Site_Visit_Briefing_19B0008.pptx
PPTX presentation 2 MB Posted
- Attached to
- Mill and Overlay
- Solicitation number
- W911RX-19-B-0008
About this file
Slides used for the Site Visit Briefing
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ACP_Package_2019-05-08.pdf | ||
| TE744.pdf | ||
| Industry_Questions.pdf | ||
| Amendment_1.pdf | ||
| Site_Visit_Attendance_Record.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Site Visit Briefing
W911RX-19-B-0008
Mill and Overlay 3 ACPs Chrystal Artigue Contract Specialist chrystal.a.artigue.civ@mail.mil
(785) 239-4903
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
UNCLASSIFIED
Agenda Introduction/Administrative Remarks Solicitation Review Review ACP Maps
FAR 52.236-3
Summary
UNCLASSIFIED
Introductions and Administrative Remarks Keith Schwanke – Installation Division Chief David Hidebrand – Contracting Officer (KO) Chrystal Artigue – Contract Specialist Greg Rozman – DPW Contracting Officer Representative (COR) Scott Sutherland – Civil Engineer
Solicitation Reveiw
C. Complete Block 14 and 15 on page 2 E. Submit an SF 24 Bid Bond F. Complete forms in Section K- starts on page 69
B. Total Cost Estimate
Solicitation Review
Mailing Address for Sealed Bid and Bid Opening Schedule
Solicitation Review
Ensure that block 30a-c is completed with each copy
Section B - Solicitation
$X,XXX,XXX.XX
Where to put the total for this item number.
Fort Riley Overview
Project#F2-00079-7J Project#F2-00133-7J (Grant ACP) Project#F2-00136-7J
ACP Estes Project#F2-00079-7J
ACP Grant/Huebner Project#F2-00136-7J
West
ACP Grant/Huebner Project#F2-00136-7J
East
ACP Ogden Project#F2-00133-7J
FAR 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984)
(a) The Contractor acknowledges that it has taken steps reasonably necessary to ascertain the nature and location of the work, and that it has investigated and satisfied itself as to the general and local conditions which can affect the work or its cost, including but not limited to
(1) conditions bearing upon transportation, disposal, handling, and storage of materials;
(2) the availability of labor, water, electric power, and roads;
(3) uncertainties of weather, river stages, tides, or similar physical conditions at the site;
(4) the conformation and conditions of the ground; and
(5) the character of equipment and facilities needed preliminary to and during work performance.
The Contractor also acknowledges that it has satisfied itself as to the character, quality, and quantity of surface and subsurface materials or obstacles to be encountered insofar as this information is reasonably ascertainable from an inspection of the site, including all exploratory work done by the Government, as well as from the drawings and specifications made a part of this contract. Any failure of the Contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from responsibility for estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expense to the Government.
(b) The Government assumes no responsibility for any conclusions or interpretations made by the Contractor based on the information made available by the Government. Nor does the Government assume responsibility for any understanding reached or representation made concerning conditions which can affect the work by any of its officers or agents before the execution of this contract, unless that understanding or representation is expressly stated in this contract.
Mission and Installation Contracting Command image2.jpeg image3.png image4.png image5.png image6.png image7.png image8.png image9.png image10.png image11.png image12.png image13.png image14.jpeg image1.jpeg
File details come from the government source that posted it.