORIZED BY THE GOVERNMENT MAY BE INVOICED AGAINST THIS CLIN. THE GOVERNMENT WILL NOT PAY FOR TRAVEL THAT HAS NOT BEEN USED. SEE PWS 5.16 FOR TRAVEL REQUIREMENTS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Material-Reimbursable |
FFP
THIS CLIN IS A PLUG NUMBER OF $10,000.00 MATERIAL REIMBURSABLE. THE TOTAL COST FOR THE MATERIAL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE. THE ONLY REIMBURSABLE MATERIAL AUTHORIZED IS MATERIAL RELATED IN SUPPORT OF PWS CONTRACTOR REIMBURSABLE PURCHASES. SEE PWS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Contractor Manpower Reporting |
FFP
THE CONTRACTOR SHALL REPORT ALL CONTRACTOR MANPOWER REQUIRED FOR PERFORMANCE OF THIS CONTRACT. IF NEEDED, PLEASE REFER TO THE CMR USERS GUIDE AT THE WEBSITE PROVIDED IN THE PWS, TO ASSESS THE LEVEL OF EFFORT THAT WILL BE REQUIRED TO COMPLY WITH THIS REQUIREMENT. REPORTING MUST OCCUR BY OCT 31 FOR ALL CONTRACTS THAT WERE MODIFIED OR CREATED DURING THE JUST COMPLETED FISCAL YEAR (OCT 1 TO SEP 30). IF CONTRACT PERFORMANCE IS COMPLETED BEFORE SEP 30 OF A FISCAL YEAR, THE DATA MAY BE ENTERED UPON CONTRACT COMPLETION RATHER THAN WAITING FOR THE END OF THE FISCAL YEAR. INVOICE FOR THIS CLIN SHALL NOT BE SUBMITTED FOR PAYMENT UNTIL COMPLETION OF REPORTING AS INDICATED. IF NO DIRECT COST IS ASSOCIATED WITH PROVIDING THE DATA, ENTER "NO COST". PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Project Management |
FFP
Project Management for the Logistical Support of the Directorate of Logistics, 63rd Readiness Division; Includes, but is not limited to, all project management staff for all functional areas of the DOL such as, Project Manager, Supervisors, Quality Control, Safety, Environmental, Human Resources, contract administration and data entry support (payroll, pass & ID, etc.). Contractor is to comply with the Performance Work Statement, the Solicitation, and all Contract Documents.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/63rd RSC SMMS, NEFF/ETS, HHC |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 63rd, RSC LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/SMMS, NEFF/ETS, HHC 63rd 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS,HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/SMMS, NEFF/ETS, HHC 63rd 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/SMMS, NEFF/ETS, HHC 63rd 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 |
FFP
ECS 2, ECS 7 and ECS 87 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 |
FFP
ECS 64 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Travel-Reimbursable |
FFP
THIS CLIN IS A PLUG NUMBER OF $150,000.00 TRAVEL REIMBURSABLE. THE TOTAL COST FOR THE TRAVEL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE. ONLY TRAVEL COSTS AUTHORIZED BY THE GOVERNMENT MAY BE INVOICED AGAINST THIS CLIN. THE GOVERNMENT WILL NOT PAY FOR TRAVEL THAT HAS NOT BEEN USED. SEE PWS 5.16 FOR TRAVEL REQUIREMENTS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Material-Reimbursable |
FFP
THIS CLIN IS A PLUG NUMBER OF $10,000.00 MATERIAL REIMBURSABLE. THE TOTAL COST FOR THE MATERIAL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE. THE ONLY REIMBURSABLE MATERIAL AUTHORIZED IS MATERIAL RELATED IN SUPPORT OF PWS CONTRACTOR REIMBURSABLE PURCHASES. SEE PWS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Contractor Manpower Reporting |
