ACP_Package_2019-05-08.pdf
PDF 5 MB Posted
- Attached to
- Mill and Overlay
- Solicitation number
- W911RX-19-B-0008
About this file
Revised Maps
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Industry_Questions.pdf | ||
| Amendment_1.pdf | ||
| TE744.pdf | ||
| Site_Visit_Briefing_19B0008.pptx | PPTX presentation | |
| Site_Visit_Attendance_Record.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D e f a u l t
M o d e l : Z
E n g i n e e r i n g
P R
O J
E C
T
M A
N A
G E
M E
N T
R o a d s
C X
X X
X
O g d e n
E s t e s
G r a n t
O
E s t i m a r a w i n g s
T i t l
S h e e t .d g n
F i l e
:3
:5
M a y
S a v e d ð
FEDERAL PROJECT
responsible for verifying quantities for bidding purposes.
Quantities are estimated and for information only. Contractor is
GEARY COUNTY KANSAS
PAVEMENT
GRADING
Civil Engineer PE
COUNTY LINE
CITY LIMITS
STATE OR NATIONAL LINE
PROPERTY LINE
HIGHWAY FENCE
EXISTING FENCE
CONSTRUCTION LIMITS
RIGHT OF WAY LINE
TRAVELED WAY
RAILROADS
TOWNSHIP, SECTION or GRANT LINE
GUARDRAIL
CONVENTIONAL SIGNS
CENTER LINE OF PROJECT
TERRACE
CULVERTS
DROP INLET & STORM SEWER
ACCESS CONTROL
POWER POLE
TELEPHONE POLE
MARSH
HEDGE
TREES
PROFILE ELEVATION
STREAM or CREEK
0.564
0.025
0.540
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROAD
FT. (Includes Equations)
FT.
FT.
FT. MILES
MILES
MILES
FORT RILEY DIRECTORATE OF PUBLIC WORKS
Project Manager, Public Works Engineering Division
Approved
Date
By:
FORT RILEY DIRECTORATE OF PUBLIC WORKS
INDEX OF SHEETS
TITLE SHEET1
TITLE PAGE
XXX-XXX-XXX 1KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
50 1
.1
2019 14
0.501
0.501
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROAD
FT. (Includes Equations)
FT.
FT.
FT. MILES
MILES
MILES
2,978
2,978
2,847
3,288
2,647
2,647
HUEBNER AVENUE
ESTES ROAD
F2-00136-7J
F2-00079-7J
F2-00133-7J
PROJECT NOs.
0.622
0.622
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROAD
FT. (Includes Equations)
FT.
FT.
FT. MILES
MILES
MILES
3,286
3,286
3,286
OGDEN ACP
MILL & OVERLAY
HUEBNER RD, ESTES RD, AND OGDEN ACP
2-3 Estes Mill And Overlay
RD726R Concrete Entrance Standard Sheet
5-6 Grant St. ACP Mill And Overlay
7-10 Ogden ACP Mill And Overlay
Typical Sections
RD628 Flume Inlet/Slope Drain
RD719A Concrete Pavement Joint And Crack Repair
RD635 Combined Curb And Gutter
ADDED KDOT STD. SHT.
REMOVED SPEED HUMPS
REV 1 - 08MAY2019:
Huebner Mill & Overlay
Estes Mill & Overlay
Ogden ACP Mill & Overlay
T
T
T
T
4" PE G
E
G
V C
S S
18" CM ST
24" CM ST
4.00" AC W8" PVC W
8.00" CI W 6.00" CI W
T
T
T
T
Q
Q
HH
HH
P
V
2.5" PVC FM SS
3" PVC W
8" PVC W
2" PVC W
S h e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F J
S B
I L
N
E R
L
Y
T
E N
N I N
E S
E s t i m a a w i n s o
C
C
E s t a d .d g n
F i l e
:3
:1
M a y
S a v e d
77694
STATE
KANSAS
YEARPROJECT N0.
