W911SA-24-Q-3091 SOL Final 9.20.24.pdf
PDF 1 MB Posted
- Attached to
- Pest Control Services, Region 3, Multiple Locations in Texas Federal contract opportunity
- Solicitation number
- W911SA24Q3091
About this file
This document is a solicitation for a Request for Quotes (RFQ) for Pest Control Services at various United States Army Reserve (USAR) facilities in Texas. The contractor shall provide all labor, equipment, supplies, supervision, and other items necessary to perform monthly pest control services in accordance with the Performance Work Statement (PWS).
The solicitation has a 1-year base period of performance with four 1-year option periods and a 6-month option to extend services. This procurement is set aside for 100% Service-Disabled Veteran-Owned Small Business under NAICS code 561710 with a size standard of $17.5 million. The incumbent contractor is Dowell Pest Control with a total contract value of $386,017.50. Quotes are due by 10:00 AM CT on October 11, 2024. The government intends to award without discussions but reserves the right to conduct discussions if necessary. Pricing will be on a Firm Fixed Price basis.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911SA24Q3091 Amendment Three (3).pdf | ||
| W911SA-24-Q-3091 7.1 Attachment 1 V2 - Blank Price Schedule CUI.xlsx | XLSX spreadsheet | |
| W911SA24Q3091 Amendment Two (2).pdf | ||
| W911SA-24-Q-3091 Amendment 1- 9.27.24.pdf | ||
| W911SA-24-Q-3091 7.5 Attachment 5 - Pest Management Record.pdf | ||
| W911SA-24-Q-3091 7.6 Attachment 6 - Integrated Pest Management Plan.pdf | ||
| W911SA-24-Q-3091 7.1 Attachment 1 - Blank Price Schedule CUI.xlsx | XLSX spreadsheet | |
| W911SA-24-Q-3091 7.2 Attachment 2 - Drawings.docx | DOCX document | |
| W911SA-24-Q-3091 7.3 Attachment 3 - AT OPSEC.pdf | ||
| W911SA-24-Q-3091 7.4 Attachment 4 - Pesticide Use List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W911SA24Q3091 20-Sep-2024
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
10:00 AM 11 Oct 2024
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W911SA9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
JESSILYN S SANBORN
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0012080102
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
W6QM MICC FT MCCOY (RC)
KO DIRECTORATE OF CONTRACTIN
BLDG 1108 SOUTH R STREET
FORT MCCOY WI 54656-5142
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W90XCV 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
W90XCV: WITKOWSKI AFRC
63RD READINESS DIVISION
230 RT JONES RD
MOUNTAIN VIEW CA 94043
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$17,500,000
NAICS:
561710
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF66
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
SUPPLEMENTAL INFORMATION
1. An Award for this requirement will be made pursuant to FAR 13.5, Simplified Procedures for Certain Commercial Items.
2. The period of performance is anticipated to be 15 November 2024 to 14 November 2025 (or subsequent date), with four (4) one (1) year options periods, and a six (6) month option to extend services.
3. Quotes shall be emailed to Solicitation POC: Jessilyn Sanborn, jessilyn.s.sanborn.civ@army.mil. Quotes are due to the Government on or before the date/time listed on the solicitation in central time. It is the contractor’s responsibility to ensure their quote is received by the due date and time. As an Addendum to FAR 52.212-1, contractor shall submit all items in accordance with the Supplemental Information by the solicitation closing date and time. The contractor SHALL provide all required documents with submission of quotes.
Signed SF 1449 Completed information from the Supplemental Information section of the solicitation Completed Price Schedule Attachment Signed Amendments (if applicable)
If all required documents are not provided with the quote submission, your quote MAY NOT be considered for award.
4. If a quote is based on a teaming/partnering relationship or a joint venture, the contractor shall provide, with the quote, all required solicitation information for all parties including a copy of the teaming/partnering or joint venture agreement. The agreement shall include information, which identifies the responsibilities for each entity under this contract. The agreement shall demonstrate the relationship between firms and identify contractual relationships and authorities to bind each entity of the teaming/partnering or joint venture relationship.
5. This procurement is Set Aside as 100% Service Disabled Veteran Owned Small Business NAICS Code 561710 with a size standard of $17.5 Million.
