Text version
CS
| FORT CARSON AIR QUALITY ASSESSMENT FORM | ||||
| Contact The Fort Carson Air Program | ||||
| MAKE SUBMISSIONS TO THE ATTENTION OF EITHER | ||||
| Emma Buccambuso, Air Qualtiy Program Manager | ||||
| E-Mail: | emma.e.buccambuso.civ@mail.mil | |||
| Phone: | 719-526-6601 | |||
| John Wachter, Chief Compliance Branch | ||||
| E-Mail: | john.p.wachter.civ@mail.mil | |||
| Phone: | 719-526-8893 | |||
| Environmental Division Fax: 719.526.2091 | ||||
| Prepared by the FTC Directorate of Public Works - Environmental Division | ||||
| Air Quality Program | ||||
| Version 4.12-0, approved for release 4/1/2012 |
I
| Air Quality Assessment Form | ||||||||
| Version 4.12-0 | ||||||||
| INSTRUCTIONS | ||||||||
| Section 1 | About This Guide | |||||||
| Introduction | ||||||||
| This guide is intended to provide Project Proponents, Contractors, and DPW | ||||||||
| staff with the basic and essential information required to maintain | ||||||||
| compliance with the various AIR EMISSIONS CONTROL regulatory agencies, | ||||||||
| statutory requirements, permits, and sustainability efforts that Fort Carson | ||||||||
| (FTC) must adhere to. | ||||||||
| The AIR QUALITY ASSESSMENT form (AQA) has been integrated into this guide, | ||||||||
| and is the essential reporting and planning document used by the Air Program | ||||||||
| to ensure compliance with the various New Source Review laws, Ozone Depleting | ||||||||
| Substance management, New Source Performance Standards, the FTC Title V | ||||||||
| Operating Permit (95OPEP110), Green House Gas Reporting, General Conformity, | ||||||||
| and Prevention of Significant Deterioration (PSD) regulations. | ||||||||
| Responsibility | ||||||||
| The Proponent / Contractor is responsible for reading and understanding the | ||||||||
| requirements outlined in this guide in there entirety, and then completing | ||||||||
| the applicable portions of the Air Quality Assessment form. | ||||||||
| The Air Program will analyze the project / action to determine if a threshold | ||||||||
| of significance will be exceeded and then document the findings in the NEPA | ||||||||
| review. You may be contacted to gather additional information for further | ||||||||
| analysis. A full general conformity analysis, PSD permit, or Construction | ||||||||
| permit (New Source Review (NSR)) MAY BE REQUIRED. Please be advised that any | ||||||||
| required permit MUST BE RECEIVED PRIOR TO THE START OF CONSTRUCTION, and can | ||||||||
| take anywhere from 120 to 180 days to receive (PSD permits can take 18+ months). | ||||||||
| AQA Form Instructions | ||||||||
| 1.) Complete only the AQA form sections (1 - 6) that are applicable to your project, activity, or task. If a section does not apply, use the check box at the top of the section to indicate so. It is critical that you provide accurate information regarding the proposed activity as it will be come the basis for required permit and NEPA actions. | ||||||||
| 2) Part A and Part B Requirements: The POC for the project is to determine what portions of the AQA to be completed for submission to the FTC Air Program. Depending on the air requirement being addressed, the AQA should be submitted no less than 3 weeks prior to the initiation of the proposed project. NOTE: for air quality permits on new sources, the lead time is 180 days prior to construction. Part B requirements, if applicable, are due at the conclusion of the project or on an annual basis if the project spans multiple years. | ||||||||
| Electronic submission is preferred. | ||||||||
| 3.) Provide all required data in the green shaded cells if applicable. Several | ||||||||
| cells contain conditional formatting and data validation (drop down) that will | ||||||||
| require the preparer to select the most approximate match for the data to be | ||||||||
| provided. | ||||||||
| FTC Project Compliance Guide (Air Program) | 1 - 1 | |||||||
| Section 1 Continued | About This Guide | |||||||
| In the box below place an "X" next to the air quality area you anticipate submitting information to | ||||||||