SCALE
75' 150'75' 0
SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
2019 142F2-00079-7J
MILL & OVERLAY
ACP TO APENNINES
ESTES ROAD
10+00 15+00 20+00 25+00 30+00
35+00 40+00
45+00
ESTES RD
V
IC
T O
A R
M
IS
T E
A P
E N
N
IN
E S
K
IT
ESTES RD
S c a le : 1
M A
T
H
IN
E
M A
T
E
ESTES ROAD - EAST
ESTES ROAD - WEST
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Note: Exist. Utilities For Information Only
100'
117'
STA 10+00
BEGIN MILL AND OVERLAY
STA 33+85
END MILL AND OVERLAY
85'
T
Y P
30'
R
R
40' TYP.
T
Y P
R
BY OTHERS
CONCRETE ENTRANCE
3,750 SQYD
REPAIR ROCK EDGE WEDGE AS NEEDED
85 SQYD
SEE KDOT STD SHEET RD726R
INSTALL 9" CONCRETE APPROACH
5,200 SQYD
MILL AND OVERLAY 2" ASPHALT
485 SQYD TOTAL
SEE KDOT STD SHEET RD726R
INSTALL 2x 9" CONCRETE APPROACHES
STA 29+39
END MILL & OVERLAY
STA 30+07
BEGIN MILL & OVERLAY
STA 39+58
BEGIN MILL & OVERLAY
STA 42+88
END MILL & OVERLAY
2,925 SQYD
REPAIR ROCK EDGE WEDGE AS NEEDED
880 SQYD
MILL AND OVERLAY 2" ASPHALT
1,010 SQYD
MILL AND OVERLAY 2" ASPHALT
60. CONCRETE PAVEMENT (9" UNIFORM)(AE) (570 SQYD)
29. AGGREGATE BASE (AB-3)(4") (570 SQYD)
48. GEOSYNTHEITC REINFORCEMENT (FOR BASE) (570 SQYD)
14. COMMON EXCAVATION (RURAL SMALL) (200 CUYD)
CONCRETE APPROACHES
71. HMA COMMERCIAL GRADE (CLASS A)(PATCHING) (120 TONS)
29. AGGREGATE BASE (AB-3)(4") (355 SQYD)
48. GEOSYNTHETIC REINFORCEMENT (FOR BASE) (355 SQYD)
SEE TYPICAL SECTION
FULL DEPTH REPAIR (~5%)
70. HMA COMMERCIAL GRADE (CLASS A) (850 TONS)
72. MILLING (ASPHALT)(2")(TRANS. TO CAMP FUNSTON) (7,100 SQYD)
2" MILL & OVERLAY
REPAIR EDGE WEDGE AS NEEDED
OVERLAY 2" ASPHALT
INSTALL 2x CONCRETE APPROACHES
FULL DEPTH REPAIR ASPHALT AS NEEDED
MILL 2" ASPHALT
70. HMA COMMERCIAL GRADE (CLASS A) (5 TONS)
48. GEOSYNTHETIC REINFORCEMENT (FOR BASE) (20 SQYD)
29. AGGREGATE BASE (AB-3)(4") (20 SQYD)
389. FLOWABLE FILL (LOW STRENGTH) (10 CUYD)
4. REMOVAL OF EXISTING STRUCTURES (2 EA)
ACTIVE BARRIER REMOVALS
384. PAVEMENT EDGE WEDGE (ROCK) (100 TONS)
14. COMMON EXCAVATION (RURAL SMALL) (75 CUYD)
EDGE WEDGE
BACKFILL AND FULL DEPTH PATCH ASPHALT
REMOVE EXISTING ACTIVE BARRIERS x2
T
T
T
T
4" PE G
V C
S S
18" CM ST
24" CM ST
4.00" AC W8" PVC W
8.00" CI W 6.00" CI W
T
T
T
T
Q
Q
HH
HH
P
2.5" PVC FM SS
3" PVC W
8" PVC W
2" PVC W
S h e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
S
E R
L
T
E N
N I N
E S
E s t i m a a w i n
C
C
E s t a d .d g n
F i l e
:3
M a y
S a v e d
77694
STATE
KANSAS
YEARPROJECT N0.