6. Prior Contract Information
Previous Contract Number: W911SA- 20-P-3017 Incumbent Contractor: Dowell Pest Control Total Contract Value (TCV): $386,017.50 *TCV calculated with base, all options and a six (6) month option to extend services.
7. Period for acceptance of quotes. The contractor agrees to hold the prices in its quote firm for 90 calendar days from the date specified for receipt of quotes.
8. No Site visit will be necessary for this requirement.
9. Written questions must be furnished to the Government no later 10:00 a.m. CT on 4 October 2024 in order to ensure a timely response is provided by the solicitation closing date. All questions are to be submitted in writing at the time indicated in the solicitation or they may not be addressed before solicitation closing date; therefore, contractors are advised to submit questions as soon as possible. Please provide your company name, telephone, point of contact, e-mail address, and solicitation number on all questions. The Government will respond to questions via the issuance of an amendment which incorporates the question and the Government’s response.
10. SAM Unique Entity ID: ______________________________.
11. TAXPAYER ID #______________________________.
12. CAGE CODE __________________________________.
13. SYSTEM for AWARD MANAGEMENT (SAM) REGISTRATION: An Active SAM Registration is required of all Department of Defense contractors. SAM registration enables electronic funds transfer of contract payments. If your company is not already actively registered, please register in the SAM database at www.sam.gov. If your company is currently registered and close to expiring, begin/complete the process for SAM registration renewal.
a. A SAM Unique Entity ID is required for SAM registration. If your company does not have a DUNS #, obtain one by calling 800-333-0505.
b. Whether your company is a current or new registrant in the SAM database, your registration must indicate that you are a provider of NAICS 561710, or a NAICS of similar business size, under the Goods – Services section of the registration to be eligible to receive a contract for this solicitation.
c. If the prospective awardee for this request for quotes is not actively registered in the SAM database by close of solicitation, including NAICS 561710, or a NAICS of similar business size, under the Goods – Services section, depending on mission requirements, the government reserves the right to proceed to award to the next otherwise successful actively registered contractor.
d. Within the SAM Representations and Certifications, please ensure you company has selected that you wish to bid on, or currently hold Department of Defense (DoD) issued or DoD funded Contracts. The DFARS provisions in SAM must also be completed by solicitation closing date and time.
e. Prospective contractors who have not completed electronic annual representations and certifications at http://www.sam.gov/ in conjunction with required registration in the System for Award Management (SAM) database, shall complete and submit FAR 52.212-3 Alternative 1 Offeror Representations and Certifications - Commercial Items and DFARS Representations and Certifications in SAM to be eligible to receive an award for this solicitation.
14. Contract Administrator: TBD at time of award.
If you have questions pertaining to this contract after contract award (i.e. questions regarding delivery, invoice procedures, etc.), please request assistance from the Contract Administrator. Be sure to include the contract number in your request for assistance. Requesting contract administration assistance from any other individual could result in a delayed response.
15. Contracting Officer: TBD at time of award.
16. Contracting Officer’s Representative (COR): TBD at the time of Award.
17. The Government intends to evaluate quotes and award a contract without discussions. Therefore, the contractor’s initial offer should contain the contractor’s best terms from a price and technical standpoint.
However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be necessary. The Government may reject any or all quotes if such action is in the public interest and waive informalities and minor irregularities in quotes received.
18. Service Contract Reporting (SCR): Contractors will report manpower data relating to the performance of service contracts into the system for Award Management (SAM) (https://sam.gov) consistent with existing service contract reporting requirement under the federal acquisition regulation subpart 4.17- Service Contracts Inventory. SAM will only enable reporting for entities with contract that meet the SCR threshold at FAR 4.1703. As part of its quote, the vendor must include the estimated total cost (if any) incurred to comply with the Service Contract Reporting requirement.
19. Post Award Conference: In the event the Contracting Officer decides to conduct a Post Award Conference in accordance with DFARS 242.5, the awardee will be notified and will be required to attend. The Contracting Officer’s notification will include specific details regarding the date, time, and location of the conference, any need for attendance by subcontractors, and information regarding the items to be discussed.