| the Fort Carson Air Program. By clicking on the title you will be linked to information regarding | ||||||||
| that air quality area. By clicking on the Section Tab you will be hyperlinked to the specific data | ||||||||
| information sheet. | ||||||||
| Section Tab | ||||||||
| Section 1 Data Required for ALL Projects. | Section 1 | |||||||
| Part A Requirements: Due prior to project initiation. | ||||||||
| Dust Control / Land Disturbance / Fugitive Dust | Section 2 | |||||||
| Construction Activities (General Conformity Emissions Analysis) | Section 3 | |||||||
| New Emissions Source and Permit Applicability Review | Section 4 | |||||||
| Air Conditioning & Refrigerant Containing Equipment | Section 5 | |||||||
| Part B Requirements: Due at project conclusion or annually if multiyear project. | ||||||||
| Product / Chemical Use Reporting | Section 6 | |||||||
| Reserved for future use | Section 7 | |||||||
| (This part left blank) | ||||||||
| FTC Project Compliance Guide (Air Program) | 1 - 2 | |||||||
| Section 2 | Fugitive Particulate Matter (Dust) Emissions | |||||||
| Fugitive Particulate Matter (PM) Definition | Back to Menu | |||||||
| Fugitive Particulate Emissions; As defined under Colorado AQCR, means fugitive | ||||||||
| emissions of particulate matter that are the direct or proximate result of | ||||||||
| man's activities, (e.g., Materials left by man from development projects that | ||||||||
| are exposed to the wind or later acted upon by another force such automobile | ||||||||
| traffic, or particulate matter being thrown into the atmosphere by the | ||||||||
| operation of a bulldozer, material handling operations, etc...) | ||||||||
| Air Program Guidance / Requirements | Back to Menu | |||||||
| Land Disturbance Air Permit Application(s) | ||||||||
| Under Colorado air quality regulations, land development refers to all | ||||||||
| land clearing activities, including but not limited to land preparation | ||||||||
| such as excavating or grading, for residential, commercial, or | ||||||||
| industrial development, or oil and gas exploration and production. Land | ||||||||
| development activities release fugitive dust, a pollutant regulated by | ||||||||
| the Air Pollution Control Division (Division) at the Colorado | ||||||||
| Department of Public Health and Environment. | ||||||||
| 1.) For projects lasting in duration for greater than 6 months, or have | ||||||||
| a total disturbed area of greater than 25 acres, proponents and/or | ||||||||
| contractors shall submit either a Land Development Air pollution | ||||||||
| Emissions Notice (LD APEN) or file for project inclusion under the | ||||||||
| State's General Permit. | ||||||||
| 2.) The links below provide an overview of the air pollution reporting | ||||||||
| and permitting requirements that may apply to land development | ||||||||
| activities. | ||||||||
| ► | State Land Disturbance Permit Guidance.pdf | |||||||
| ► | Colorado Land Disturbance Permit Application / APEN.doc | |||||||
| ► | Copy of State General Permit | |||||||
| ALL Construction Activities | Back to Menu | |||||||
| Regardless of the fact that a project is deemed exempt from Land | ||||||||
| Disturbance permitting requirements by the state, all construction | ||||||||
| activities are subject to the following regulations and controls. | ||||||||
| 1.) 20% opacity limit shall apply to all construction activities. | ||||||||
| 2.) No off-property transport emission limitation guidelines shall apply. | ||||||||
| 3.) Water and use controls as necessary to comply with the law. | ||||||||
| FTC Project Compliance Guide (Air Program) | 2 - 1 | |||||||
| Section 2 Continued | Fugitive Particulate Matter (Dust) Emissions | |||||||
| Paved Roads | Back to Menu | |||||||
| Any person who through operations or activities repeatedly deposits | ||||||||
| materials which may create fugitive particulate emissions on a public | ||||||||
| or private paved roadway is required to comply with the following to | ||||||||