SCALE
75' 150'75' 0
SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
2019 143F2-00079-7J
MARKING
ACP TO APENNINES
ESTES ROAD
ESTES RD
V
IC
T O
A R
M
IS
T E
A P
E N
N
IN
E S
K
IT
ESTES RD
S c a le : 1
M A
T
E
M A
T
E
ESTES ROAD - EAST
ESTES ROAD - WEST
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Note: Exist. Utilities For Information Only
136. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(12") (100 LNFT)
138. PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(4") (5,750 LNFT)
133. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(4") (5,750 LNFT)
4" DOUBLE YELLOW LINE
12" WHITE LINE
4" WHITE LINE
4" DOUBLE YELLOW LINE 4" WHITE LINE
4" WHITE LINE
4" DOUBLE YELLOW LINE
4" WHITE LINE
4" DOUBLE YELLOW LINE
f a u l t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
S
E R
L
T
E N
N I N
E S
E s t i m a a w i n
C
C r d
R .d g n
F i l e
:4
:4
A p r
S a v e d
5'-0"
3" 3"
Variable
"Y" (Variable)
(Approach Slab)
45° to 90° for one-way operation
60° to 90° for two-way operation
Match thickness at back of Type || Curb & Gutter.
SECTION B-B
SECTION A-A
"Y
V a ri a b le
Normal Width
B
FL of Gutter
TYPICAL PLAN FOR
NORMAL ENTRANCE PAVEMENT
A
A
B
Note: Value of "W" for Normal entrance.
13' min. for Private entrance.
16' min. for Alley.
40' max.
"W" + 5' = Length of Type || Combined Curb &
(M ax
S la b
(A p p ro a c h
"Y (V a ri a b le
"W
1.4 W = Length of Type || Combined Curb & Gutter
B
A
B
TYPICAL PLAN FOR
SKEWED ENTRANCE PAVEMENT
See General Note
A ì
W4 x W4
Welded wire reinforcement
Welded wire reinforcement
WWR 6 x 6-
STATE
KANSAS
YEARPROJECT N0. SHEET NO.
DATE REVISIONS BY APP'DNO.
KANSAS DEPARTMENT OF TRANSPORTATION
DESIGNED
DETAILED
DESIGN CK. DETAIL CK.
QUANTITIES
QUAN.CK.
TRACED
TRACE CK.
APP'D.
SHEETS
TOTAL
ALLEY & ENTRANCE PAVEMENT
J.O.B.
J.O.B.
6 S.W.K.Changed Class to Grade conc., mesh3-30-05
S.W.K.
7 S.W.K.10-20-10 Add. macro fiber opt., General note
Sta. shown on plans.
Normal Axis WWR 6 x 6-
W4 x W4
WWR 6 x 6-
WWR 6 x 6-
W4 x W4
S la b
(A p p ro a c h
See General Note
FHWA APPROVAL
8 2-23-17 T.T.R.Rev. Gen. Note
SCOTT W. KING
S.W.K.9 10-31-17 A.L.R.Joint Filler Type C Added
3-5-18 toward the street at 2% or flatter.
Where sidewalk is constructed through an entrance slope sidewalk
Standard Specifications for macro fiber and dosage requirements.
Welded wire can be substituted with a macro fiber. See KDOT
sq. ft..
Approx. weight of welded wire reinforcement = 58 lbs. per 100 of the approach slab into the sidewalk or alley.
No tie bars or wire reinforcement should extend through the joint reinforcement and/or tie bars.
Use chairs for correct vertical placement of welded wire to welded wire fabric through approach slab joints.
