This is a Master Q&A Industry Document serving as a Pre-Bid Request for Information (RFI) Consolidated Log for federal contract solicitation W911RX-26-B-A001, B2478 Kitchenette Installation at Fort Bliss, Texas, dated July 13, 2026. The document contains twelve RFI responses clarifying project scope, specifications, and requirements for contractors preparing bids.

The project requires installation of three kitchenette units across Building 2478: one in the 1st Floor Day Room (Room 102) with a unique layout, and two identical units in the 2nd Floor TV Room (Room 232) and 3rd Floor TV Room (Room 332). Electrical scope includes installing new 200A 120/208V three-phase panelboards on each floor, with specific load requirements for an electric range (240V, 40A), garbage disposal (120V, 10.2A), water bottle filling station (115V, 6A), refrigerator (115V, 20A), and range hood (240V, 50A). Plumbing scope involves connections to existing hot/cold water lines and a 4-inch Cast Iron Drain-Waste-Vent line in the basement, with grease interceptors/traps required per El Paso Water rules. The contractor must install Ansul fire suppression systems for each kitchen hood integrated with the building's fire alarm system, subject to Fort Bliss Fire Department approval. Additional requirements include asbestos abatement and air monitoring (2% Chrysotile asbestos identified in black flooring mastic), Armstrong Kitchen Zone 672 ceiling tiles, and coordination with an occupied facility using normal working hours of 0730 to 1630 with utility cutover restrictions of 14 days' notice and maximum 8-hour duration. As-built drawings will be provided for plumbing and fire alarm systems; site visits are highly recommended but not mandatory.

View the file

Other files

File Type Posted
Solicitation Amendment W911RX26BA0010003 SF 30.pdf PDF
Attachment 10 QA Industry UPDATED 20July2026 W911RX26BA001.docx DOCX document
Attachment 1 SOW B2478 Kitchenette_UPDSATED 20July2026.pdf PDF
Attachment 2 Bldg 2478 - Kitchenette - UPDATED 20July 2026 W911RX26BA001.pdf PDF
Solicitation Amendment - W911RX26BA0010002.pdf PDF
Attachment 1 Updated SOW Rev2 07-15-26 W911RX26BA001.pdf PDF
Solicitation Amendment W911RX26BA0010002 SF 30.pdf PDF
Attachment 2 Updated Drawing of Bldg 2478 - Kitchenette - 07142026 W911RX26BA001.pdf PDF
Solicitation Amendment W911RX26BA0010001 SF 30.pdf PDF
Attachment 9 Site Visit FT Bliss_ Roster_ 3 Basement Pics_ Drawings_ W911RX26BA001.pdf PDF
Solicitation - W911RX26BA001 Professional Appearance.pdf PDF
Attachment 7 Environmental Review 10Apr2026 11B 10116 6P W911RX26BA001.pdf PDF
Attachment 2 Drawing of Building 2478.pdf PDF
Exhibit 2 ENG FORM 4288-R W911RX26BA001.pdf PDF
Attachment 4 iWATCH Trng for Contractors 20190613 W911RX26BA001.pdf PDF
Attachment 6 Asbestos-Lead Survey 09Feb 2012 W911RX26BA001.pdf PDF
Attachment 3 FIRE PREVENTION CONSTRUCTION GUIDE 2025 W911RX26BA001.pdf PDF
Attachment 1 SOW Rev2.pdf PDF
Exhibit 1 CD Package Updated 19May26 W911RX26BA001.pdf PDF
Attachment 8 Davis Bacon Act WD TX20260245 W911RX26BA001.pdf PDF
Exhibit 4 RFI-DPW Template Blank Form V.1.2 (1) W911RX26BA001.pdf PDF
Exhibit 3 Material Approval Submittal_-FILLABLE W911RX26BA001.pdf PDF
Attachment 5 Liquidated Damages_FY26_2478_11B 10116 6P_Kitchenette.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation W911RX-26-B-A001 | B2478 Kitchenette Installation

Master Q&A Industry Document

Pre-Bid Request for Information (RFI) Consolidated Log

Solicitation Number: W911RX-26-B-A001

Project Title: B2478 Kitchenette Installation

Location: Fort Bliss, TX

Document Date: July 13, 2026

General Guidance

The following questions and answers are provided for informational purposes and to clarify the intent of the drawings and specifications. Note: Responses to questions here do not constitute an amendment to the solicitation. If an amendment is required based on an RFI, it will be issued formally via SF30 on SAM.gov.

Table of Contents

Table of Contents

1. Contractor Questions & Government Responses

RFI #01 | Reference: SOW

RFI #02 | Reference: Solicitation

RFI #03 | Reference: SOW

RFI #04 | Reference: Solicitation

RFI #05 | Reference: Solicitation

RFI #06 | Reference: Scope

RFI #07 | Reference: General Requirements

RFI #08 | Reference: Sheets A-100 and A-101

RFI #09 | Reference: Sheets A-100 and A-101

RFI #10 | Reference: Bid Inquiry 1

RFI #11 | Reference: Bid Inquiry 2

RFI #12 | Reference: Bid Inquiry 3

1. Contractor Questions & Government Responses

RFI #01 | Reference: SOW

Date: 07/07/2026

Contractor Question:

The Statement of Work identifies installation of kitchenettes throughout Building 2478; however, the available documents do not clearly identify the exact number of kitchenette units, their floor locations, or individual layouts. Please confirm:

• The total number of kitchenette installations required.

• The exact location of each kitchenette by floor and room number.

• Whether all kitchenettes have identical layouts and equipment requirements.

Contractor Proposed Solution:

Contractor proposes using the Government-provided room layouts and equipment schedules to develop final quantities for cabinetry, countertops, plumbing fixtures, electrical devices, hood systems, and fire suppression systems.

Government Answer:

The drawings indicate a total of three kitchenette installations. The locations are: 1st Floor Day Room

(Room 102), 2nd Floor TV Room (Room 232), and 3rd Floor TV Room (Room 332). The layouts for the

2nd and 3rd-floor kitchenettes are identical; the 1st-floor layout is different.

RFI #02 | Reference: Solicitation

Date: 07/07/2026

Contractor Question:

The solicitation documents reference both:

Please confirm:

• 0V electrical requirements for kitchen equipment; and

• Installation of a 120/208V, 3-phase panelboard.

• Required electrical service voltage and phase configuration.

• Required panelboard size, amperage, and available capacity.

• Electrical load requirements for: Electric range, Garbage disposal, Water bottle filling station, Kitchen equipment.

Contractor Proposed Solution:

Contractor proposes completing electrical design and pricing based on the Government-confirmed electrical load schedule.

Government Answer:

o The drawings specify a 120/208V, 3-phase, 4-wire service for new 200A panelboards on each floor (1C-A, 2C-A, 3C-A). The electric range requires a 2-pole, 116A breaker.

The garbage disposal and water station require 20A GFCI outlets. Refer to the panel schedules and notes on drawing E-100 and E-101 for detailed load information.

Electric range- Nominal 240 Volts, 40 Amps o Garbage disposal – 120Volts, 10.2 Amps o Water bottle filling station – 115Volts, 6Amps o Kitchen equipment -Refrigerator/ 115Volt, 20Amps; Range Hood 240Volts 50Apms

RFI #03 | Reference: SOW

Contractor Question:

The documents require installation of new sinks, faucets, hot/cold water connections, sanitary drainage, and related plumbing systems; however, existing utility connection locations are not identified. Please provide:

• Existing domestic water connection points.

• Existing sanitary sewer/drain connection points.

• Existing plumbing as-built drawings, if available.

• Confirmation whether new core drilling or wall/floor penetrations are anticipated.

Contractor Proposed Solution:

Contractor proposes field verification of existing utilities prior to construction and coordination with

DPW before performing tie-ins.

Government Answer:

The drawings on sheet P-100 indicate the tie-in locations for the 1st-floor kitchenette. The plan is to connect to existing hot/cold water lines above the ceiling and to an existing 4" Cast Iron (CI) Drain-

Waste-Vent (DWV) line in the basement. Core drilling is anticipated (SOW 1.4.22 states "Perform diagnostic core drilling to locate sewer line"). The contractor is responsible for field verifying all existing utility locations and conditions. As-builts drawings will be provided

RFI #04 | Reference: Solicitation

Contractor Question:

Please confirm whether installation of a grease trap or grease interceptor is required for the new kitchenette installations. The current documents do not clearly define whether standard sanitary connections are acceptable or if grease management equipment is required.

Contractor Proposed Solution:

Contractor proposes proceeding with standard sanitary waste connections unless the Government confirms a grease interceptor requirement.

Government Answer:

Yes. The Environmental Review document states that grease interceptors/traps are required for new kitchens to prevent fats, oils, and greases from entering the sanitary sewer, in compliance with El

Paso Water (EPW) rules.

RFI #05 | Reference: Solicitation

Contractor Question:

The solicitation identifies the presence of asbestos-containing materials and lead-based paint within the facility. However, the documents do not define the areas affected by the planned demolition activities.

Please provide:

• Current asbestos survey report.

• Lead-based paint survey information.

• Identification of materials requiring abatement.

• Confirmation whether abatement is included in the contractor’s base scope.

Contractor Proposed Solution:

Contractor proposes performing work only after confirmation of hazardous material requirements and approved mitigation procedures.

Government Answer:

The "Asbestos-Lead Survey 09Feb 2012" is provided. It identifies black flooring mastic as containing

2% Chrysotile asbestos throughout the building. It also identifies lead-based paint on a ladder in the center stairway. The Statement of Work and drawing A-101 state the contractor is responsible for all abatement and air monitoring for materials they disturb.

RFI #06 | Reference: Scope

Contractor Question:

The scope requires installation of kitchen hood fire suppression systems and connection to the existing building fire alarm system. The documents do not clearly identify responsibility for the fire alarm interface. Please clarify:

• Is the contractor responsible for complete fire alarm integration?

• Must work be performed by an approved Fort Bliss fire alarm contractor?

• Are existing fire alarm drawings available?

Contractor Proposed Solution:

Contractor proposes coordination with Fort Bliss Fire Department and the existing fire alarm system contractor before installation.

Government Answer:

1. Yes, the contractor is responsible for providing a new Ansul fire suppression system for each kitchen hood and integrating it with the building's main fire alarm system. All fire protection work must be approved and certified by the Fort Bliss Fire Department (FBFD). As-builts drawings will be provided to the contractor.

RFI #07 | Reference: General Requirements

Contractor Question:

Please clarify the required construction sequence and whether work areas must remain operational during construction. Confirm:

• Required phasing sequence.

• Maximum allowable outage duration.

• Approved working hours for noisy work, demolition, and utility shutdowns.

• Whether temporary kitchen facilities are required.

Contractor Proposed Solution:

Contractor proposes submitting a detailed phasing plan after receiving Government-approved sequence requirements.

Government Answer:

1. The facility will be occupied during construction. The contractor is required to ensure safe access and egress and must submit a detailed construction phasing plan for approval (SOW

2.11.3.2). Normal working hours are 0730 to 1630 (SOW 2.4.1). Utility cutovers and interruptions must be made after normal working hours or on weekends with 14 days advance notice (SOW 2.3.1). 8 hours max duration. Temporary Kitchen is Not required.

RFI #08 | Reference: Sheets A-100 and A-101

Date: 07/10/2026

Contractor Question:

“Contractor to visit site prior to bid” for required for the purposes of abetment and/or air monitoring?

The solicitation sheet says the Site Visit is not mandatory.

Government Answer:

The pre-bid conference and site visit on 06 July 2026 are not mandatory. However, the asbestos survey report indicates the presence of ACM. The Statement of Work (SOW) holds the contractor responsible for abatement and air monitoring if asbestos is disturbed. A site visit is highly recommended to verify site conditions.

RFI #09 | Reference: Sheets A-100 and A-101

Date: 07/10/2026

Contractor Question:

“Contractor must request report in writing prior to bid date”. The bidding documents contain Asbestos

Lead Survey and Asbestos Closeout Report. Does this meet this requirement?

Yes, the inclusion of the "Asbestos-Lead Survey 09Feb 2012" document (Attachment 6) in the solicitation package fulfills this requirement. The contractor's possession of this document, as provided, is sufficient.

RFI #10 | Reference: Bid Inquiry 1

Date: 07/15/2026

Contractor Question:

Please confirm whether there is any potential asbestos abatement scope related to this project.

Specifically, should the contractor carry an allowance for possible asbestos-containing window caulking or similar existing materials that may be disturbed?

The provided Asbestos-Lead Survey from Feb 2012 indicates that exterior window glazing/sealant was sampled and tested negative for asbestos (Sample 30-1). Therefore, an allowance for asbestos window caulking is not required based on the current survey. However, any untested suspect materials encountered during construction must be handled per SOW 1.4.9 (Incidental Encounter) requirements.

RFI #11 | Reference: Bid Inquiry 2

Contractor Question:

Please confirm that all MEP utility work is limited to tie-ins to existing electrical, water, and sewer lines, and that no new utility service upgrades are required.

Government Answer:

Confirmed. The drawings specify tie-ins to existing domestic water and sanitary sewer lines. For electrical, the scope includes installing new 200A 120/208V 3-phase panelboards fed from existing distribution panels. Upgrades to the building's main utility service entrances are not required unless unforeseen field conditions dictate otherwise.

RFI #12 | Reference: Bid Inquiry 3

Contractor Question:

Is there any available information of the product specifications of the existing ceiling tiles? If only a portion of the ceiling is to be replaced, please confirm whether the new ceiling tiles are required to match the existing ceiling in color, texture, pattern, and edge profile, or if replacement with a comparable standard ceiling tile will be acceptable.

SOW Section 1.4.28 specifies: "Provide ceiling tile with Armstrong Kitchen Zone 672 or approve equal.

Provide prelude 15/16” suspension system or equal, as necessary." If only a portion of the ceiling is replaced, the new tiles shall be the specified Armstrong Kitchen Zone 672 (or an approved equal).