Base Period
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule) | ||||||
| Fort Drum Roofing Requirements | ||||||
| 6 Month Base Period | ||||||
| 1 November 2021 - 30 April 2022 | ||||||
| ELIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT | ||
| PRICE | ESTIMATED AMOUNT | |||||
| A001 | Remove, Dispose (off site) and Replace damaged Metal Roof Deck | |||||
| (Reference Statement of Work SW-4(1)) | 450 | SF | $0.00 | |||
| A002 | Remove, Dispose (off-site) and Replace wood roof substrate sheathing (Reference Statement of Work SW-4(2)) | 450 | SF | $0.00 | ||
| A003 | Inspect, Remove, Dispose (off-site) and Replace wood roof soffit/eave framing and fascia boards members (Reference Statement of Work SW-4(3)) | 240 | BF | $0.00 | ||
| A004 | Remove and Dispose (off-site) solid metal soffit covering and/or exposed wood soffit sheathing (Reference Statement of Work SW-4(4)) | 225 | SF | $0.00 | ||
| A005 | Remove and Dispose (off site) building fascia material and Replacement with new metal fascia material (Reference Statement of Work SW-4(5)) | 150 | LF | $0.00 | ||
| A006 | Install new and complete Structural Standing Seam Metal Roof (SSSMR) System | |||||
| (Reference Statement of Work SW-4(6)) | 180 | SQ | $0.00 | |||
| A006a | Install new wooden purlins (double layers) | |||||
| (Reference Statement of Work SW-4(6a)) | 60 | SQ | $0.00 | |||
| A007 | Remove, Dispose (off-site) and Replace Ethylene-Propylene-Diene-Monomer (EPDM) Elastomeric Membrane Roof System (Reference Statement of Work SW-4(7)) | 356 | SQ | $0.00 | ||
| A008 | Remove, Dispose (off-site) and Replace EPDM Elastomeric Roof Membrane | |||||
| (Reference Statement of Work SW-4(8)) | 60 | SQ | $0.00 | |||
| A009 | Remove, Dispose (off-site) and Replace metal coping | |||||
| (Reference Statement of Work SW-4(9)) | 2,828 | SF | $0.00 | |||
| A010 | Repair holes or small rips in a portion of Thermoplastic Polyolefin (TPO) Roofing Membrane (Reference Statement of Work SW-4(10)) | 30 | SF | $0.00 | ||
| A011 | Remove, Dispose (off-site), Repair and/or Replace damaged or deficient portions of EDPM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(11)) | 450 | SF | $0.00 | ||
| A012 | Repair holes or small rips in a portion of EPDM Roof Membrane | |||||
| (Reference Statement of Work SW-4(12)) | 30 | SF | $0.00 | |||
| A013 | Repair base flashing and open seams | |||||
| (Reference Statement of Work SW-4(13)) | 60 | LF | $0.00 | |||
| A014 | Raise roof mounted equipment | |||||
| (Reference Statement of Work SW-4(14)) | 5 | EA | $0.00 | |||
| A015 | Remove and Dispose (off-site) ballasted EPDM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(15)) | 45 | SQ | $0.00 | ||
| A016 | Remove and Dispose (off-site) built-up roof system material (consisting of several layers – no ballast) (Reference Statement of Work SW-4(16)) | 225 | SQ | $0.00 | ||
| A017 | Repair metal roof mansard knuckles | |||||
| (Reference Statement of Work SW-4(17)) | 9 | EA | $0.00 | |||
| A018 | Repair damaged metal roofing sections | |||||
| (Reference Statement of Work SW-4(18)) | 9 | SF | $0.00 | |||
| A019 | Disconnect and Reconnect Lightning Protection System | |||||
| (Reference Statement of Work SW-4(19)) | 250 | LF | $0.00 | |||
| A020 | Provide 4 inch thick Rigid Insulation | |||||
| (Reference Statement of Work SW-4(20)) | 3,507 | SF | $0.00 | |||
