W911SA-17-B-2004_Solicitation_Amendment_0003.docx
DOCX document 27 KB Posted
- Attached to
- REPLACE FLOORING AT B370 AND B520 AT CAMP PARKS, CA Federal contract opportunity
- Solicitation number
- W911SA-17-B-2004
About this file
Solicitation Amendment 0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA-17-B-2004_CORRECTED_Preliminary_Bid_Opening_Results.pdf | ||
| W911SA-17-B-2004_Abstract_of_Offers.pdf | ||
| W911SA-17-B-2004_Solicitation_Amendment_0002.docx | DOCX document | |
| W911SA-17-B-2004_Attachment_4_Wage_Determination_6.30.17.docx | DOCX document | |
| W911SA-17-B-2004_Solicitation_Amendment_0001.docx | DOCX document | |
| W911SA-17-B-2004_Site_Visit_Attendees_Cards.pdf | ||
| W911SA-17-B-2004_Attachment_3.1_B370_floor_plan.pdf | ||
| W911SA-17-B-2004_Attachment_5_SF_24.pdf | ||
| W911SA-17-B-2004_Solicitation.docx | DOCX document | |
| W911SA-17-B-2004_Attachment_4_Wage_Determination.docx | DOCX document | |
| W911SA-17-B-2004_Attachment_3.2_B520_floor_plan.pdf | ||
| W911SA-17-B-2004_Attachment_1_AT_OPSEC.pdf | ||
| W911SA-17-B-2004_Attachment_2_SOW.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W911SA-17-B-2004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
QUESTION AND ANSWERS PART TWO
Q9. With reference to solicitation W911SA‐17‐B‐2004, Replace Flooring at B370 and B520 at Camp Parks, CA, our flooring subcontractor informed us that the manufacturer of the specified VCT product specifies sealing/waxing the VCT 72‐hours after installation.
I perused the solicitation documents and did not find any reference to sealing/waxing of the VCT. Accordingly, will the government require sealing/waxing as a part of the scope of work? If so, will the government be performing the application with their own work force, or would you prefer the contractor include this in their scope of work?
A9. The contractor shall include this in their scope of work, since the end users will not be doing this work.
(End of Summary of Changes) image1.wmf