| minimize such emissions; | ||||||||
| 1.) Gravel entryways shall be utilized to prevent mud and dirt carryout | ||||||||
| onto paved surfaces. | ||||||||
| 2.) Any mud or dirt tracked out onto paved surfaces shall be cleaned up | ||||||||
| daily. | ||||||||
| Storage and Handling of Materials | Back to Menu | |||||||
| Any owner or operator or any new or existing materials storage and | ||||||||
| handling operation from which fugitive particulate emissions will be | ||||||||
| emitted shall be required to comply with the following regulations and | ||||||||
| controls in order to minimize such emissions; | ||||||||
| 1.) 20% opacity limit shall apply to storage and handling of materials. | ||||||||
| 2.) No off-property transport emission limitation guidelines shall | ||||||||
| apply to storage and handling of materials. | ||||||||
| 3.) Water and use controls as necessary to comply with the law. | ||||||||
| Haul Roads | Back to Menu | |||||||
| FTC has a State enforceable | Fugitive Dust Control Plan | and a mandate | ||||||
| to control emissions to the extent possible and practical from all dirt | ||||||||
| roads on the installation. | ||||||||
| 1.) Contractors which contribute significantly to trip counts (> 40 | ||||||||
| vehicles/day) along any section of the installation's dirt roads for | ||||||||
| hauling purposes will be required to assist in maintaining emissions | ||||||||
| control by watering to the extent that no nuisance emissions are | ||||||||
| created. | ||||||||
| 2.) Contractors shall adhere to posted speed limits on all roads at all | ||||||||
| times. | ||||||||
| Haul Trucks | ||||||||
| Any owner or operator of any new or existing haul trucks from which | ||||||||
| fugitive particulate emissions will be emitted shall be required to; | ||||||||
| 1.) Cover all loads when trucks are leaving the work site (work site | ||||||||
| is defined as the immediate construction area as defined by the permit | ||||||||
| or APEN application). | ||||||||
| FTC Project Compliance Guide (Air Program) | 2 - 2 | |||||||
| Section 2 Continued | Fugitive Particulate Matter (Dust) Emissions | |||||||
| Sandblasting Operations | Back to Menu | |||||||
| Any owner or operator of any new or existing sandblasting activities | ||||||||
| from which fugitive particulate emissions will be emitted shall be | ||||||||
| required to; | ||||||||
| 1.) Comply with the 20% opacity emission limitation guideline. | ||||||||
| 2.) Use control methods inherent to the industry standards to comply | ||||||||
| with the law. | ||||||||
| Demolition Activities | ||||||||
| Employ watering to prevent potentially harmful construction debris and | ||||||||
| fine particulate matter from being transported off-site (off-site is | ||||||||
| defined as any property adjacent to the demolition property). | ||||||||
| FTC Project Compliance Guide (Air Program) | 2 - 3 | |||||||
| Section 3 | General Conformity | |||||||
| Construction Activities (General Conformity Definition) | Back to Menu | |||||||
| For Federal actions a Conformity Determination is required for each pollutant | ||||||||
| where the total of direct and indirect emissions in a nonattainment or | ||||||||
| maintenance area caused by a Federal action would equal or exceed the | ||||||||
| applicable De Minimis or Regional Significance thresholds. 40 CFR 93.153(c) | ||||||||
| contains actions exempt from this requirement. A Record of Non-Applicability | ||||||||
| should be prepared for any action exempted, or where emissions are less than | ||||||||
| the above referenced significance thresholds. | ||||||||
| Air Program Guidance / Requirements | Back to Menu | |||||||
| Conformity Reviews | ||||||||
| All federal actions taking place within the Colorado Springs Carbon | ||||||||
| Monoxide Maintenance Area (FTC Cantonment Area) must undergo a General | ||||||||
| Conformity Analysis. | ||||||||
| All planned projects, actions, and initiatives must be accurately | ||||||||