20. ABILITYONE DESIGNATED ITEMS: In accordance with 52.208-9, contractors are referred to the web site of the Committee for Purchase from People Who Are Blind or Severely Disabled, the independent federal agency that administers the AbilityOne (formerly Javits-Wagner-O'Day or JWOD) Program for the lists of designated products and services http://abilityone.gov/procurement_list/product_buy.html
21. In accordance with FAR 52.223-2, Affirmative Procurement of Bio-based Products under Services and Construction Contracts, contractors are required to submit annual bio-based reports to the reporting module in the System for Award Management (SAM) at https://www.sam.gov.
22. The “Equal Employment Opportunity Is The Law” notice (poster) referenced in FAR Clause 52.222-
26(b)(3), is located at http://www.dol.gov/ofccp/regs/compliance/posters/pdf/eeopost.pdf .
23. In accordance with FAR Clause 52.222-41(g), the contractor must notify each service employee working on this contract of the minimum wage and fringe benefits required to be paid pursuant to this contract, or shall post a copy of the wage determination and Department of Labor Form WH-1313 in a prominent place at the worksite. The applicable wage determination is incorporated into the contract. The WH-1313 poster is located at http://www.dol.gov/whd/regs/compliance/posters/sca.htm.
24. In accordance with FAR 52.222-42, In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor (29 CFR part 4), this clause identifies the classes of service employees expected to be employed under the contract states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C. 5341 or 5 332.
This Statement is for Information Only. It is not a Wage Determination.
Employee Class Monetary Wage -- Fringe Benefits Pest Controller (Exterminator) WG-7 Step 2
25. Required insurance:
The contractor shall provide, within ten (10) calendar days after contract award. The Contractor shall provide the Certificate of Insurance (COI) via email to the Post Award Contracting Officer and Post Award Contract Specialist. The COI shall be updated and sent to the Post Award Team on an annual basis.
In accordance with FAR clause 52.228-5 entitled, “Insurance--Work on a Government Installation” the following minimum amounts of insurance are required.
Workmen’s Compensation As required by state laws
Employer’s Liability Insurance $100,000 per accident General Liability Insurance - Bodily Injury Liability $500,000 per occurrence
Auto Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $20,000 per occurrence
Contractor shall require the insurance company to specify contract number in the Description of Operation block of the Certificate of Insurance (COI) and the below statement.
"The policies evidencing required insurance shall contain an endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective- (1) For such period as the laws of the State in which this contract is to be performed prescribe; or (2) Until 30 days after the Insurer or the Contractor gives written notice to the Contracting Officer, whichever period is longer."
26. Legal compliance: The Contractor shall comply with all Federal, State, and Local Laws, codes and regulations applicable to his performance under this contract, and shall be solely responsible for all costs associated with said compliance.
27. Contract performance:
Purpose. IAW with FAR Subpart 42.1500 contractor past performance information (PPI) is relevant information for future source selection purposes regarding a contractor’s actions under previously awarded contracts. It includes, for example, the contractor's record of conforming to contract requirements and to standards of good workmanship; the contractor's record of forecasting and controlling costs; the contractor's adherence to contract schedules, including the administrative aspects of performance; the contractor's history of reasonable and cooperative behavior and commitment to customer satisfaction; and generally, the contractor's business-like concern for the interest of the customer. Contractor past performance information is one of the tools that support Army efforts to acquire best value and is used to evaluate performance risk in source selection. The feedback provided by the government to the contractor in collecting PPI, and the knowledge that PPI will be used in future source selection decisions, should result in improved performance and a greater contractor focus on customer satisfaction.
Contractor Performance Assessment Reports System (CPARS): CPARS shall be prepared IAW AFARS Subpart 42 upon physical completion of the contract. If the period of performance will exceed 18 months, an “interim” assessment report shall be prepared at the completion of 12 months performance and annually thereafter until the contract is physically complete. An out-of-cycle or “addendum” report may be prepared if there is a need to record an extraordinary event prior to the next regularly scheduled evaluation or if it is necessary to report a meaningful occurrence during the period between physical completion of the contract and contract closeout. Additionally, addendum reports may be prepared to record contractor’s performance relative to contract closeout and other administrative requirements (e.g.
final indirect cost proposals, technical data, etc.).
Completion Due Date. The government will complete the CPARS within 60 days after the end of the assessment rating period (if applicable).