| A021 | Provide 4 inch Rigid Roof Insulation Nail Base | |||||
| (Reference Statement of Work SW-4(21)) | 3,507 | SF | $0.00 | |||
| A022 | Install Perimeter Enhancement System | |||||
| (Reference Statement of Work SW-4(22)) | 518 | LF | $0.00 | |||
| A023 | Cut new Metal Reglet in Masonry or Concrete | |||||
| (Reference Statement of Work SW-4(23)) | 45 | LF | $0.00 | |||
| A024 | Replace broken or damaged roof drains | |||||
| (Reference Statement of Work SW-4(24)) | 3 | EA | $0.00 | |||
| TOTAL AMOUNT FOR ASSIGNED ELINS | $0.00 | |||||
| TOTAL ESTIMATED PERFORMANCE AND PAYMENT BONDS | 1 | EA | 0% | $0.00 | ||
| TOTAL AMOUNT | $0.00 | |||||
| NOTES TO BIDDERS: | ||||||
| 1. DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED | ||||||
| 2. ENTER UNIT PRICES ONLY FOR WORK LINE ITEMS (highlighted yellow) | ||||||
| 3. ENTER CONTRACTOR BONDING RATE (%) ONLY IN THE UNIT PRICE FIELD (highlighted blue) | ||||||
| 4. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: | ||||||
| BF BOARD FEET | ||||||
| EA EACH | ||||||
| LF LINEAR FOOT | ||||||
| SF SQUARE FOOT | ||||||
| SQ SQUARE UNIT |
Option Year 1
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule) | ||||||
| Fort Drum Roofing Requirements | ||||||
| Option Year 1 | ||||||
| 1 May 2022 - 30 April 2023 | ||||||
| ELIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT | ||
| PRICE | ESTIMATED AMOUNT | |||||
| A001 | Remove, Dispose (off site) and Replace damaged Metal Roof Deck | |||||
| (Reference Statement of Work SW-4(1)) | 900 | SF | $0.00 | |||
| A002 | Remove, Dispose (off-site) and Replace wood roof substrate sheathing (Reference Statement of Work SW-4(2)) | 900 | SF | $0.00 | ||
| A003 | Inspect, Remove, Dispose (off-site) and Replace wood roof soffit/eave framing and fascia boards members (Reference Statement of Work SW-4(3)) | 480 | BF | $0.00 | ||
| A004 | Remove and Dispose (off-site) solid metal soffit covering and/or exposed wood soffit sheathing (Reference Statement of Work SW-4(4)) | 450 | SF | $0.00 | ||
| A005 | Remove and Dispose (off site) building fascia material and Replacement with new metal fascia material (Reference Statement of Work SW-4(5)) | 300 | LF | $0.00 | ||
| A006 | Install new and complete Structural Standing Seam Metal Roof (SSSMR) System | |||||
| (Reference Statement of Work SW-4(6)) | 360 | SQ | $0.00 | |||
| A006a | Install new wooden purlins (double layers) | |||||
| (Reference Statement of Work SW-4(6a)) | 120 | SQ | $0.00 | |||
| A007 | Remove, Dispose (off-site) and Replace Ethylene-Propylene-Diene-Monomer (EPDM) Elastomeric Membrane Roof System (Reference Statement of Work SW-4(7)) | 712 | SQ | $0.00 | ||
| A008 | Remove, Dispose (off-site) and Replace EPDM Elastomeric Roof Membrane | |||||
| (Reference Statement of Work SW-4(8)) | 120 | SQ | $0.00 | |||
| A009 | Remove, Dispose (off-site) and Replace metal coping | |||||
| (Reference Statement of Work SW-4(9)) | 5,656 | SF | $0.00 | |||
| A010 | Repair holes or small rips in a portion of Thermoplastic Polyolefin (TPO) Roofing Membrane (Reference Statement of Work SW-4(10)) | 60 | SF | $0.00 | ||
| A011 | Remove, Dispose (off-site), Repair and/or Replace damaged or deficient portions of EDPM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(11)) | 900 | SF | $0.00 | ||
