Other files
| File |
Type |
Posted |
| Exhibit N UFGS 01 74 19.pdf |
PDF |
|
| Exhibit G UFGS 07 22 00.pdf |
PDF |
|
| Exhibit D 2017-06-01 Fort Drum Installation Planning Standards.pdf |
PDF |
|
| Exhibit A UFGS 05 30 00.pdf |
PDF |
|
| W911S221B8000 Attachment 1 (Statement of Work).pdf |
PDF |
|
| W911S221B8000.pdf |
PDF |
|
| Exhibit K UT-PE3 Drawing.pdf |
PDF |
|
| Exhibit I UFC 3 575 01.pdf |
PDF |
|
| Exhibit F UFGS 07 53 23.pdf |
PDF |
|
| Exhibit J UFGS 26 41 00.pdf |
PDF |
|
| Exhibit C PW-ENG-TYP-ROOF Drawing.pdf |
PDF |
|
| W911S221B8000 Attachment 3 (Wage Determination NY20210022).pdf |
PDF |
|
| Exhibit M UFGS 22 00 00.pdf |
PDF |
|
| Exhibit H UFGS 07 13 53.pdf |
PDF |
|
| Exhibit E UFGS 07 61 14.00 20.pdf |
PDF |
|
| W911S221B8000 Attachment 2 (Detailed Pricing Schedule).xlsx |
XLSX spreadsheet |
|
| Exhibit L UFGS 07 60 00.pdf |
PDF |
|
| Exhibit B UFGS 06 10 00.pdf |
PDF |
|
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it.
Updated .