| captured and conveyed to the DPW-ED Air Program via the Air Quality | ||||||||
| Assessment (AQA) form. This information is required BEFORE the action | ||||||||
| begins so that the Air Program can complete the emissions analysis (if | ||||||||
| applicable) and document the conforming action via the Record of Non- | ||||||||
| Applicability (RONA), or one of the other methods as outlined in the | ||||||||
| reference CFR. | ||||||||
| 1.) Complete the AQA form. General exemptions are given for common | ||||||||
| conforming actions, that under the law do not require an emissions | ||||||||
| analysis. If the form button below is disabled then based on your input | ||||||||
| under the general project description, a conformity review is not | ||||||||
| required. | ||||||||
| 2.) Project Proponents are responsible for contacting the Air Program | ||||||||
| to inquire about the status of their action/project. Please allow up to | ||||||||
| 2 weeks after submission to complete the emissions analysis. | ||||||||
| 3.) In most cases projects will be exempt from the general conformity | ||||||||
| determination requirements. However the analysis must still be | ||||||||
| completed, and records must be maintained by the facility. In most | ||||||||
| circumstances this form will constitute the record of review. | ||||||||
| FTC Project Compliance Guide (Air Program) | 3 - 1 | |||||||
| Section 3 Continued | General Conformity | |||||||
| FTC Project Compliance Guide (Air Program) | 3 - 2 | |||||||
| Section 4 | New Source Review | |||||||
| New Source Review (NSR) & Prevention of Significant Deterioration (PSD) | Back to Menu | |||||||
| Fort Carson must manage contemporaneous changes to potential emissions from | ||||||||
| the installation that would cause or could be defined as a major modification | ||||||||
| under PSD, trigger New Source Performance Standards (NSPS) for a listed source | ||||||||
| category, or require a construction permit under the states NSR rules. | ||||||||
| Air Program Guidance / Requirements | Back to Menu | |||||||
| New Stationary Sources of External Combustion (ECU) | ||||||||
| All new Boilers and H2O Heaters should be equipped or installed with | ||||||||
| certified Low NOx controls capable of reducing these exhaust gases to | ||||||||
| less than 30 ppm (corrected to 3% excess O2). | ||||||||
| For H2O Heaters with heat inputs less than 400,000 btu/hr., the unit | ||||||||
| must be SCAQMD Rule 1146.2 certified and produce not more than 55 ppm | ||||||||
| of NOx (corrected to 3% excess O2). | ||||||||
| Indirect Fired Make-up Air Units (MAU) should not be used on the | ||||||||
| installation since these units do not offer any emissions controls. | ||||||||
| Direct Fired MAUs may be used in limited circumstances but must be ANSI | ||||||||
| 83.4 or Z83.18 certified. | ||||||||
| 1.) All External Combustion Equipment installed, regardless of fuel | ||||||||
| type, must be reported to the DPW-ED Air Program via the equipment | ||||||||
| schedule portion of the Air Quality Assessment (AQA) form. This | ||||||||
| information is required BEFORE construction begins so that compliance, | ||||||||
| permitting, and modification (PSD) determinations can be made. | ||||||||
| New Stationary Sources of Internal Combustion (ICU) i.e. Engines | Back to Menu | |||||||
| All Internal Combustion Engines, emergency or otherwise, not previously | ||||||||
| existing on FTC must receive an Air Emissions Construction Permit prior | ||||||||
| to construction (defined as foundation installation). The Engine must | ||||||||
| be certified by the manufacturer to the appropriate emissions control | ||||||||
| tier, based on the size of the unit and the date of manufacture. | ||||||||
| 1.) All planned Internal Combustion Engines, regardless of fuel | ||||||||
| type and size, must be reported to the DPW-ED Air Program via the | ||||||||
| equipment schedule portion of the Air Quality Assessment (AQA) | ||||||||
| form. This information is required BEFORE construction begins so that | ||||||||
