This document provides details for an invitation for bid for HVAC repair services at Building J01164 at Joint Base Lewis-McChord in Washington. The solicitation number is W911S8-21-B-0003 and bids are due no later than 11 June 2021 at 1:00 PM PDT. A pre-bid conference and site visit will take place on 20 May 2021 at 09:30 AM PDT at the building. Attendees must RSVP by 18 May. Questions are due by 24 May 2021. The work includes replacing exhaust units, installing a new exhaust fan and stack, modifying ductwork, and demolishing existing condenser units. Funds are contingent on availability. The agency is the Department of the Army Materiel Command Mission and Installation Contracting Command at Joint Base Lewis-McChord.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
eric.c.coday Callout Demo steam for CCU's back to this location and cap line
Demo condensate line for CCU's back to this location and cap line
Text Box Existing set up to be modified. All drawings are for illustration purposes only. All dimensions to be verified by the KTR unless stated otherwise in the SOW and/or attachments.
Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Line eric.c.coday Rectangle eric.c.coday Callout New equipment stand. Equipment to be minimum 2' above finished floor eric.c.coday Callout New CCU eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Callout New outside air/supply duct. Note: existing supply air duct is 19" x 42" eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Callout New discharge air duct. Rectangular duct from new CCU up to roof truss line; transition to 14" round spiral duct eric.c.coday
Do not block eyewash station access
Existing flex hose. New flex hoses (supply & exhaust) to be mounted and secured similarly to existing. New flex hose length (drop from horizontal round spiral) to be approximately same length as existing flex from drop point.
Existing wall duct box to be modified (typ).
eric.c.coday Line eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Text Box Wall duct box to be modified (typ):
-The existing wall duct box is to be modified such that it is split into two approximately equal halves. One half for the existing (to be replaced) EU's and one half for the new exhaust units.
eric.c.coday Callout Side for existing EU. Opening to be reconfigured to allow for approximately the same amount of surface area as existing.
eric.c.coday
Side for new exhaust unit. opening to be reconfigured as required for new exhaust ductwork and new system pressures.
Existing wall duct box to be modified eric.c.coday Line eric.c.coday Callout Modify ductwork as required for replacement EU's. KTR to account for new pressure drop when submitting on new EU fan/motor eric.c.coday Callout Existing stack eric.c.coday Callout Install new exhaust fan, motor, and stack IAW SOW and attachments. New equipment pad and equipment to be installed adjacent to existing EU's.
eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Rectangle eric.c.coday Text Box Fan & Motor eric.c.coday Text Box Stack eric.c.coday Text Box Equipment Pad eric.c.coday Text Box Ducting
Existing DX condenser units to be demoed IAW SOW
Line
| Photo-0 |
| Photo-1 |
| Misc Pics.pdf |
| Photo-0 |
| Photo-7 |
| Photo-9 |
| Photo-10 |
| Binder1.pdf |
| Photo-0 |
| Photo-1 |
File details come from the government source that posted it. Updated .