Evaluators. The Contracting Officer and the Contracting Officer’s Representative will jointly complete the performance assessment.
Contracts Performance Elements. The contractor’s performance shall be assessed in accordance with elements and rating system set forth in AFARS Subpart 42.
Contractor Review. The Contracting Officer will furnish a copy of the CPARS to the contractor requesting that the contractor submit comments, rebutting statements, and/or additional information to the Contracting Officer within 30 calendar days of receipt. Failure to respond within the designated timeframe will be taken as agreement with the assessment.
Contract Concurrence. Where a contractor concurs with, or takes no exception to a CPARS, such report shall be considered final and releasable for use in source selection and other deliberative purposes.
Contractor Rebuttal. Where a contractor takes exception to a performance report, the Contracting Officer will review the contractor’s rebuttal or comments and make appropriate changes. If the Contracting Officer makes changes, the changed rating will be reflected in the narrative. The Contracting Officer will make all reasonable efforts to reconcile the report and the contractor’s comments. However, it is not necessary that they reach agreement on the report where such is clearly impracticable. The contractor’s rebuttal or comments shall be made part of the CPARS.
Resolving Disagreements between the Government and the Contractor. In the event disagreements between the parties regarding the CPARS occur, the Contracting Officer will review the rebuttal and make appropriate changes. If no agreement is reached, the CPARS is forwarded to the Reviewing Official (Director of Contracting) along with the Contracting Officer’s Findings and Recommendation and supporting documentation. The decision of the Reviewing Official is final. Copies of the CPARS and the contractor’s response and review comments, if any, shall be retained as part of the evaluation.
Release of Contractor Performance Evaluation Information. The evaluation will not be released to other than government personnel and the contractor whose performance is evaluated. The performance evaluation information will be input into the applicable module within Contractor Performance Assessment Reporting System (CPARS) database (or Government system in use at time of the evaluation).
Source Selection Information. Departments and agencies will electronically access the CPARS information to support future award decisions.
28. Alternate disputes resolution: In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, Subparagraph (d) (2) (1) (B) (2), the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable, in accordance with the authority and requirements of the ADR Act.
PWS
PERFORMANCE WORK STATEMENT (PWS)
Pest Control Services for Various USAR Facilities in Texas
PART 1
GENERAL INFORMATION
1. General: This is a non-personal services contract to provide pest control services for the following facilities:
TX011 Carl Pipkin ARC–3020 College ST, Beaumont, TX 77701-4694 TX018 Conroe ARC/ASF 62–4724 S Montgomery Air PKWY, Conroe, TX 77303-2298 TX019 Corpus Christi Memorial ARC–4722 McArdle RD, Corpus Christi, TX 78411-3905 TX046 Colbern Memorial ARC–McIntosh (Bldg T-50) FT, Laredo, TX 78040-4343 TX054 LT Luis Garcia Memorial ARC – 600 S. COL Rowe BLVD, McAllen, TX 78501-2810 TX075 Victoria ARC – 406 Ben Jordan ST, Victoria, TX 77901-8637 TX078 Yoakum ARC – 705 Yoakum ST, Yoakum, TX 77995-1932 TX092 Harlingen AFRC – 1300 Teege Ave, Harlingen, TX 78550-4630 TX154 E Houston AFRC – 10949 Aerospace AVE, Houston, TX 77034 TX160 Robstown CHW Facility – 501 North Highway 77, Robstown, TX 78380-6174 TX188 Brownsville AFRC – 600 Woodruff AVE, Brownsville, TX 78520 TX201 San Marcos AFRC – 1220 Clovis Barker RD, San Marcos, TX 78666
TX210 Round Rock AFRC – 651 N Red Bud Lane, Round Rock, TX 78665 TX212 Sinton AFRC – 8096 Highway 77, Sinton, TX 78687 TX232 North Houston ARC – 13960 North Freeway, Houston, TX 77090
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision and other items and non-personal services necessary to perform Pest Control Services as defined in this Performance Work Statement (PWS) except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: The USARMY Reserve strives to maintain their facilities at a level that will give an outstanding initial impression to Military personnel, civilian employees, visitors and the surrounding community.