| A012 | Repair holes or small rips in a portion of EPDM Roof Membrane | |||||
| (Reference Statement of Work SW-4(12)) | 60 | SF | $0.00 | |||
| A013 | Repair base flashing and open seams | |||||
| (Reference Statement of Work SW-4(13)) | 120 | LF | $0.00 | |||
| A014 | Raise roof mounted equipment | |||||
| (Reference Statement of Work SW-4(14)) | 10 | EA | $0.00 | |||
| A015 | Remove and Dispose (off-site) ballasted EPDM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(15)) | 90 | SQ | $0.00 | ||
| A016 | Remove and Dispose (off-site) built-up roof system material (consisting of several layers – no ballast) (Reference Statement of Work SW-4(16)) | 450 | SQ | $0.00 | ||
| A017 | Repair metal roof mansard knuckles | |||||
| (Reference Statement of Work SW-4(17)) | 18 | EA | $0.00 | |||
| A018 | Repair damaged metal roofing sections | |||||
| (Reference Statement of Work SW-4(18)) | 18 | SF | $0.00 | |||
| A019 | Disconnect and Reconnect Lightning Protection System | |||||
| (Reference Statement of Work SW-4(19)) | 500 | LF | $0.00 | |||
| A020 | Provide 4 inch thick Rigid Insulation | |||||
| (Reference Statement of Work SW-4(20)) | 7,014 | SF | $0.00 | |||
| A021 | Provide 4 inch Rigid Roof Insulation Nail Base | |||||
| (Reference Statement of Work SW-4(21)) | 7,014 | SF | $0.00 | |||
| A022 | Install Perimeter Enhancement System | |||||
| (Reference Statement of Work SW-4(22)) | 1,035 | LF | $0.00 | |||
| A023 | Cut new Metal Reglet in Masonry or Concrete | |||||
| (Reference Statement of Work SW-4(23)) | 89 | LF | $0.00 | |||
| A024 | Replace broken or damaged roof drains | |||||
| (Reference Statement of Work SW-4(24)) | 5 | EA | $0.00 | |||
| TOTAL AMOUNT FOR ASSIGNED ELINS | $0.00 | |||||
| TOTAL ESTIMATED PERFORMANCE AND PAYMENT BONDS | 1 | EA | 0% | $0.00 | ||
| TOTAL AMOUNT | $0.00 | |||||
| NOTES TO BIDDERS: | ||||||
| 1. DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED | ||||||
| 2. ENTER UNIT PRICES ONLY FOR WORK LINE ITEMS (highlighted yellow) | ||||||
| 3. ENTER CONTRACTOR BONDING RATE (%) ONLY IN THE UNIT PRICE FIELD (highlighted blue) | ||||||
| 4. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: | ||||||
| BF BOARD FEET | ||||||
| EA EACH | ||||||
| LF LINEAR FOOT | ||||||
| SF SQUARE FOOT | ||||||
| SQ SQUARE UNIT |
Option Year 2
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule) | ||||||
| Fort Drum Roofing Requirements | ||||||
| Option Year 2 | ||||||
| 1 May 2023 - 30 April 2024 | ||||||
| ELIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT | ||
| PRICE | ESTIMATED AMOUNT | |||||
| A001 | Remove, Dispose (off site) and Replace damaged Metal Roof Deck | |||||
| (Reference Statement of Work SW-4(1)) | 900 | SF | $0.00 | |||
| A002 | Remove, Dispose (off-site) and Replace wood roof substrate sheathing (Reference Statement of Work SW-4(2)) | 900 | SF | $0.00 | ||
| A003 | Inspect, Remove, Dispose (off-site) and Replace wood roof soffit/eave framing and fascia boards members (Reference Statement of Work SW-4(3)) | 480 | BF | $0.00 | ||
| A004 | Remove and Dispose (off-site) solid metal soffit covering and/or exposed wood soffit sheathing (Reference Statement of Work SW-4(4)) | 450 | SF | $0.00 | ||
| A005 | Remove and Dispose (off site) building fascia material and Replacement with new metal fascia material (Reference Statement of Work SW-4(5)) | 300 | LF | $0.00 | ||