FFP
THE CONTRACTOR SHALL REPORT ALL CONTRACTOR MANPOWER REQUIRED FOR PERFORMANCE OF THIS CONTRACT. IF NEEDED, PLEASE REFER TO THE CMR USERS GUIDE AT THE WEBSITE PROVIDED IN THE PWS, TO ASSESS THE LEVEL OF EFFORT THAT WILL BE REQUIRED TO COMPLY WITH THIS REQUIREMENT. REPORTING MUST OCCUR BY OCT 31 FOR ALL CONTRACTS THAT WERE MODIFIED OR CREATED DURING THE JUST COMPLETED FISCAL YEAR (OCT 1 TO SEP 30). IF CONTRACT PERFORMANCE IS COMPLETED BEFORE SEP 30 OF A FISCAL YEAR, THE DATA MAY BE ENTERED UPON CONTRACT COMPLETION RATHER THAN WAITING FOR THE END OF THE FISCAL YEAR. INVOICE FOR THIS CLIN SHALL NOT BE SUBMITTED FOR PAYMENT UNTIL COMPLETION OF REPORTING AS INDICATED. IF NO DIRECT COST IS ASSOCIATED WITH PROVIDING THE DATA, ENTER "NO COST". PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Project Management |
FFP
Project Management for the Logistical Support of the Directorate of Logistics, 63rd Readiness Division; Includes, but is not limited to, all project management staff for all functional areas of the DOL such as, Project Manager, Supervisors, Quality Control, Safety, Environmental, Human Resources, contract administration and data entry support (payroll, pass & ID, etc.). Contractor is to comply with the Performance Work Statement, the Solicitation, and all Contract Documents.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/63rd RSC SMMS, NEFF/ETS, HHC 63rd RS |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 63rd, RSC LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS,HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| COE/ SMMS, NEFF/ETS, HHC 10% SURGE |
FFP
COE/63rd RSC SMMS, NEFF/ETS, HOT, PBT, HHC 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 |
FFP
ECS 2, ECS 7 and ECS 87 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 2, ECS 7 and ECS 87 10% SURGE |
FFP
ECS 2, ECS 7 and ECS 87 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 |
FFP
ECS 64 LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| ECS 64 10% SURGE |
FFP
ECS 64 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) LOGISTICS READINESS SUPPORT SERVICES. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT OF ARMY RESERVE READINESS FOR THE 63RD REGIONAL SUPPORT COMMANDS (RSC) IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| MULTIPLE LOCATIONS 10% SURGE |
FFP
MULTIPLE LOCATIONS (ECS 15, ECS 16, ECS 162, AMSA 5, AMSA 9, AMSA 11, AMSA 14, AMSA 18, AMSA 19, AMSA 20, AMSA 26, AMSA 34, AMSA 73, AMSA 77, AMSA 95, AMSA 96) 10% SURGE IN WORKLOAD. THE CONTRACTOR SHALL PROVIDE ALL PLANNING, PROGRAMMING, ADMINISTRATION, MANAGEMENT AND EXECUTION NECESSARY TO PERFORM LOGISTICS MAINTENANCE SERVICES AND OPERATIONS FOR THE SUPPORT THE INCREASE IN WORKLOAD IN ACCORDANCE WITH THE PERFORMANCE WORK STATEMENT AND THE TERMS AND CONDITIONS OF THE SOLICITATION AND RESULTANT CONTRACT. THE CONTRACTOR SHALL PLAN FOR AND RESPOND TO CHANGES IN WORKLOAD REQUIRMENTS AND THE RESULTING CHANGES TO MANNING LEVELS. PLEASE FILL IN THE ATTACHED PRICE SCHEDULE.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Each |
| OPTION |
| Travel-Reimbursable |
FFP
THIS CLIN IS A PLUG NUMBER OF $150,000.00 TRAVEL REIMBURSABLE. THE TOTAL COST FOR THE TRAVEL LINE ITEM NUMBER MAY NOT EXCEED THIS MAXIMUM VALUE.
This is the start of the file's text. The full file is on GovTribe.