1.3 Objectives: The objective of this requirement is for the contractor to perform pest control services.
1.4 Scope: The Contractor shall provide pest control services in accordance with the terms, conditions and standards contained herein. All area measurements provided by the Government are estimates only. The Contractor shall be responsible for verifying all measurements and square footage provided on plans and task listings.
1.5 Period of Performance: The period of performance shall be for 1 – 12-month Base Period, 4 – 12-month option periods, and an optional 6-month extension if needed.
1.6 General Information
1.6.1 Quality Control: Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1, Contractor Inspection Requirements).
The Contractor shall develop, implement and maintain an effective Quality Control System, which includes a written Quality Control Plan (QCP). The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government. The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformances; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation. The QCP shall be delivered to the Contracting Office with the Contractor’s proposal. After acceptance of the quality control plan the Contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to the QCP. If changes to the QCP is made after contract award the Contractor shall submit a copy of the new QCP to the Contracting Officer and Contracting Officer Representative within 5 business days of the effective change.
1.6.1.1 Quality Control Plan: The QCP is developed by the Contractor to validate it performs and delivers high-quality service and products (see Federal Acquisition Regulation (FAR) Part 46.105 and 52.246-1, Contractor Inspection Requirements). The Contractor shall submit their QCP to the COR no later than 30 calendar days after award for COR review and approval. Any changes to the QCP shall be approved by the COR prior to implementation. Use of the previous QCP will be available but it is the Contractor’s responsibility to update based on the required information of the QCP. The QCP shall include, but not be limited to the following:
a. The name(s) of the individual(s) who will perform the inspection.
b. An inspection system covering the services stated in the contract comprised of a checklist used in inspecting contract performance during regularly scheduled or unscheduled inspections.
c. The checklist shall include every area of the operation serviced by the contractor as well as every task required to be performed.
d. A system for identifying and correcting deficiencies in the quality of services before the level of performance becomes unacceptable.
e. A file of all inspections conducted by the contractor and the corrective actions taken. The documentation shall be maintained locally and made available upon request.
f. A service guarantee detailing contractor’s commitment to make all reasonable effort to remedy identified problems to be provided with quality control plan. Any and all remedies shall be performed at no additional cost to the government.
g. How the Contractor shall make available to the Government documentation and records, including internal audit reports, Corrective Action Reports, and Preventive Action Reports that impact the quality of products or services offered.
h. Method used to ensure service deficiencies are not repetitive in nature (e.g., root cause identified and corrected, and problem does not reoccur).
i. Customer complaint program: system for identification and correction of validated complaints and to provide feedback to the COR and customer of corrective actions taken.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is a Government only document primarily focused on what the Government must do to assure that the contractor has performed in accordance with the requirements of the contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. Non-conforming services shall be re-performed at no increase in contract price.
If non-conforming services are recurring, cannot be re-performed, or the services fail to achieve the Performance Requirements Summary (PRS) acceptable quality level (AQL) (see A.1.), the Government may reject the nonconforming service(s) and document the contractor’s performance record accordingly. The Government may also issue a Corrective Action Request (CAR) in which the contractor will be required to respond with the development of a Corrective Action Plan (CAP) which identifies the root cause, corrective action (CA) for the root cause, CA for the specific nonconformance, and the date the CAs will be complete. The Government may also reduce the payment to the contractor IAW the PRS or reduce payment to reflect the value of the services performed or may perform the services and charge the Contractor for any related cost incurred or may terminate this contract for default.
1.6.2.1 Non-conforming Services: CARs (formerly Nonconformance Reports) are used for managing contractual nonconformances on ACC administered contracts. Nonconformance occurs when a contractor fails to meet contract or task order terms, conditions and/or specifications. The COR will notify the contractor, in person, each time an unacceptable observation has been recorded and ask the contractor to correct the problem or re-accomplish the service. Resolution of nonconformance discovered at the subcontractor level shall be addressed with the prime contractor. CARs are issued, overseen and closed IAW ACC Acquisition Instruction (AI) and FAR subpart 46.407 nonconforming supplies or services.