Use #4 x 2'-0" deformed tie bars @ 12" spacing as an alternate entering and leaving the entrance, minimum joint spacing is 6 feet.
15' in width. Place joints on wider slabs to help guide vehicles
Construct a longitudinal tied joint at W/2 on slabs greater than subgrade paper and joint parting strips are not required.
pavement on the project, Concrete Grade 3.0 (AE) may be used, Where valley gutter,alley,and/or entrance pavement is the only concrete 1" expansion joint.
Use 1" preformed Expansion Joint Filler (Type B or C) for as shown regardless of sidewalk location.
driveway pavement width. The 5' concrete approach slab is shaped dimension "Y". Beyond this limit match normal alley or entrance approach slab, follow the extension lines shown to the limit of
Where entrance pavement is required to extend beyond the 5'
Construct entrance approach slab unless otherwise shown.
The angles may be varied to fit special conditions.
GENERAL NOTES
D/2 á ½•"
W (For normal Entrance or Alley)
Gutter or 1½•" Monolithic Edge Curb
W4 x W4
°5 4 5̂4 or 1½•" Monolithic Edge Curb. ( Use nearest foot)
½ "W
½ "W
D/2 á ½•"
K D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 03-26-2018
F.L. of Gutter
C o n tr J t.
C o n tr J t.
Limit of Entrance Pavement
RD726 R
RD726
Limit of Entrance Pavement
2019 144F2-00079-7J
6" Compacted Subgrade (Type B, MR-90)
Geosynthetic Reinforcement (For Base)9" Concrete Pavement
4" AB-3 Aggregate Base
TYPICAL SECTION
CONCRETE ENTRANCE
e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
S
E R
L
A
T E
E s t i m a a w i n g s
G r a a
O .d g n
F i l e
:1
:2
M a y
S a v e d
T
8" BI KGS HP GAS
4" KGS HP GAS
" P
V C
S S
3" PVC W
E G
UNION PACIFIC RAILROAD
WEST MILL & OVERLAY
GRANT AVE ACP
F2-00136-7J 5 14KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
SCALE
60'030' 30'
10+00
15+00
60+00 65+00
HUEBNER RD
M A
T
E
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Note: Exist. Utilities For Information Only
BEGIN CONCRETE PAVEMENT
STA 59+67 END M&O
STA 10+00 BEGIN M&O
STA 65+40 END PROJECT
DASHED 4" WHITE LINE
DASHED 4" WHITE LINE
12" WHITE LINE
3x 4" WHITE LINE
4" YELLOW LINE
4" YELLOW LINE
4" WHITE LINE
4" WHITE LINE
BACKFILL AND FULL DEPTH PATCH ASPHALT
REMOVE EXISTING ACTIVE BARRIERS
4" YELLOW LINE
BACKFILL AND INSTALL CONCRETE PAVEMENT
REMOVE EXISTING ACTIVE BARRIER
Sc al e:
0'
5,400 SQYD THIS PAGE
OF ASPHALT PAVEMENT
MILL AND OVERLAY 2"
1,510 SQYD
REPAIR CONCRETE CRACKS
REPAIR SPALLED JOINTS
RESEAL CONCRETE JOINTS
REPAIR SLOPE PROTECTION WITH 4" AGGREGATE (D50)
CONSTRUCT SLOPE DRAINS (SEE KDOT STD SHT RD628)
CONSTRUCT 2x FLUME (SEE KDOT STD SHT RD628)
CONSTRUCT TYPE I C&G (SEE KDOT STD SHT RD635)
FILL VOIDS UNDER APPROACH SLABS WITH FLOWABLE FILL
REMOVE EXISTING ASPHALT PAVEMENT
61. CONCRETE PAVEMENT (12" UNIFORM)(AE) (20 SQYD)
70. HMA COMMERICAL GRADE (CLASS A) (5 TONS)
48 GEOSYNTHETIC REINFORCEMENT (FOR BASE) (40 SQYD)
29. AGGREGATE BASE (AB-3) (4") (40 SQYD)
389. FLOWABLE FILL (LOW STRENGTH) (40 CUYD)
4. REMOVAL OF EXISTING STRUCTURES (3 EA)
-ACTIVE BARRIER REMOVALS