| A006 | Install new and complete Structural Standing Seam Metal Roof (SSSMR) System | |||||
| (Reference Statement of Work SW-4(6)) | 360 | SQ | $0.00 | |||
| A006a | Install new wooden purlins (double layers) | |||||
| (Reference Statement of Work SW-4(6a)) | 120 | SQ | $0.00 | |||
| A007 | Remove, Dispose (off-site) and Replace Ethylene-Propylene-Diene-Monomer (EPDM) Elastomeric Membrane Roof System (Reference Statement of Work SW-4(7)) | 712 | SQ | $0.00 | ||
| A008 | Remove, Dispose (off-site) and Replace EPDM Elastomeric Roof Membrane | |||||
| (Reference Statement of Work SW-4(8)) | 120 | SQ | $0.00 | |||
| A009 | Remove, Dispose (off-site) and Replace metal coping | |||||
| (Reference Statement of Work SW-4(9)) | 5,656 | SF | $0.00 | |||
| A010 | Repair holes or small rips in a portion of Thermoplastic Polyolefin (TPO) Roofing Membrane (Reference Statement of Work SW-4(10)) | 60 | SF | $0.00 | ||
| A011 | Remove, Dispose (off-site), Repair and/or Replace damaged or deficient portions of EDPM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(11)) | 900 | SF | $0.00 | ||
| A012 | Repair holes or small rips in a portion of EPDM Roof Membrane | |||||
| (Reference Statement of Work SW-4(12)) | 60 | SF | $0.00 | |||
| A013 | Repair base flashing and open seams | |||||
| (Reference Statement of Work SW-4(13)) | 120 | LF | $0.00 | |||
| A014 | Raise roof mounted equipment | |||||
| (Reference Statement of Work SW-4(14)) | 10 | EA | $0.00 | |||
| A015 | Remove and Dispose (off-site) ballasted EPDM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(15)) | 90 | SQ | $0.00 | ||
| A016 | Remove and Dispose (off-site) built-up roof system material (consisting of several layers – no ballast) (Reference Statement of Work SW-4(16)) | 450 | SQ | $0.00 | ||
| A017 | Repair metal roof mansard knuckles | |||||
| (Reference Statement of Work SW-4(17)) | 18 | EA | $0.00 | |||
| A018 | Repair damaged metal roofing sections | |||||
| (Reference Statement of Work SW-4(18)) | 18 | SF | $0.00 | |||
| A019 | Disconnect and Reconnect Lightning Protection System | |||||
| (Reference Statement of Work SW-4(19)) | 500 | LF | $0.00 | |||
| A020 | Provide 4 inch thick Rigid Insulation | |||||
| (Reference Statement of Work SW-4(20)) | 7,014 | SF | $0.00 | |||
| A021 | Provide 4 inch Rigid Roof Insulation Nail Base | |||||
| (Reference Statement of Work SW-4(21)) | 7,014 | SF | $0.00 | |||
| A022 | Install Perimeter Enhancement System | |||||
| (Reference Statement of Work SW-4(22)) | 1,035 | LF | $0.00 | |||
| A023 | Cut new Metal Reglet in Masonry or Concrete | |||||
| (Reference Statement of Work SW-4(23)) | 89 | LF | $0.00 | |||
| A024 | Replace broken or damaged roof drains | |||||
| (Reference Statement of Work SW-4(24)) | 5 | EA | $0.00 | |||
| TOTAL AMOUNT FOR ASSIGNED ELINS | $0.00 | |||||
| TOTAL ESTIMATED PERFORMANCE AND PAYMENT BONDS | 1 | EA | 0% | $0.00 | ||
| TOTAL AMOUNT | $0.00 | |||||
| NOTES TO BIDDERS: | ||||||
| 1. DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED | ||||||
| 2. ENTER UNIT PRICES ONLY FOR WORK LINE ITEMS (highlighted yellow) | ||||||
| 3. ENTER CONTRACTOR BONDING RATE (%) ONLY IN THE UNIT PRICE FIELD (highlighted blue) | ||||||
| 4. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: | ||||||
| BF BOARD FEET | ||||||
| EA EACH | ||||||
| LF LINEAR FOOT | ||||||
| SF SQUARE FOOT | ||||||
| SQ SQUARE UNIT |
Option Year 3
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule) | ||||||
| Fort Drum Roofing Requirements | ||||||
| Option Year 3 | ||||||
| 1 May 2024 - 30 April 2025 | ||||||
| ELIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT | ||
| PRICE | ESTIMATED AMOUNT | |||||
| A001 | Remove, Dispose (off site) and Replace damaged Metal Roof Deck | |||||
| (Reference Statement of Work SW-4(1)) | 900 | SF | $0.00 | |||
| A002 | Remove, Dispose (off-site) and Replace wood roof substrate sheathing (Reference Statement of Work SW-4(2)) | 900 | SF | $0.00 | ||
| A003 | Inspect, Remove, Dispose (off-site) and Replace wood roof soffit/eave framing and fascia boards members (Reference Statement of Work SW-4(3)) | 480 | BF | $0.00 | ||
| A004 | Remove and Dispose (off-site) solid metal soffit covering and/or exposed wood soffit sheathing (Reference Statement of Work SW-4(4)) | 450 | SF | $0.00 | ||
| A005 | Remove and Dispose (off site) building fascia material and Replacement with new metal fascia material (Reference Statement of Work SW-4(5)) | 300 | LF | $0.00 | ||
| A006 | Install new and complete Structural Standing Seam Metal Roof (SSSMR) System | |||||
| (Reference Statement of Work SW-4(6)) | 360 | SQ | $0.00 | |||
| A006a | Install new wooden purlins (double layers) | |||||
| (Reference Statement of Work SW-4(6a)) | 120 | SQ | $0.00 | |||
| A007 | Remove, Dispose (off-site) and Replace Ethylene-Propylene-Diene-Monomer (EPDM) Elastomeric Membrane Roof System (Reference Statement of Work SW-4(7)) | 712 | SQ | $0.00 | ||
| A008 | Remove, Dispose (off-site) and Replace EPDM Elastomeric Roof Membrane | |||||
| (Reference Statement of Work SW-4(8)) | 120 | SQ | $0.00 | |||
| A009 | Remove, Dispose (off-site) and Replace metal coping | |||||
| (Reference Statement of Work SW-4(9)) | 5,656 | SF | $0.00 | |||
| A010 | Repair holes or small rips in a portion of Thermoplastic Polyolefin (TPO) Roofing Membrane (Reference Statement of Work SW-4(10)) | 60 | SF | $0.00 | ||
| A011 | Remove, Dispose (off-site), Repair and/or Replace damaged or deficient portions of EDPM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(11)) | 900 | SF | $0.00 | ||
| A012 | Repair holes or small rips in a portion of EPDM Roof Membrane | |||||
| (Reference Statement of Work SW-4(12)) | 60 | SF | $0.00 | |||
| A013 | Repair base flashing and open seams | |||||
| (Reference Statement of Work SW-4(13)) | 120 | LF | $0.00 | |||
| A014 | Raise roof mounted equipment | |||||
| (Reference Statement of Work SW-4(14)) | 10 | EA | $0.00 | |||
| A015 | Remove and Dispose (off-site) ballasted EPDM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(15)) | 90 | SQ | $0.00 | ||
| A016 | Remove and Dispose (off-site) built-up roof system material (consisting of several layers – no ballast) (Reference Statement of Work SW-4(16)) | 450 | SQ | $0.00 | ||
| A017 | Repair metal roof mansard knuckles | |||||
| (Reference Statement of Work SW-4(17)) | 18 | EA | $0.00 | |||
| A018 | Repair damaged metal roofing sections | |||||
| (Reference Statement of Work SW-4(18)) | 18 | SF | $0.00 | |||
| A019 | Disconnect and Reconnect Lightning Protection System | |||||
| (Reference Statement of Work SW-4(19)) | 500 | LF | $0.00 | |||
| A020 | Provide 4 inch thick Rigid Insulation | |||||