1.6.2.1.1 Level I: A Level I CAR describes a deficiency on a product or service and is not a systemic breakdown of a process or system. It includes those nonconformances that are minor in nature and can be promptly corrected by the contractor, present no need for root cause analysis, no determination if other contract requirements are affected, present no need for further preventive action, and do not materially reduce the usability of the supplies, services, construction, or deliverables. While the Government must document the nonconformance and the contractor must correct the nonconformance, further actions and Government follow-up are not required, and no written response from the contractor is needed. Level I CARs are considered closed immediately upon issuance.
1.6.2.1.2 Level II: A Level II CAR describes deficiencies in a contractor’s processes or systems but are not significant deficiencies. Level II CARs shall require the contractor to correct the nonconformance, perform root cause, and develop and provide a Corrective Action Plan (CAP) acceptable to the government. Some examples of systems affected may be quality inspection/management systems, and CBS identified in DFARS 242.70, or issues such as:
• Multiple deficiencies on products or services indicating a systemic issue throughout the process, or,
• An escalation of repetitive Level I CARs for the same or similar nonconformance demonstrating the contractor is failing to institute effective corrective action and/or failing to implement effective quality and/or internal control(s).
1.6.2.1.3 Level III: A Level III CAR describes deficiencies in a contractor’s system that is affecting a contract’s or program’s ability to meet cost, schedule or performance requirements, or are:
• A significant deficiency pursuant to DFARS 252.242-7005(b), “Contractor Business Systems” (CBS), or,
• A failure to respond to Level II CARs, or to remedy a recurring nonconformance.
• The contractor shall be required to provide a CAP that is acceptable to the government.
NOTE: If not resolved satisfactorily, a Level III CAR may result in the initiation of available contractual remedies, such as reductions of payments, cost disallowances, revocation of government assumption of risk of loss, or business management system disapprovals, etc.
1.6.2.1.4 Level IV: A Level IV CAR documents a critical nonconformance of such serious nature that is issued to the contractor’s business segment or corporate management for their attention to both the nonconforming condition and the company’s corrective action, or when a Level III CAR has been ineffective. A Level IV CAR will result in a mandatory review of available contractual remedies, such as cost disallowance, reduction or suspension of payments, revocation of government assumption of risk of loss, CBS disapproval, or suspension of all product and service acceptance activities. Contractual remedies will be implemented IAW applicable FAR/DFARS clauses and/or ACC Acquisition Instructions if applicable. Action to suspend product or service acceptance will be accomplished via a Level IV CAR. The contractor shall be required to provide a CAP that is acceptable to the government.
Overarching CAR Process Flow. The following outlines the normal process flow for the corrective action process.
Follow the steps provided within the Product Data Reporting and Evaluation Program (PDREP) CAR Module User Guide.
NOTE: Steps in subparagraphs (f)-(j) below do not apply to Level I CARs as they are considered closed immediately upon issuance.
a. Identify a contract nonconformance.
b. Create a CAR.
c. Review the CAR.
d. Coordinate and approve the CAR.
e. Issue the CAR to the contractor.
f. Receive and review the contractor’s CAP.
g. Accept/reject the contractor’s CAP.
h. Oversee contractor corrective action using a risk-based approach.
i. Receive notification from the contractor that corrective action is accomplished.
j. Verify corrective action was accomplished satisfactorily.
k. Close the CAR.
The contractor will be notified of Government inspection results. The contractor shall acknowledge receipt of the inspection results. The contractor may be notified of inspection results verbally. Verbal notifications of defective work will be confirmed in writing. When Government inspectors are unable to contact the contractor to notify the contractor of inspection results, acceptance or rejection of work will be made on the basis of the initial inspection.
1.6.2.1.5 Performance Evaluation Meetings; the Project Manager shall meet with the COR prior to start of the contract. However, meetings will be held whenever deficiencies are noted by the COR. A mutual effort will be made to resolve all problems identified.