355. SLOPE PROTECTION (RIPRAP STONE)(4") (20 CUYD)
323. SLOPE DRAIN (CONCRETE) (50 LNFT)
322. FLUME INLET (CONCRETE) (2 EA)
330. C&G, COMBINED (AE)(TYPE I) (50 LNFT)
389. FLOWABLE FILL (LOW STRENGTH) (30 CUYD)
21. ROCK EXCAVATION (10 CUYD)
-REPAIR SLOPE PROTECTION
384. PAVEMENT EDGE WEDGE (ROCK) (100 TONS)
-REPAIR EDGE WEDGE AS NEEDED
138. PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(4") (1,000 LNFT)
136. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(12") (75 LNFT)
133. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(4") (2,400 LNFT)
-PAVEMENT STRIPING
378. SEALING PCCP CRACKS (>1/8") (100 LNFT)
367. PCCP JOINT AND CRACK PATCHING (FULL DEPTH)(9") (5 SQYD)
369. PCCP JOINT AND CRACK PATCHING (PARTIAL DEPTH) (10 SQYD)
380. SEALING PCCP JOINTS (TRANSVERSE) (1,000 LNFT)
379. SEALING PCCP JOINTS (LONGITUDINAL) (580 LNFT)
-CONCRETE JOINT SEALING (SEE KDOT STD SHT RD719A)
71. HMA COMMERCIAL GRADE (CLASS A)(PATCHING) (90 TONS)
29. AGGREGATE BASE (AB-3)(4") (275 SQYD)
48 GEOSYNTHETIC REINFORCEMENT (FOR BASE) (275 SQYD)
SEE TYPICAL SECTION
-ASPHALT PAVEMENT FULL DEPTH REPAIR (~5%)
70. HMA COMMERCIAL GRADE (CLASS A) (650 TONS)
72. MILLING (ASPHALT) (2") (5,400 SQYD)
-2" ASPHALT MILL AND OVERLAY
e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
S
E R
L
A
T E
E s t i m a a w i n g s
G r a
O .d g n
F i l e
:3
M a y
S a v e d
T
T
8.00" BI G
KP&L - HP
" S
S
F
O R
IN
" C
M
BR20
EAST MILL & OVERLAY
GRANT AVE ACP
F2-00136-7J 6 14KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
SCALE
60'030' 30'
20+00
50+00 55+00
25+00
C U S
T
M A
T
E
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Note: Exist. Utilities For Information Only
6,075 SQYD THIS PAGE
2" ASPHALT PAVEMENT
MILL AND OVERLAY
DASHED 4" WHITE LINE
STA 50+00 BEGIN M&O
STA 24+33 END M&O
SOLID 24" STOP BAR
END M&O
STA 22+21 60' LT
END M&O
STA 22+24 63' RT
END M&O
STA 20+56 48' RT
DASHED 4" WHITE LINE
2x 4" WHITE LINE
4" WHITE LINE
4" WHITE LINE
4" WHITE LINE
4" DOUBLE YELLOW LINE
4" YELLOW LINE
4" WHITE LINE
12" WHITE LINE
4" YELLOW LINE 3x 4" WHITE LINE
4" DOUBLE YELLOW LINE
2x 4" YELLOW LINE
S ca le : 1
384. PAVEMENT EDGE WEDGE (ROCK) (100 TONS)
-REPAIR EDGE WEDGE AS NEEDED
170. PAVEMENT MARKING SYMBOL (INT. GRADE)(WHITE)(THRU ARROW) (3 EACH)
162. PAVEMENT MARKING SYMBOL (INT. GRADE)(WHITE)(LEFT ARROW) (3 EACH)
138. PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(4") (2,000 LNFT)
137. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(24") (175 LNFT)
136. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(12") (120 LNFT)
133. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(4") (2,000 LNFT)
-PAVEMENT STRIPING
71. HMA COMMERCIAL GRADE (CLASS A)(PATCHING) (100 TONS)
29. AGGREGATE BASE (AB-3)(4") (305 SQYD)
48. GEOSYNTHETIC REINFORCEMENT (FOR BASE) (305 SQYD)
-ASPHALT PAVEMENT FULL DEPTH REPAIR (~5%)
70. HMA COMMERCIAL GRADE (CLASS A) (725 TONS)
72. MILLING (ASPHALT) (2") (6,075 SQYD)
e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
D
E R
L A
Y
E s t i m a a w i n g s
O g d
O .d g n
F i l e
:2
M a y
S a v e d
30" CMP ST
3.
