JBLM Cold Storage Trailers Questions.pdf
PDF 37 KB Posted
- Attached to
- JBLM Cold Storage Trailers Federal contract opportunity
- Solicitation number
- W911S825Q0001
About this file
This document appears to be a set of questions and answers related to a federal contract opportunity for the rental of two 16-foot cold storage trailers at Joint Base Lewis-McChord (JBLM).
The key details are:
- The period of performance is November 1, 2024 to February 28, 2025.
- There is no incumbent contractor currently in place.
- The trailers must be able to operate on standard 110V/20A power, as the facility does not have the electrical capacity to support 208V power requirements.
- JBLM Department of Public Works (DPW) electricians are the only personnel authorized to perform any electrical work to support this requirement.
- The contractor is responsible for all maintenance and mechanical failures of the trailers during the rental period.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W911S8-25-Q-0001 Amend 02.pdf | ||
| JBLM Cold Storage Trailers Questions.pdf | ||
| W911S8-25-Q0001 Amend 01.pdf | ||
| PWS_Cold Storage Trailers (Courage Inn DFAC)_FY25.pdf | ||
| JBLM Cold Storage Trailers Questions.pdf | ||
| Attachment 1.pdf | ||
| W911S8-25-Q-0001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JBLM Cold Storage Trailers: Contractor Questions
Question: Reference: Answer:
What is the Period of Performance
1 November 2024 to 28 February 2025
Is there an incumbent There is no Current Contract in place
Will a 20’ Trailer be sufficient if a 16’ is unavailable.
Yes, as long as other specifications are met.
The solicitation mentions a standard 110V/20A power connection. However, we have noticed that many cold storage containers of this size typically require at least 208V.
Could you please confirm if a
208V power source is an available possibility at the base, should it be required for our equipment?
There are cold storage trailers that can be operated from standard 110V/20A power connections. We’re looking for this type of setup due to the accessibility of standard exterior outlets at the location where the trailers are going to be utilized.
Regarding the setup of the power connection, will Joint Base Lewis-McChord provide the electricians necessary to facilitate this, or is it the responsibility of the delivering company to arrange and handle the electrical setup.
The facility where the trailers are going to be utilized does not currently have the electrical capacity to support 208V power supplies. The facilities breaker panels would have to be analyzed to identify whether the panels have significant capacity for additional power, as well as open slots to install the 3-phase breakers. JBLM-DPW electricians are the only personnel authorized to perform any electrical work to support this requirement.