1.6.3 Federal Government Holidays: Facilities will be closed on Federal Holidays and on training holidays as announced by the Chain of Command or President. If a Holiday falls on a regular workday, the services shall be rescheduled in the same week to either the day preceding or following the Holiday. If these Holidays fall on Saturday, the preceding Friday will be observed. If these Holidays fall on Sunday, the following Monday will be observed. The scheduled holidays are:
New Year’s Day 1st day of January Martin Luther King Jr.’s Birthday 3rd Monday of January Presidents Day 3rd Monday of February Memorial Day Last Monday of May Juneteenth National Independence Day 19th day of June
Independence Day 4th day of July Labor Day 1st Monday in September
Columbus Day 2nd Monday of October Veterans Day 11th Day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
1.6.3.1 Unforeseen Installation Closures: meaning when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Contractor will be notified by the COR of an installation closure. The contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential. When an unforeseen installation closure occurs on a regularly scheduled day of work, the Government shall have the following options:
a. To require the Contractor to perform the work on the following day unless the following day is a Saturday or Sunday and routine work is not scheduled for Saturday or Sunday.
b. To reschedule the work on any day satisfactory to both parties.
c. Forego the work and reduce the contract price to reflect the reduced value of the services performed.
1.6.4 Hours of Operation: The Contractor is responsible for conducting business between the hours of 8:00 am and 4:00 pm (0800-1600) Monday thru Friday except for Federal Holidays as listed in 1.6.3 or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.6.4.1 The contractor shall perform routine pest control services that do not adversely affect occupant health or productivity during normal working hours of operation in the buildings.
1.6.4.2 When it is necessary to perform work outside of the regularly scheduled hours set forth in the IPMP, the contractor shall notify the COR and Alternate Government POC at least one (1) day in advance.
1.6.5 The Government expects to award a Firm Fixed Price (FFP) Contract for the services outlined in this PWS.
1.6.6 Security Requirements: Contracted personnel (to include subcontractors) performing work under this contract must have a favorable national agency investigation at the time of the proposal submission and must maintain the level of security required for the life of the contract. The security requirements are in accordance with the attached Blanket OPSEC Review Cover Sheet.
1.6.6.1 Physical Security: The Contractor shall be responsible for safeguarding all Government Furnished Equipment (GFE), information and property provided for use in performing the requirements of this PWS.
1.6.6.2 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued by the Government to the Contractor as not lost, misplaced and are not used by unauthorized persons.
NOTE: All references to keys include key cards. No keys issued to the Contractor shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of an issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicated keys to the Contracting Officer.
1.6.6.2.1 The Contractor shall prohibit the use of Government issued keys by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit the entrance of persons other than Contractor employees engaged as described in this PWS or as authorized entrance by the Contracting Officer.
1.6.6.3 Lock Combinations: The Contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations.
These procedures shall be included in the Contractor’s Quality Control Plan.
1.6.7 Special Qualifications: The Contractor shall provide pesticide applicators certified and licensed by Federal, State and local regulations as applicable, in the category of pest control in which they are performing and/or applying pesticides. Contractor pesticide applicators shall maintain a current copy of their certification in their possession at all times while conducting pest control operations. Prior to commencement of work, the Contractor shall provide the COR or Contracting Officer with a copy of the Contractor’s license; State certification for each Contractor employee performing pest management services under this contract. The Contractor will submit updates, as necessary. The copy of State certification provided will contain, at the minimum, the following information:
licensee’s full name, license/certification number, pest control categories, and license/certification expiration date.
1.6.8 Anti-Terrorism Program:
1.6.8.1 The Contractor shall allow the Government to conduct periodic inspections to ensure adherence to access control procedures in accordance with DoD Anti-Terrorism Program. 5152.209-4000 DOD LEVEL I
ANTITERRORISM (AT) STANDARDS (FEB 2009).
1.6.8.2 AT Training Qualifications: AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 30 calendar days of contract award and within 45 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: https://atlevel1.dtic.mil/at.
1.6.8.3 iWATCH Training: The Contractor and all associated Subcontractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Administrative and Training Office (ATO)). This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. The Contractor shall coordinate with the COR to get the current copy of this training within 5 days of contract start.