00"
PVC
W
HUEBNER RD
STATE
KANSAS
YEARPROJECT N0.
SCALE
30' 60'30' 0
SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
2019 147F2-00133-7J
MILL & OVERLAY
OGDEN ACP
70+00 75+00
M A
T
E
S c a le
BACKFILL AND FULL DEPTH PATCH WITH ASPHALT
REMOVE EXISTING ACTIVE BARRIERS
2" MILL AND OVERLAY ASPHALT PAVEMENT
CHIP SEAL ASPHALT PAVEMENT
SOLID 12" WHITE MARKING
2x SOLID 4" WHITE MARKING
2x SOLID 4" YELLOW MARKING
SOLID 12" YELLOW MARKING
BEGIN MILL AND OVERLAY
STA 70+00
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Note: Exist. Utilities For Information Only
70. HMA COMMERICAL GRADE (CLASS A) (5 TONS)
29. AGGREGATE BASE (AB-3) (4") (16 SQYD)
389. FLOWABLE FILL (LOW STRENGTH) (20 CUYD)
4. REMOVAL OF EXISTING STRUCTURES (2 EA)
-ACTIVE BARRIER REMOVAL
141. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(12") (200 LNFT)
138. PAVEMENT MARKING (MULTI-COMPONENT)(YELLOW)(4") (6,500 LNFT)
136. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(12") (200 LNFT)
133. PAVEMENT MARKING (MULTI-COMPONENT)(WHITE)(4") (8,800 LNFT)
-PAVEMENT STRIPING
67. MANIPULATION (S.A.S.T) (CHIP SEAL) (7,500 SQYD)
-SHOULDER SEAL COAT
71. HMA COMMERCIAL GRADE (CLASS A)(PATCHING) (510 TONS)
29. AGGREGATE BASE (AB-3)(4") (1,550 SQYD)
48 GEOSYNTHETIC REINFORCEMENT (FOR BASE) (1,550 SQYD)
SEE TYPICAL SECTION
-ASPHALT PAVEMENT FULL DEPTH REPAIR (~10%)
70. HMA COMMERCIAL GRADE (CLASS A) (1,850 TONS)
72. MILLING (ASPHALT) (2") (15,500 SQYD)
e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
D
E R
L A
Y
E s t i m a a w i n g s
O g d
O .d g n
F i l e
:2
M a y
S a v e d
T T
EG
4" PVC SS
30" CM ST
21" CM ST
" x
" R
C B
S T
3.00"
PVC W
STATE
KANSAS
YEARPROJECT N0.
SCALE
30' 60'30' 0
SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
2019 148F2-00133-7J
MILL & OVERLAY
OGDEN ACP
80+00
85+00
M A
T
E
M A
T
E
S c a le 1"
MILL AND OVERLAY 2" ASPHALT PAVEMENT
2x SOLID 4" YELLOW MARKING
SOLID 12" WHITE MARKING
SOLID 12" YELLOW MARKING
SOLID 4" WHITE MARKING
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Note: Exist. Utilities For Information Only
CHIP SEAL ASPHALT SHOULDERS
e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
D
E R
L A
Y
E s t i m a a w i n g s
O g d
O .d g n
F i l e
:2
M a y
S a v e d
KANSAS POWER AND LIGHT 34.5 KV
STATE
KANSAS
YEARPROJECT N0.
SCALE
30' 60'30' 0
SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
2019 149F2-00133-7J
MILL & OVERLAY
OGDEN ACP
90+00
M A
T
EM
A
T
E
S c a le 1"
MILL AND OVERLAY 2" ASPHALT PAVEMENT
2x SOLID 4" WHITE MARKING
DASHED 4" WHITE MARKING
2x SOLID 4" YELLOW MARKING
CHIP SEAL ASPHALT SHOULDERS
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
D
E R
L A
Y
E s t i m a a w i n g s
O g d
O .d g n
F i l e
:2
M a y
S a v e d
M A
L L
O N
HUEBNER RD
STATE
KANSAS
YEARPROJECT N0.
SCALE
30' 60'30' 0
SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
2019 1410F2-00133-7J
MILL & OVERLAY
OGDEN ACP
95+00
100+00
M A
T
E
S c a le 1"
END MILL AND OVERLAY
STA 102+86
MILL AND OVERLAY 2" ASPHALT PAVEMENT
CHIP SEAL ASPHALT SHOULDERS
2x SOLID 4" WHITE MARKING
2x SOLID 4" YELLOW MARKING
DASHED 4" WHITE MARKING
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator e e t
M o d e l : Z
E n g i n e e r i n g
O J
E
N A
G E
M E
N T
R o a d s
C X
X X d e n
E s t e s
G r a
O
E s t i m a a w i n g s
F
S
E R
L
A
T E
E s t i m a a w i n g s
G r a
O .d g n
F i l e
:3
M a y
S a v e d
Full Depth Repair Typical
6" Compacted Subgrade (Type B, MR-90)
6" HMA Commerical Grade (Class A)(Patching)
STA 39+58 -- STA 42+88
ESTES ROAD TYPICAL SECTION
STA 59+67 -- STA 65+40
HUEBNER AVE TYPICAL SECTION
2" HMA Commerical Grade (Class A)(Overlay) Geosynthetic Reinforcement (For Base)
4" AB-3 Aggregate Base
STA 30+07 -- STA 33+85
STA 10+00 -- STA 29+39
ESTES ROAD TYPICAL SECTION
TYPICAL SECTIONS
F2-00136-7J 11 14KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
Fort Riley Directorate of Public Works
STA 14+50 -- STA 21+90
HUEBNER AVE TYPICAL SECTION
GRANT ACP TYPICAL SECTION
4% 2%
E S
T
U
E B
N E
R
2%
AB-3 Edge Wedge AB-3 Edge Wedge
4% 2%
E S
T
AB-3 Shoulder Existing
AB-3 Edge Wedge AB-3 Edge Wedge
4:1 or Flatter 4:1 or F latte r
4:1 or Flatt er 4:1 or Flatter
6'--0" 12'--6"
2" MILL & OVERLAY
9'--0" 12'--6"
2" MILL & OVERLAY
2" MILL & OVERLAY
E B
N E
R
2%
2" MILL & OVERLAY
12'--0"
AB-3 Edge Wedge AB-3 Edge Wedge
4:1 or Flatt er 4:1 or Flatter
4:1 or Flatter
4:1 or Flatter
AB-3 Edge Wedge AB-3 Edge Wedge
4%
AB-3 Shoulder Existing
Varies 12'--0"
E B
N E
R
2" MILL & OVERLAY
4:1 or Flatter4:1 or Flatt er
Varies 12'--0"
SLOPE
SLOPE
SEAL COAT
5 9-12-07 Reorg. sheet, add. slope drain stone
SLOPE DRAIN (CONCRETE/STONE)
3 J.O.B.7-26-04 Revised guard fence to guardrail S.W.K.
S.W.K. J.O.B.4 1-28-05 Chg. Class to Grade conc., reinf.