| Air Permit Applications can be submitted early enough to receive | ||||||||
| timely permits and not cause undue delay to the project | ||||||||
| construction schedules. ALL UNITS CURRENTLY REQUIRE A PERMIT. | ||||||||
| FTC Project Compliance Guide (Air Program) | 4 - 1 | |||||||
| Section 4 Continued | New Source Review | |||||||
| Other Stationary Sources of Criteria Pollutant Emissions | Back to Menu | |||||||
| Any other sources of air pollution not specifically identified above | ||||||||
| must be reported to the air program for a regulatory determination. | ||||||||
| The determination will document the source type and the compliance | ||||||||
| status for the source well in advance of it's proposed operation. | ||||||||
| Examples of other sources include, parts washers and weapons cleaners, | ||||||||
| wood working shop tools, welding devices, paint booths, lab equipment, | ||||||||
| and any air pollution control devices to be connected to any existing or | ||||||||
| proposed piece of equipment. | ||||||||
| 1.) Provide initial details on the source via the AQA form. | ||||||||
| FTC Project Compliance Guide (Air Program) | 4 - 2 | |||||||
| Section 5 | Ozone Depleting Substances | |||||||
| Ozone Depleting Substance & Refrigerant Containing Equipment | Back to Menu | |||||||
| The required production and use phase out of Class II Ozone Depleting Compounds | ||||||||
| (ODC) requires that new HVAC equipment manufacturers must utilize Non-ODC | ||||||||
| refrigerants for equipment manufactured after 1/1/2010. Given the useful life | ||||||||
| of the equipment and facilities they support, Fort Carson should avoid | ||||||||
| specifying and using any Class II substance (ex. R-22) containing equipment to | ||||||||
| avoid potentially costly material acquisitions in the future due to supply | ||||||||
| issues. ALL Class I (ex. R-12, Halon) refrigerants are strictly controlled by | ||||||||
| DoD. If Class I substances are used and / or discovered contact the Air | ||||||||
| Program immediately for the requirements!!! | ||||||||
| Air Program Guidance / Requirements | Back to Menu | |||||||
| Refrigerant Types | ||||||||
| HVAC equipment refrigerants should have an Ozone Depletion Potential of | ||||||||
| "0.0". Acceptable (HFC) refrigerant types include: R-23, R-134a, | ||||||||
| R-407a, b, & c, R-410a, & R-507. | ||||||||
| DoD policy requires that ALL Class I and pure HCFC-22 (a Class II | ||||||||
| substance) must remain under DoD control at all times. Class I | ||||||||
| substances may not be stockpiled at an installation. Any portion not | ||||||||
| immediately used must be turned in to the ODC Strategic reserve. Pure | ||||||||
| HCFC-22 may be stored for use on installations or turned in to the ODC | ||||||||
| reserve. | ||||||||
| 1.) All ODS Containing Equipment installed, regardless of refrigerant | ||||||||
| type, must be reported to the DPW-ED Air Program via the equipment | ||||||||
| schedule portion of the Air Quality Assessment (AQA) form. This | ||||||||
| information is required so that compliance and registration | ||||||||
| determinations can be made. | ||||||||
| 2.) Any and all personnel engaging in any maintenance, repair, charging, | ||||||||
| or re-recharging, or any other activity upon any ODC containing | ||||||||
| equipment must be EPA certified, maintain records, and comply with 40 | ||||||||
| CFR parts 82 Subparts A, B, E, and F. This requirement is applicable to | ||||||||
| stationary and mobile assets, and is subject to enforcement under the | ||||||||
| Clean Air Act. | 40 CFR Part 82 -- Protection of Stratospheric Ozone | |||||||
| 3.) All records of certification and service (other than those of KIRA) | ||||||||
| shall be made available to Air Program personnel upon request. Any | ||||||||
| records obtained will remain on site as proof of compliance. | ||||||||
| FTC Project Compliance Guide (Air Program) | 5 - 1 | |||||||
| Section 6 | Chemical & Product Use Reporting | |||||||
| Product Use Reporting | Back to Menu | |||||||
| Per condition 18.2 of the Fort Carson Title V Permit (95OPEP110), "Fort Carson | ||||||||
| shall track emissions of Hazardous Air Pollutants (HAPs) from all insignificant | ||||||||
| activities on a calendar year basis. Calculations shall be completed by | ||||||||
| April 30 for the previous calendar year. For mass balance calculations, the | ||||||||
| permit holder shall assume that the total HAP contained in the raw material | ||||||||
| used is emitted to the atmosphere. HAP content shall be determined from the | ||||||||
| specific Material Safety Data Sheets (MSDSs). Records of emission calculations | ||||||||
| and the MSDS shall be maintained by the permit holder and made available to the | ||||||||
| Division for inspection upon request. For the purposes of this condition, | ||||||||
| insignificant activities shall be defined as any activity or equipment which | ||||||||
| emits any amount of emissions but does not require an APEN (NOT the same as a | ||||||||
| Land development APEN). | ||||||||
| Air Program Guidance / Requirements | ||||||||
| Construction, Maintenance, Renovations, and Other Contracted Functions | ||||||||
| Entities engaged in activities matching the description above must | ||||||||
| provide Fort Carson with a detailed accounting of all materials and | ||||||||
| products used to accomplish the activity or task. This information | ||||||||
| is required to comply with the Title V Permit, and maintain an | ||||||||
| Area Source status for Hazardous Air Pollutant (HAP) emissions. | ||||||||
| For ALL Projects: | ||||||||
| 1.) Reporting Scenario 1: Provide an MSDS for ALL products used during | ||||||||
| the project. Report product units and amounts used on the 1st page of | ||||||||
| the MSDS. | ||||||||
| 2.) Reporting Scenario 2: Completely fill out the "Product Use" section | ||||||||
| of the Air Quality Assessment (AQA) form and provide the data to the Air | ||||||||
| Program at the conclusion of the project. The Air Program can then | ||||||||
| obtain a copy of the specific products' MSDS copy for our compliance | ||||||||
| calculations and records. | ||||||||
| 3.) Reporting Frequency (All Scenarios): For projects starting and | ||||||||
| concluding within the same calendar year (CY), Part B reporting will be | ||||||||
| due at the conclusion of the project. Multiyear projects shall report | ||||||||
| Part B data annually by no later than 1/30 for each subsequent calendar | ||||||||
| year the project extends into, and then submit final CY data immediately | ||||||||
| upon conclusion of the project. | ||||||||
| FTC Project Compliance Guide (Air Program) | 6 - 1 | |||||||
| END |
State Land Disturbance Permit Guidance.pdf Colorado Land Disturbance Permit Application / APEN.doc Copy of State General Permit Fugitive Dust Control Plan 40 CFR Part 82 -- Protection of Stratospheric Ozone Construction Activities (General Conformity Emissions Analysis) Dust Control / Land Disturbance / Fugitive Dust Air Conditioning & Refrigerant Containing Equipment Product / Chemical Use Reporting Section 1 Data Required for ALL Projects.
Construction Activities (General Conformity Emissions Analysis) Air Conditioning & Refrigerant Containing Equipment Product / Chemical Use Reporting New Emissions Source and Permit Applicability Review Product / Chemical Use Reporting Section 2 Section 3 Section 4 Section 5 Section 6 Section 1 Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Back to Menu Construction Activities (General Conformity Emissions Analysis)
S1
| Air Quality Assessment Form - PART A REQUIREMENT | |||||||||
| Version 4.12-0 | |||||||||
| Back to Instructions | |||||||||
| GENERAL PROJECT INFORMATION | |||||||||
| Please enter as complete information as possible regarding the activity. | |||||||||
| Section 1 | Project Name: | ||||||||
| Project Number: | |||||||||
| Project Description: | |||||||||
| Project Start Month: | Project Start Year: | Calculated Duration (days): | |||||||
| Project End Month: | Project End Year: | Calculated work days: | |||||||
| Sub Section 1.2: Contact Information | |||||||||
| Company Name: | Phone Number: | ||||||||
| Address 1: | Fax Number: | ||||||||
| Address 2: | |||||||||
| City, State, Zip: | |||||||||
| Office POC Name: | Phone Number: | ||||||||
| e-mail Address: | |||||||||
| Field POC Name: | Phone Number: | ||||||||
| e-mail Address: | |||||||||
| Sub Section 1.3: Contract Affiliation | |||||||||
| Contractor Type: | Explain: | ||||||||
| Discipline: | Explain: | ||||||||
| Government POC for Project Oversight: | |||||||||
| Government POC Phone Number: | |||||||||
| Type of Governement Oversight: | Explain: | ||||||||
| Other information: | |||||||||
| Back to Instructions |
Back to Instructions Back to Instructions
S2
| Air Quality Assessment Form - PART A REQUREMENT | ||||||||||
| Version 4.12-0 | ||||||||||
| Back to Instructions | ||||||||||
| Section 2 | ||||||||||
| SECTION APPLICABLE? | YES: | NO: | ||||||||
| Land Disturbance Data | ||||||||||
| Total Project Acres: | Total Acers of Disturbed Land: | |||||||||
| Total Acres Disturbed at Any One Time: | ||||||||||
| Date When Earthmoving will: | Commence: | Stop: | ||||||||
| or, Estimated Duration: | Duration Units: | |||||||||
| Land Disturbance Phase Hours Allocations: | Select Allocation Type | |||||||||
| Phase I | Phase II | Phase III | ||||||||
| (Enter the distribution (%) of hours worked during each phase) | Total | 0% | ||||||||
| Other information: | ||||||||||
| Back to Instructions |
Back to Instructions Back to Instructions
S3
| Air Quality Assessment Form - PART A REQUIREMENT | ||||||||||
| Version 4.12-0 | ||||||||||
| Back to Instructions | ||||||||||
| SECTION APPLICABLE? | YES: | NO: | ||||||||
| Section 3 | ||||||||||
| Construction Activities (General Conformity Analysis) | ||||||||||
| Sub Section 3.1: Demolition Data | ||||||||||
| Number of Structures | Start | Number of | ||||||||
| to be Demolished: | Size: | Date | Stories: | Duration: | ||||||
| 1.) Building Number: | sqft: | days: | ||||||||
| 2.) Building Number: | sqft: | days: | ||||||||
| 3.) Building Number: | sqft: | days: | ||||||||
| 4.) Building Number: | sqft: | days: | ||||||||
| 5.) Building Number: | sqft: | days: | ||||||||
| Sub Section 3.2: Worker Trips | ||||||||||
| Total Number of Vehicles Used: | Number of Trips / Day / Vehicle: | |||||||||
| % Vehicles that Use Diesel Fuel: | % of Vehicles that are NOT Trucks: | |||||||||
| Average Round Trip Distance Driven (Post Gate to Worksite per Vehicle (miles): | ||||||||||
| Worker Trip Phase Miles % Allocations: | Select Allocation Type | |||||||||
| Phase I | Phase II | Phase III | ||||||||
| (Enter the distribution (%) of trips commuted per phase) | Total | 0% | 0 | |||||||
| Sub Section 3.3: Other On-Road Trips | ||||||||||
| Total Number of 10 cuyd. Concrete Trucks Required: | Number of water truck Trips / Work Day: | |||||||||
| Total Number of 20 cuyd. Dump Truck Trips Required: | Total Number of Material Delivery Trucks Required: | |||||||||
| Total Number of 40 cuyd. Haul Truck Trips Required: | ||||||||||
| Other / Truck Trip Phase Hours % Allocations: | Select Allocation Type | |||||||||
| Phase I | Phase II | Phase III | ||||||||
| (Enter the distribution (%) of trips made per phase) | Total | 0% | 0 | |||||||
| Sub Section 3.4: Construction Equipment Specifications | Select Allocation Type | |||||||||
| Equipment Type | Qty. | HP | Fuel | Emissions Tier | Hours (ea.) | Phase I | Phase II | Phase III | ||
| Scrapers | ||||||||||
| Graders | ||||||||||
| Dozers | ||||||||||
| Front-End Loaders | ||||||||||
| Skid Loaders | ||||||||||
| Drill/Bore Rigs | ||||||||||
| Tractor/Loader/Backhoes | ||||||||||
| Excavators | ||||||||||
| Aerial Lifts | ||||||||||
| Generators/Compressors | ||||||||||
| Trenchers | ||||||||||
| Compactors/Tampers | ||||||||||
| Pavers (conc. & asph.) | ||||||||||
| Rollers Soil (Vib.) | ||||||||||
| Rollers Soil (Comp.) | ||||||||||
| Rollers Asphalt | ||||||||||
| Other Paving Equip. | ||||||||||
| Forklifts (off road) | ||||||||||
| Cranes | ||||||||||
| Concrete Saws | ||||||||||
| Other Construction Equip. | ||||||||||
| Other information: | ||||||||||
| Back to Instructions |
Back to Instructions Back to Instructions
S4
| Air Quality Assessment Form - PART A REQUIREMENT | |||||||||
| Version 4.12-0 | |||||||||
| Back to Instructions | |||||||||
| SECTION APPLICABLE? | YES: | NO: | |||||||
| NO CONSTRUCTION OR MODIFICATION OF AN EMISSION SOURCE MAY BE EXECUTED WITHOUT | |||||||||
| FIRST OBTAINING A PERMIT FROM CDPHE. ALL UNPERMITED SOURCES WILL SUBJECT THE REQUIRING ACTIVITY | |||||||||
| AND CONTRACT TO CDHE FINES AND PENALTIES. | |||||||||
| DPW-ENVIRONMENTAL WILL OBTAIN THE PERMIT. PLEASE PROVIDE THE REQUESTED DESIGN SPECIFICATIONS WELL IN ADVANCE OF INSTALLATION TO PREVENT PROJECT DELAY WHILE WAITING FOR A PERMIT FROM CDPHE | |||||||||
| Section 4 | |||||||||
| New Source Review (New Emissions Sources) | |||||||||
| Sub Section 4.1: External Combustion Equipment (Boilers, Furnaces, Hot Water Heaters, etc…) | |||||||||
| Equipment / Emissions | Max. Heat Input | Fuel | NOx Emissions | Manufacturer | Model | Action | |||
| Unit Type | Rating (MBtu/Hr) | Type | |||||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| 4 | |||||||||
| 5 | |||||||||
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| 9 | |||||||||
| PTE (lbs) | |||||||||
| Sub Section 4.2: Internal Combustion Equipment (Generators, Other Engines, etc…) | |||||||||
| Equipment / Emissions | Rated BHP | Fuel | Emissions | Manufacturer | Model | Action | |||
| Unit Type | Type | Tier | |||||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| Sub Section 4.3: Other Equipment (select as many as apply) | If Other Please Explain: | ||||||||
| Back to Instructions |
Back to Instructions Back to Instructions
S5
| Air Quality Assessment Form - PART A REQUIREMENT | |||||||||
| Version 4.12-0 | |||||||||
| Back to Instructions | |||||||||
| SECTION APPLICABLE? | YES: | NO: | |||||||
| Section 5 | |||||||||
| Ozone Depletion (Refrigeration Equipment) | |||||||||
| Equipment | System Size | Refrigerant | Number | Charge | Manufacturer | Model | |||
| Type | (Value) | (Units) | Type | of Circuits | (lbs) | ||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| 4 | |||||||||
| 5 | |||||||||
| 6 | |||||||||
| 7 | |||||||||
| 8 | |||||||||
| Back to Instructions |
Back to Instructions Back to Instructions
S6
| Air Quality Assessment Form - PART B REQUIREMENT | ||||||||||
| Version 4.12-0 | ||||||||||
| Back to Instructions | ||||||||||
| SECTION APPLICABLE? | YES: | NO: | ||||||||
| Section 6 | ||||||||||
| Product Use Data | ||||||||||
| Preparer's Name: | Submission Quarter: | Submissions Year: | ||||||||
| Item | Product | National Stock No. | Manufacturer | Container Size | Container | Quantity | ||||
| Number | Name | or Product No. | Units | Used | ||||||
| 1 | ||||||||||
| 2 | ||||||||||
| 3 | ||||||||||
| 4 | ||||||||||
| 5 | ||||||||||
| 6 | ||||||||||
| 7 | ||||||||||
| 8 | ||||||||||
| 9 | ||||||||||
| 10 | ||||||||||
| 11 | ||||||||||
| 12 | ||||||||||
| 13 | ||||||||||
| 14 | ||||||||||
| 15 | ||||||||||
| 16 | ||||||||||
| 17 | ||||||||||
| 18 | ||||||||||
| 19 | ||||||||||
| 20 | ||||||||||
| 21 | ||||||||||
| 22 | ||||||||||
| 23 | ||||||||||
| 24 | ||||||||||
| 25 | ||||||||||
| 26 | ||||||||||
| 27 | ||||||||||
| 28 | ||||||||||
| 29 | ||||||||||
| 30 | ||||||||||
| 31 | ||||||||||
| 32 | ||||||||||
| 33 | ||||||||||
| 34 | ||||||||||
| 35 | ||||||||||
| 36 | ||||||||||
| 37 | ||||||||||
| 38 | ||||||||||
| 39 | ||||||||||
| 40 | ||||||||||
| 41 | ||||||||||
| 42 | ||||||||||
| 43 | ||||||||||
| 44 | ||||||||||
| 45 | ||||||||||
| 46 | ||||||||||
| 47 | ||||||||||
| 48 | ||||||||||
| 49 | ||||||||||
| 50 | ||||||||||
| Additional Comments / Data | ||||||||||
| Back to Instructions |
Back to Instructions Back to Instructions
S7
| Air Quality Assessment Form - RESERVED FOR FUTURE USE | ||
| Version 4.12-0 | ||
| Back to Instructions |
Back to Instructions
Sheet1
File details come from the government source that posted it.