1.6.8.4 iWATCH is simply common awareness. Contract employees can be good sources of information.
iWATCH training would include organization instructions on “things to look for” and a phone number to call in case the contract employees have information regarding possible terrorist or criminal activities. Providing Contractors with awareness materials such as the iWATCH brochure or wallet cards is a cost-effective alternative to training. The card describes suspicious activity and can be modified to include the COR in reporting procedures. Samples of the iWATCH brochure and posters are available on the Anti-terrorism Enterprise Portal (AETP) at https://army.deps.mil/army/sites/PMG/prog/ATEP/iWATCH%20Army/Forms/AllItems.aspx and https://www.army.mil/e2/c/downloads/287489.pdf.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5, Post Award Orientation. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract;
perform inspections necessary in connection with contract performance; maintain written and oral communications with the Contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including Government drawings, designs, and specifications; monitor Contractor's performance and notify both the Contracting Officer and Contractor of any deficiencies; coordinate availability of Government furnished property; and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR or any persons other than the KO do not have the authority to change any of the terms and conditions of the resulting order.
1.6.11 Key Government Personnel information will be provided during the Post Award Kick-Off meeting.
1.6.12 Key Contractor Personnel and Contract Management: The following personnel are considered key personnel by the Government: designated Point of Contact (POC) and an alternate POC. The Contractor shall provide a designated POC and an alternate, who shall be responsible for the competent performance of the work required under the specifications of this contract NLT 5 business days after contract award and as changes occur. The name and contact information of the POC and an alternate, who shall act for the contractor when the POC is absent, shall be designated in writing to the COR. The POC or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The POC or alternate shall be available between 7:30 a.m. to 4:00 p.m. Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. The POC(s) and alternates shall be able to read, write, speak, and understand English.
1.6.12.1 Management Plan: The Contractor shall submit a Management Plan as part of their quote which shall demonstrate a thorough knowledge and a full understanding of the complexity and functions detailed in the PWS and how staffing will be provided to complete the tasks. It shall provide a sound management approach for responding to changing priorities, enhancing customer service, providing adequate staff for a geographically dispersed requirement while ensuring adequate levels of performance are maintained. The final accepted Contractor Management Plan shall become a part of the contract document and shall be incorporated into the contract award document. The Contractor shall implement the plan NLT the performance start date. Any changes to the Contractors Management Plan shall be submitted to the COR for review and approval from the KO prior to incorporation into the contract.
1.6.12.2 Identification of Contractor Employees: The Contractor (to include subcontractors) shall provide each employee an Identification (ID) Badge, which includes at a minimum, the Company Name, Employee Name and a color photo of the employee. ID Badges for Key Contractor Personnel shall also indicate their job title. ID Badges shall be worn at all times while the employee is performing under this contract. Each Contractor (to include subcontractors) shall wear the ID Badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit. The Contractor (to include subcontractors) shall be responsible for collection of ID Badges upon completion of the contract or termination of employee. A listing of issued ID Badges shall be provided to the COR within 5 days of contract award and updated as needed to reflect Contractor and Subcontractor personnel changes. All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13 Supervision of Contractor Employees: The Government will not exercise any supervisor or control over Contractor or Subcontractor employees while performing work under the contract. Such employees shall be accountable solely to the Contractor, not the Government. The Contractor, in turn, shall be accountable to the Government for Contractor or Subcontractor employees.
1.6.14 Data Rights: The Government has unlimited rights to all documents/material produced in the execution of this PWS. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges or ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without prior written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.15 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information
(e.g., cost or pricing information, budget information, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as they deem necessary, including prohibiting the Contractor from participating in subsequent contracted requirements which may be affected by the OCI.
1.7 Approved CPMR and MSDS: The Contractor shall provide the COR with a list of pesticides, herbicides, fungicides and any other chemicals to be used in the performance of this contract with Material Safety Data Sheets (MSDS). The contractor shall provide the list of chemicals and MSDS within 10 business days of contract award.
After award, the Contractor shall report any additional or deletion of chemicals to the COR within 72 hours of the anticipated change for approval. The Government has provided a list of approved products to be used in the execution of this PWS (Attachment 7.6). The Contractor is not authorized to deviate from this approved list without prior approval from the Contracting Officer.
1.8 Adding and Removing Sites: The Government reserves the right to add newly constructed or acquired sites and remove any site planned for divestiture or deemed necessary for closure from this contract. This will be completed via formal contract modification.
1.9 Reduction or Increase of Services: The Government reserves the right to reduce or increase the frequency of services needed at will depending upon need and percentage of occupancy of each building or facility.
1.10 ATOPSEC:
Access and general protection/security policy and procedures.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .