W911SA-17-Q-0012_Attachment_2_PRS_DPW_88th_V_1.1_(2_Nov_16)_PERFORMANCE_OBJECTIVE.docx
DOCX document 29 KB Posted
- Attached to
- Custodial Services, Hayden, ID
- Solicitation number
- W911SA-17-Q-0012
About this file
Attachment 2 PRS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911SA-17-Q-0012_Amendment_0004_Conformed.docx | DOCX document | |
| W911SA-17-Q-0012_Amendment_0004_Modified.docx | DOCX document | |
| W911SA-17-Q-0012_Attachment_6_Price_Schedule_ID017_Revised_2.xlsx | XLSX spreadsheet | |
| W911SA-17-Q-0012_Amendment_0003.docx | DOCX document | |
| W911SA-17-Q-0012_Attachment_6_Price_Schedule_ID017_Revised.xlsx | XLSX spreadsheet | |
| W911SA-17-Q-0012_Amendment_0002.docx | DOCX document | |
| W911SA-17-Q-0012_Amendment_0001.docx | DOCX document | |
| W911SA-17-Q-0012_Solicitation.docx | DOCX document | |
| W911SA-17-Q-0012_Attachment_4_ID017_PR_10842729_AT_OPSEC_Cover_Sheet.pdf | ||
| W911SA-17-Q-0012_Attachment_6_Price_Schedule_ID017.xlsx | XLSX spreadsheet | |
| W911SA-17-Q-0012_Attachment_3_Drawing.docx | DOCX document | |
| W911SA-17-Q-0012_Attachment_5_Custodial_Service_Ticket_Template_(SEP_16).docx | DOCX document | |
| W911SA-17-Q-0012_Attachment_1_Custodial_Deliverables_V__1.1.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment – Custodial Removal Performance Requirements Summary
PERFORMANCE REQUIREMENTS SUMMARY
Version 1.1; 02 Nov 2016
| PERFORMANCE OBJECTIVE |
| STANDARD |
| PERFORMANCE THRESHOLD |
| METHOD OF SURVEILLANCE |
| INCENTIVE |
| 1) PWS Part 1 General Information. Contractor shall comply with the PWS requirements relating to general management and administrative operations. |
| All PWS requirements shall be completed as stated within Part 1. |
| Contractor shall maintain an 85% or better total overall PRS Inspection Checklist compliance rate per facility. |
| Periodic Surveillance: The COR will utilize a PRS Inspection Checklist with pass/fail criteria which may include any or all of the PWS requirement(s) stated within Part 1 in assessment of the total overall contractor performance compliance rate. |
Government will require rework for any services found not performed to the stated PWS standard. Reoccurring performance issues can lead to contract termination.
If rework cannot be completed, or is not completed to standard, an equitable price reduction and/or adequate consideration will be assessed by the Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the stated percentage of the performance threshold.
Results will be recorded and may be reported in CPARS.
| 2) PWS Part 5 Specific Tasks. Contractor shall comply with PWS requirements relating to specific tasks operations. |
| All PWS requirements shall be completed as stated within Part 5. |
| Contractor shall maintain an 85% or better total overall PRS Inspection Checklist compliance rate per facility. |
| Periodic Surveillance: The COR will utilize a PRS Inspection Checklist with pass/fail criteria which may include any or all of the PWS requirement(s) stated within Part 5 in assessment of the total overall contractor performance compliance rate. |
Government will require rework for any services found not performed to the stated PWS standard. Reoccurring performance issues can lead to contract termination.
If rework cannot be completed, or is not completed to standard, an equitable price reduction and/or adequate consideration will be assessed by the Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the stated percentage of the performance threshold.
Results will be recorded and may be reported in CPARS.
| 3) PWS Part 7 Technical Exhibits and Attachments. Contractor shall comply with PWS provisions relating to technical exhibits and attachments operations. |
| All Technical Exhibits and Attachments shall be completed as stated within the document. |
| Contractor shall maintain an 85% or better total overall PRS Inspection Checklist compliance rate per facility. |
| Periodic Surveillance: The COR will utilize a PRS Inspection Checklist with pass/fail criteria which may include any or all of the Technical Exhibit and Attachment requirement(s) stated within Part 7 in assessment of the total overall contractor performance compliance rate. |
Government will require rework for any services found not performed to the stated PWS standard. Reoccurring performance issues can lead to contract termination.
If rework cannot be completed, or is not completed to standard, an equitable price reduction and/or adequate consideration will be assessed by the Contracting Officer for acceptance of nonconforming services when the contractor compliance rate is below the stated percentage of the performance threshold.
Results will be recorded and may be reported in CPARS.
Version 1.1 02 NOV 2016
File details come from the government source that posted it. Updated .