| (Reference Statement of Work SW-4(20)) | 7,014 | SF | $0.00 | |||
| A021 | Provide 4 inch Rigid Roof Insulation Nail Base | |||||
| (Reference Statement of Work SW-4(21)) | 7,014 | SF | $0.00 | |||
| A022 | Install Perimeter Enhancement System | |||||
| (Reference Statement of Work SW-4(22)) | 1,035 | LF | $0.00 | |||
| A023 | Cut new Metal Reglet in Masonry or Concrete | |||||
| (Reference Statement of Work SW-4(23)) | 89 | LF | $0.00 | |||
| A024 | Replace broken or damaged roof drains | |||||
| (Reference Statement of Work SW-4(24)) | 5 | EA | $0.00 | |||
| TOTAL AMOUNT FOR ASSIGNED ELINS | $0.00 | |||||
| TOTAL ESTIMATED PERFORMANCE AND PAYMENT BONDS | 1 | EA | 0% | $0.00 | ||
| TOTAL AMOUNT | $0.00 | |||||
| NOTES TO BIDDERS: | ||||||
| 1. DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED | ||||||
| 2. ENTER UNIT PRICES ONLY FOR WORK LINE ITEMS (highlighted yellow) | ||||||
| 3. ENTER CONTRACTOR BONDING RATE (%) ONLY IN THE UNIT PRICE FIELD (highlighted blue) | ||||||
| 4. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: | ||||||
| BF BOARD FEET | ||||||
| EA EACH | ||||||
| LF LINEAR FOOT | ||||||
| SF SQUARE FOOT | ||||||
| SQ SQUARE UNIT |
Option Year 4
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule) | ||||||
| Fort Drum Roofing Requirements | ||||||
| Option Year 4 | ||||||
| 1 May 2025 - 30 April 2026 | ||||||
| ELIN | DESCRIPTION | ESTIMATED QUANTITY | UNIT | UNIT | ||
| PRICE | ESTIMATED AMOUNT | |||||
| A001 | Remove, Dispose (off site) and Replace damaged Metal Roof Deck | |||||
| (Reference Statement of Work SW-4(1)) | 900 | SF | $0.00 | |||
| A002 | Remove, Dispose (off-site) and Replace wood roof substrate sheathing (Reference Statement of Work SW-4(2)) | 900 | SF | $0.00 | ||
| A003 | Inspect, Remove, Dispose (off-site) and Replace wood roof soffit/eave framing and fascia boards members (Reference Statement of Work SW-4(3)) | 480 | BF | $0.00 | ||
| A004 | Remove and Dispose (off-site) solid metal soffit covering and/or exposed wood soffit sheathing (Reference Statement of Work SW-4(4)) | 450 | SF | $0.00 | ||
| A005 | Remove and Dispose (off site) building fascia material and Replacement with new metal fascia material (Reference Statement of Work SW-4(5)) | 300 | LF | $0.00 | ||
| A006 | Install new and complete Structural Standing Seam Metal Roof (SSSMR) System | |||||
| (Reference Statement of Work SW-4(6)) | 360 | SQ | $0.00 | |||
| A006a | Install new wooden purlins (double layers) | |||||
| (Reference Statement of Work SW-4(6a)) | 120 | SQ | $0.00 | |||
| A007 | Remove, Dispose (off-site) and Replace Ethylene-Propylene-Diene-Monomer (EPDM) Elastomeric Membrane Roof System (Reference Statement of Work SW-4(7)) | 712 | SQ | $0.00 | ||
| A008 | Remove, Dispose (off-site) and Replace EPDM Elastomeric Roof Membrane | |||||
| (Reference Statement of Work SW-4(8)) | 120 | SQ | $0.00 | |||
| A009 | Remove, Dispose (off-site) and Replace metal coping | |||||
| (Reference Statement of Work SW-4(9)) | 5,656 | SF | $0.00 | |||
| A010 | Repair holes or small rips in a portion of Thermoplastic Polyolefin (TPO) Roofing Membrane (Reference Statement of Work SW-4(10)) | 60 | SF | $0.00 | ||
| A011 | Remove, Dispose (off-site), Repair and/or Replace damaged or deficient portions of EDPM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(11)) | 900 | SF | $0.00 | ||
| A012 | Repair holes or small rips in a portion of EPDM Roof Membrane | |||||
| (Reference Statement of Work SW-4(12)) | 60 | SF | $0.00 | |||
| A013 | Repair base flashing and open seams | |||||
| (Reference Statement of Work SW-4(13)) | 120 | LF | $0.00 | |||
| A014 | Raise roof mounted equipment | |||||
| (Reference Statement of Work SW-4(14)) | 10 | EA | $0.00 | |||
| A015 | Remove and Dispose (off-site) ballasted EPDM Elastomeric Membrane Roof System (Reference Statement of Work SW-4(15)) | 90 | SQ | $0.00 | ||
| A016 | Remove and Dispose (off-site) built-up roof system material (consisting of several layers – no ballast) (Reference Statement of Work SW-4(16)) | 450 | SQ | $0.00 | ||
| A017 | Repair metal roof mansard knuckles | |||||
| (Reference Statement of Work SW-4(17)) | 18 | EA | $0.00 | |||
| A018 | Repair damaged metal roofing sections | |||||
| (Reference Statement of Work SW-4(18)) | 18 | SF | $0.00 | |||
| A019 | Disconnect and Reconnect Lightning Protection System | |||||
| (Reference Statement of Work SW-4(19)) | 500 | LF | $0.00 | |||
| A020 | Provide 4 inch thick Rigid Insulation | |||||
| (Reference Statement of Work SW-4(20)) | 7,014 | SF | $0.00 | |||
| A021 | Provide 4 inch Rigid Roof Insulation Nail Base | |||||
| (Reference Statement of Work SW-4(21)) | 7,014 | SF | $0.00 | |||
| A022 | Install Perimeter Enhancement System | |||||
| (Reference Statement of Work SW-4(22)) | 1,035 | LF | $0.00 | |||
| A023 | Cut new Metal Reglet in Masonry or Concrete | |||||
| (Reference Statement of Work SW-4(23)) | 89 | LF | $0.00 | |||
| A024 | Replace broken or damaged roof drains | |||||
| (Reference Statement of Work SW-4(24)) | 5 | EA | $0.00 | |||
| TOTAL AMOUNT FOR ASSIGNED ELINS | $0.00 | |||||
| TOTAL ESTIMATED PERFORMANCE AND PAYMENT BONDS | 1 | EA | 0% | $0.00 | ||
| TOTAL AMOUNT | $0.00 | |||||
| NOTES TO BIDDERS: | ||||||
| 1. DETAILED PRICING SCHEDULE MUST BE COMPLETED IN EXCEL FORM. MANUAL CALCULATIONS WILL NOT BE ACCEPTED | ||||||
| 2. ENTER UNIT PRICES ONLY FOR WORK LINE ITEMS (highlighted yellow) | ||||||
| 3. ENTER CONTRACTOR BONDING RATE (%) ONLY IN THE UNIT PRICE FIELD (highlighted blue) | ||||||
| 4. THE FOLLOWING UNIT ABBREVIATIONS ARE DEFINED AS FOLLOWS: | ||||||
| BF BOARD FEET | ||||||
| EA EACH | ||||||
| LF LINEAR FOOT | ||||||
| SF SQUARE FOOT | ||||||
| SQ SQUARE UNIT |
Total Contract Amount
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule) | |||||
| Fort Drum Roofing Requirements | |||||
| ITEM NO | SUPPLIES/SERVIVES | QUANTITY | UNIT | UNIT PRICE | AMOUNT |
| 0001 | Roofing Requirements (Base Period) | 0 | Job | $1.00 | $0.00 |
| 0002 | Performance/Payment Bonds (Base Period) | 0 | Job | $1.00 | $0.00 |
| 0003 | Roofing Requirements (Option Year 1) | 0 | Job | $1.00 | $0.00 |
| 0004 | Performance/Payment Bonds (Option 1) | 0 | Job | $1.00 | $0.00 |
| 0005 | Roofing Requirements (Option Year 2) | 0 | Job | $1.00 | $0.00 |
| 0006 | Performance/Payment Bonds (Option 2) | 0 | Job | $1.00 | $0.00 |
| 0007 | Roofing Requirements (Option Year 3) | 0 | Job | $1.00 | $0.00 |
| 0008 | Performance/Payment Bonds (Option 3) | 0 | Job | $1.00 | $0.00 |
| 0009 | Roofing Requirements (Option Year 4) | 0 | Job | $1.00 | $0.00 |
| 0010 | Performance/Payment Bonds (Option 4) | 0 | Job | $1.00 | $0.00 |
| TOTAL CONTRACT AMOUNT | $0.00 |