S.W.K. J.O.B.
FLUME INLET and
6 1-25-16 T.T.R.Added Note to Designer S.W.K.
2-1-16
N o te t o D e s ig n e r:
W h e n c o n c re te f lu m e i n le ts a re u s e d o n p ro je c ts w it h a s p h a lt p a v m e n t u s e a b ri d g e a p p ro a c h
K D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 03-28-2018
F2-00136-7J 2019 1412
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
Z E n g in e e ri n g \0
P
R O J E
C T M
A N
A G
E M
E N
T \R o a d s \1
C
X X
X X
X O g d e n E s te s
G ra n t
A C
P M
O \E s ti m a te D ra w in g s \S ta n d a rd s \r d .d g n
F il e
D ra w n B y jo s h u a .w .m o o n e y
P lo tt e d -M a y -1
:3
:1
FHWA APPROVAL
DESIGN CK. DETAIL CK. QUAN.CK.
RD628
TRACED
TRACE CK.
QUANTITIES
APP'D. Scott. W. King
J.O.B.S.W.K.
J.O.B.S.W.K.
CURB, GUTTER
AND
COMBINED CURB & GUTTER
J.O.B.S.W.K.
TRACE CK.
8-13-1218 Revised General Note
1-29-1319 Added Detail, Comb. C&G (Sp.)
20 T.T.R. S.W.K.Det., Conc. Gutter Thru Curb Ramp2-23-17
SCOTT W. KING3-7-17
17 7-2-09 Rev. nose details, jt. sealant & retro.
K D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 09-27-2018
14132019F2-00136-7J
RD635
TRACED
APP'D.
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
Z E n g in e e ri n g \0
P
R O J E
C T M
A N
A G
E M
E N
T \R o a d s \1
C
X X
X X
X O g d e n E s te s
G ra n t
A C
P M
O \E s ti m a te D ra w in g s \S ta n d a rd s \r d .d g n
F il e
D ra w n B y jo s h u a .w .m o o n e y
P lo tt e d -M a y -1
:3
:3
FHWA APPROVAL
DESIGN CK. DETAIL CK. QUAN.CK.
RD
TRACED
TRACE CK.
QUANTITIES
APP'D.
Z E n g in e e ri n g \0
P
R O J E
C T M
A N
A G
E M
E N
T \R o a d s \1
C
X X
X X
X O g d e n E s te s
G ra n t
A C
P M
O \E s ti m a te D ra w in g s \S ta n d a rd s \r d a .d g n
F il e
D ra w n B y jo s h u a .w .m o o n e y
P lo tt e d -M a y -1
:3
:5
1-10-07 Changed bituminous to asphalt S.W.K. J.O.B.
STATE
KANSAS
YEARPROJECT N0. SHEET NO.
DATE REVISIONS BY APP'DNO.
RD719A
S.W.K.
J.O.B.
DESIGN CK. DETAIL CK.
QUANTITIES
QUAN.CK.
TRACED Bowser
TRACE CK. King
APP'D. James O. Brewer
SHEETS
TOTAL
JOINT and CRACK PATCHING
CONCRETE PAVEMENT (PCCP)
-FHWA APPROVAL 9-27-1 1
5-05-11 Rev. details and General Notes
K D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 03-29-2018
14142019F2-00136-7J
| Title Sheet |
| Estes Road |
| Estes Road |
| rd726R |
| Grant Gate M&O |
| Grant Gate M&O |
| Ogden ACP M&O |
| Ogden ACP M&O |
| Ogden ACP M&O |
| Ogden ACP M&O |
| Grant Gate M&O |
| rd628 |
| rd635 |
| rd719a |