Q-A_UPS Install_18Sep2026.pdf
PDF 130 KB Posted
- Attached to
- FCC Uninterruptible Power Supply Installation
- Solicitation number
- W911S026QA013
About this file
This document is a Questions and Answers attachment for RFQ #W911S026QA013 for FCC Uninterruptible Power Supply Installation services. The solicitation is a new requirement with no incumbent contractor or previous contract number. The final end user organization is the M&S Division, FCC G-3/5/7 located at Building 950, Room 4080, Fort Eustis, Virginia 23604, with Warren Jones designated as the Government Point of Contact. The RFQ due date is September 21, 2026, with an expected Period of Performance from September 28, 2026 through October 28, 2026.
The Bill of Materials identifies four uninterruptible power supply units to be installed: two SURT192RMXLBP units (serial numbers 5S2514T76851 and 5S2514T76855) and two SURT20KRMXLT units (serial numbers AS2514181608 and AS2514181603), each with a quantity of one. The solicitation specifies that units do not require servicing and clarifies that this is not a service contract renewal, battery replacement service, revitalization service, spare parts procurement, or software renewal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_UPS Install_10Sep2026.pdf | ||
| RFQ_UPS Install_10Sep2026.pdf | ||
| Solicitation - W911S026QA013.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FCC Uninterruptible Power Supply Installation
RFQ #W911S026QA013
Questions and Answers
Is this a brand new contract OR is there an incumbent performing these services?
If not brand new, could you please provide the current / previous contract number?
This is a new requirement.