W911S820R00030003 JBLM Grounds Maintenance.pdf

PDF 140 KB Posted

Attached to
JBLM Grounds Maintenance Federal contract opportunity
Solicitation number
W911S8-20-R-0003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Joint Base Lewis-McChord

View the file

Other files for this federal contract opportunity

Other files attached to JBLM Grounds Maintenance, newest first.
File Type Posted
W911S820R0003 JBLM Grounds Maintenance.pdf PDF
W911S820R00030001 JBLM Grounds Maintenance.pdf PDF
W911S820R00030002 JBLM Grounds Maintenance.pdf PDF
WD 15-5539 (Rev.-12) 12-23-2019.pdf PDF
TE 8 Workload Historical Data (REV 1) 16 Jan 2020.pdf PDF
W911S820R00030001 JBLM Grounds Maintenance.pdf PDF
Consolidated Question Submission Form with GOV Response.xlsx XLSX spreadsheet
IPMP_update_07_20_16 contains interservice agreement.docx DOCX document
Sign-In Site Visit W911S8-20-R-0003 JBLM Grounds Maint.pdf PDF
PWS JBLM Grounds Maintenance (REV 1) 14 Jan 2020.pdf PDF
TE 3 JBLM Lewis North Area Map.pdf PDF
TE 7 Eearthworks Park & Timber Requirements.pdf PDF
TE 5 JBLM McChord Field Map.pdf PDF
WD 15-5539 (Rev.-11) 07-16-2019.pdf PDF
PWS JBLM Grounds Maintenance 17 Dec 2019.pdf PDF
W911S820R0003 JBLM Grounds Maintenance.pdf PDF
TE 2 JBLM Lewis Main Area Map.pdf PDF
TE 8 Workload Historical Data.pdf PDF
Question Submission Form.xlsx XLSX spreadsheet
TE 1 JBLM Cantonment Map.pdf PDF
TE 4 JBLM Lewis Logistic Center Map.pdf PDF
Attachment A of the PWS 17 Dec 2019.pdf PDF
TE 6 JBLM Commercial Vehicle Access to Joint Base Lewis-McChord.pdf PDF
Technical Experience Proposal Form.docx DOCX document
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See attached Summary of Changes POC: Robert Blair Phone: (253) 966-3518

FAX: (253) 967-3844

e-mail: robert.j.blair.civ@mail.mil

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 21-Jan-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911S820R0003

X 9B. DATED (SEE ITEM 11)

20-Dec-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

21-Jan-2020

CODE

MICC-JB LEWIS-MCCHORD

BUILDING 2015

JOINT BASE LEWIS-MCCHORD WA 98433-9500

W911S8 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911S820R0003

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION SF 1449 - CONTINUATION SHEET

SUMMARY OF CHANGES

a. The purpose of this amendment is to extend the Solicitation Period for Solicitation W911S8-20-R-0003 JBLM Grounds Maintenance.

b. The required response date/time has changed from 23-Jan-2020 12:00 PM PST to 30-Jan-2020 12:00 PM

PST.

c. Previous amendments/ Posting updates:

Jan 21, 2020 07:03 am PST Combined Synopsis/Solicitation (Updated): corrected an issue in FBO where the previous versions of the Solicitation (SF 1449) and the Amendments (SF 30’s) were not accessible to print, fill-in, and sign.

Jan 16, 2020 01:32 pm PST Combined Synopsis/Solicitation (Updated): W911S820R00030002 updated the Wage Determination.

Jan 16, 2020 10:01 am PST Combined Synopsis/Solicitation (Updated): W911S820R00030001 provided Government responses to Questions, copy of Site Visit Sign-In sheet, PWS (REV 1), TE 8 (REV 1).

d. Please ensure to include with your proposal submission, a copy of this SF30 with Blocks 15 A.-C.

Completed.

e. All other terms and conditions remain unchanged.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .