Text version
ð
50 1
.1
STATE YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
Partial
60%
13% sht. 1
AADT(2017)
AADT(2037)
FORT RILEY DIRECTORATE OF PUBLIC WORKS
RILEY COUNTY KANSAS
TASK ORDER NO.
45 MPH
20 FT
2- O O PLAN & STANDARD SHEETS
KANSAS 1
GROSS LENGTH OF PROJECT
EXCEPTIONS
NET LENGTH OF PROJECT
NET LENGTH OF BRIDGES
NET LENGTH OF ROAD
FT. (Includes Equations)
FT.
FT.
FT. MILES
MILES
MILES
Clear Zone
C of A
V
D
DHV
T
DESIGN DESIGNATION
CONVENTIONAL SIGNS
COUNTY LINE
CITY LIMITS
STATE OR NATIONAL LINE
PROPERTY LINE
HIGHWAY FENCE
EXISTING FENCE
CONSTRUCTION LIMITS
RIGHT OF WAY LINE
TRAVELED WAY
RAILROADS
TOWNSHIP, SECTION or GRANT LINE
GUARDRAIL
CENTER LINE OF PROJECT
TERRACE
CULVERTS
DROP INLET & STORM SEWER
ACCESS CONTROL
POWER POLE
TELEPHONE POLE
MARSH
HEDGE
TREES
PROFILE ELEVATION
STREAM or CREEK
INDEX OF SHEETS
TITLE SHEET1
FORT RILEY DIRECTORATE OF PUBLIC WORKS
Project Manager, Public Works Engineering Division
Approved
Date
By:
FEDERAL PROJECT
Civil Engineer PE, PTOE
SEEDING
PAVEMENT
GRADING
CULVERTS
responsible for verifying quantities for bidding purposes.
Quantities are estimated and for information only. Contractor is
ROADSIDE IMPROVEMENTS PROJECT
18F2-00020-8J
185'--5"
R
Varies
51'--9"
100'--8"
7' 9"
50'--4"
93'--8"
40'--8"
16'--8"
0"
151'--2"
E x is
t. D itc h
E x is t.
B a r r ie r
E xi st in g
R
CP
Mar sha ll Dr
E xi st D it ch xi st D ch is t.
C o n c
S u r f a c e
E x is t.
C o n c
S u r f a c e
E x is t.
C o n c
S u r f a c e
H E
N R
Y
D
H E
N
E=1661242.69 N=260986.15
E=1662041.37 N=261161.84
Start Project
End Project
{ SMOKEY HILL RD
S
M O
K E
Y
H
IL
L
R
D
Solid Lines
4" Double Yellow
Dotted Line
4" White
Solid Line
4" White
Security Barrier
Exist. Conc.
Pad
Exist. Conc.
Solid Line
4" Yellow
Grade(Patch)
9" HMA Commerical
Full Depth Patch Typical
Varies
Scale 5:1
{ Smokey RD.
E=1661389.09N=261119.72
E=1661389.09 N=261119.72
Sht. RD051
See KDOT Std.
E=1661132.58 N=261098.83
E=1661119.22 N=261127.37
M&O Limit
0+00 5+00
M&O Limit
Exist. Stop Sign
Solid Line
4" White
Solid Line
24" White
E=1661437.04 N=261139.10
E=1661265.92 N=261032.12
E=1661202.28 N=261036.35
E=1661476.85 N=260746.81
{ Smokey RD.
2%4%
6:1 Sl ope or
Flatt er
2" Mill & Overlay
Aggregate Shoulder
6"AB-3
Scale 5:1
Typical Section
1:
1 6:1 Slope or Flatter
1:
12'--0"
Varies
8" AB-3 Base
Scale 5:1
A
A
6" AB-3 Base
6:1 Slope or Flatter
Grade (Class A)
6" HMA Commerical
Section A-A 1:1
4%
Aggregate Shoulder
6"AB-3
Varies Varies
See Section 01 11 00 Summary of Work
Night Operation shall be Conducted on Smokey Hill Rd.
Notes:
Seed (2000 SQFT)
PVMT Marking (Multi-Component) (Yellow) (4") (2218 LNFT)
PVMT Marking (Multi-Component) (White) (24") (18 LNFT)
PVMT Marking (Multi-Component) (White) (4") (2510 LNFT)
Milling(Asphalt)(2")(Transport to Camp Funston) (3384 SQYD)
HMA Commerical Grade (Class A)(Patching) (414 TONS)
HMA Commerical Grade (Class A) (368 TONS)
Aggregate Shoulder (AB-3) (6") (1977 SQYD)
Common Excavation (300 CUYD)
Clear & Grub - Trees up to 6" Diameter (2000 SQFT)
Estimated Materials Include the Following:
Fill and Re-grade as Necessary
Install AB-3 Shoulder w/Edge Wedge LT.&RT.
See Typical Section
2" Mill and Overlay
{ Smokey Hill Rd. Sta. 0+00 to Sta. 9+18.51
Seed (1000 SQFT)
HMA Commerical Grade (Class A) (16 TONS
Aggregate Shoulder (AB-3) (6") (24 SQYD)
Common Excavation (50 CUYD)
Clear & Grub - Trees up to 6" Diameter (1000 SQFT)
Estimated Materials Include the Following:
Fill and Re-grade as Necessary
Install AB-3 Shoulder w/Edge Wedge RT.
Install Asphalt Shoulder w/50' Radius
2" Mill & Overlay
2 18KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
MILL AND OVERLAY
SMOKEY HILL RD.
Approx.
20'
Approx.
20' 50'50' W
W
2+ 21'+ 21'
Var.
Slope
Varies
:1
V a r
S lo p e
V a r
S lo p e
N o r m a l S id e
N o r m a l S id e
R o a d
S lo p e
R o a d
S lo p e
' 25
R .R
28'
24'
"W" for Side Roads for Entrances
Surfaced Roadbed
M.B. Turnout
Shoulder Line
110'
15' 15'40' 40'
"D
"D
Base or Surface
Course
"L"
N o r m a l
S lo p e
N o r m a l
S lo p e o r
E n tr a n c e
R/W
Typical drainage structure
Ditch
Edge of Surface
Shoulder Line
Edge of Surface
Rad. Pt. 32.69' E.P.
Variable slope approx.
50' or as available.
Variable slope approx.
50' or as available.
Thickness as shown in
General Note.
Direction of Traffic Edge of Surfacing
Shoulder Line Mail Box
Existing Profile
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
DETAIL FOR SURFACING OF SIDE ROADS
& HOUSE ENTRANCES
SECTION A-A
DETAIL FOR SURFACING OF MAIL BOX TURNOUTS
TYPICAL PROFILE AT GRADE CONTROL POINTS
Normal Slope (but not steeper than
8:1 Slope at the appropriate clear
Computed at the rate of
Computed at the rate of
Note: The face of Mail Box should be no closer to
Width shall be 8' or shoulder width, whichever is greater.
zone shall apply to all mound entrances and mound side roads to 10' fill height.
Normal Slope (but not steeper than 6:1) for over 10' fill height.
appropriate clear zone width.
the roadway than the edge of the shoulder.
Align with edge of turnout when turnout width is greater than shoulder width.
A
A
TABLE OF DIMENSIONS
RATES OF APPLICATION RECAPITULATION OF QUANTITIES
D D D D D DL L L L L L
1''
2''
25'
50'
3''
4''
75'
100'
5''
6''
125'
150'
7''
8''
175'
200'
225'
250'
11''
12''
275'
300'
RATE UNIT ITEM ITEM TOTAL UNIT
ITEM
9''
10''
(Surfacing)
On side roads and entrances which slope toward the highway, a low point approx. 6" deep shall be constructed to divert surface drainage into the high-way ditch, the plans.
unless otherwise shown on ì ì
S id e
R o a d ì Project
6:1) at approximate ì Structure or ì Project
RD051
ESTIMATED QUANTITIES FOR SMOKEY HILL RD.
SMOKEY HILL RD.
ESTIMATED QUANTITIES FOR
A tack coat of SS-1HP shall be provided between each lift of all base courses and
1 1 8-30-06 calculated at the rate of 0.06 gal. /sq. yd.
Changed tack type/rate
Asphalt Material quantities are calculated on the basis of 8.328 lbs. per gal.
On projects which specify both asphalt base and surface course materials, placed on an existing asphalt, brick, or concrete surface, when so ordered by the
1 2 1-10-07 Changed bituminous to asphalt material as directed by the Engineer. The removal of this material will be subsidiary.
The material used to backfill over the structure shall be at least to the to the limits shown on the detail.
GENERAL NOTE:
Over all structures, unless otherwise directed by the Engineer, where the top of the hubguard is level with or above the finished shoulder grade, the earth cover over the structure slab shall be removed and backfilled with paid for at the prices shown in the contract.
to the R/W line as indicated on the detail. All side roads and house entrances with existing asphalt surface shall be surfaced with
R/W line or to the end of construction, as directed by the Engineer. Each mailbox turnout (ON PROJECTS WHERE STABILIZED SHOULDERS ARE NOT SPECIFIED) shall be surfaced with
Surfacing material (SA- ) shall be used for surfacing house entrances and side roads ( C.Y./SQ. YD.) beyond the limits of the asphalt surface to the limits of construction as determined by the Engineer.
same thickness as the stabilized shoulder within the approximate limits of the shoulder.
side roads, house entrances and mailbox turnouts may be surfaced with both materials at the contractors option, with the approval of the Engineer.
lbs. per cu. ft. Quantities for stabilized base course, AB-3, are calculated on the basis of 1 56 lbs. per cu. ft. Weight/cu. ft. includes moisture allowed by specification.
Thicknesses indicated for all construction which is paid for on a weight or volume basis are approximate and may vary to correct for unevenness in the foundations or for other normal unevenness encountered in placement operations.
surface courses and under the first lift of base or surface courses when they are
Engineer and at the rate designated by him. Quantities are included for these tacks ordered by the Engineer, the top 3'' shall be left uncompacted for seeding.
The Contractor shall cut the subgrade in accordance with this profile at all grade control points, i.e. ; existing pavements, grade bridges and
R.R. crossings, also at changes in thickness of base or surface courses.
The work of cutting the subgrade and disposing of excess excavated material shall be subsidiary to other items in the contract.
The base course shall be constructed to the plan thickness as shown.
All side roads and house entrances shall be surfaced with
The thickness of side road and entrance surfacing may be increased to the
Quantities for aggregate for shoulders, AS-1, are calculated on the basis of 1 50
Corresponding dimensions of "D" and "L" shall be as given in the table below.
On surfacing projects, the 6'' of Compaction Type AA, shown for the center portion on the roadbed, is for the purpose of restoring the original Compaction Type AA which may have been lost since grading operations. The exact locations of this Compaction
Type AA, which will be required, is to be determined by the Engineer at the time of con-
(MR- )".
struction. This work shall be paid under the bid item "Compaction of Earthwork (Type AA)
Shoulder rumble strips will not be constructed as part of this project.
The earth shoulders shall be compacted full depth (Type -MR ) except, when
9 6-12-02 S.W.K. J.O.B.Added low point off shoulder.
S.W.K. J.O.B.10 3-24-05 Revised compaction, tack type/rate
S.W.K. J.O.B.
S.W.K. J.O.B.
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
DATE REVISIONS BY APP'DNO.
KANSAS DEPARTMENT OF TRANSPORTATION
FHWA APPROVAL 9-06-06
DESIGNED
DETAILED
DESIGN CK. DETAIL CK. QUAN.CK.
TRACED Bowser
TRACE CK. Hecht
QUANTITIES
APP'D. James O. Brewer
K D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 10-21-2015
CUYDLFT EA TONSSQYDSQFT
KDOT SPEC
CLEAR & GRUB - TREES UP TO 6" DIAMETER
COMMON EXCAVATION(RURAL SMALL)
AGGREGATE SHOULDER (AB-3) (6")
HMA COMMERCIAL GRADE (CLASS A)
HMA COMMERICAL GRADE (CLASS A) (PATCHING)
MILLING (ASPHALT) (2") (TRANSPORT TO CAMP FUNSTON)
PVMT MARKING (MULTI-COMPONENT) (WHITE) (4")
PVMT MARKING (MULTI-COMPONENT) (WHITE) (24")
PVMT MARKING (MULTI-COMPONENT) (YELLOW) (4")
SEED (URBAN MIX)
2018 3 18F2-00020-8J
89'--5"
-2
63'--3"
R
73'--3" R
-3
R
'--3
4'--0"
" 26'--6"
R
-0
5'--0"
164'--2" R
'--0
79'--3"118'--11"41'--3"
121'--11"38'--1"
21'--5"
1'
"E x is
t. 2
" C
M P
Electric
T
Corvias Boundary
E x is
t. 3
" C
M P
T
CL
S E
IT
Z
. CL
GODFREY AVE
M&O Limits
M&O Limits
Start Project
Solid Lines
4" Double Yellow
E=1660085.30 N=271154.36
B
B
E=1660017.50 N=271150.47
Yellow Solid Line
End 4" Double
E=1659880.05 N=271318.06
B
306. Seed ( SQFT)
243. Curb and Gutter, Combined (AE) ( LNFT)
14. Common Excavation ( CUYD)
Estimated Material |tems |nclude:
Fill and Re-Grade as Necessary
See KDOT Std. Sht. RD635
Remove and Install Type 1 Curb & Gutter
Sta. -
B.
B.
Scale 5:1
Grade(Patch)
9" HMA Commerical
8" AB-3 Base
Full Depth Patch Typical
Varies
E=1659615.19 N=270775.14
E=1660061.80 N=271214.57
M&O Limits
Commerical Grade
9" HMA
Section B.2-B.2
1'--9"
Varies
B
& Gutter
Install Type 3 Curb
6:1 Sl ope or
Flatt er
Section B-B
Scale 5:1
2%
6:1 Sl ope or
Flatt er
2" Mill & Overlay
6" Edge Wedge
Seitz Dr.
{ Godfrey Ave. &
1:
2%
1:
1 6:1 Slope or Flatter
11'--6"
2%
6:1 S lope or F latter
2" Mill & Overlay
See KDOT Std. Sht. RD635
Type 3 Curb&Gutter
2% 6:1 Slope or Flatter
11'--6"1'--9"
{ Godfrey Ave.
Section B.1-B.1
B.3 B.3
See KDOT Std. Sht. LA855
Erosion Control (Class 2)(Type E)
3:13:1
10'--0"
4'--0"
B .3
B .3
B.3 B.3
Section B.3-B.3
E=1659971.33 N=271125.73
E=1659730.62 N=270919.79
E=1660038.94 N=271144.29
Back of Curb
E=1660045.90 N=271227.06
Back of Curb
E=1659786.26 N=270943.40
B.1
B.1
E=1659975.31 N=271242.63
Yellow Solid Line Begin 4" Double
0+00
5+00
E=1659843.69 N=271551.27
8" AB-3 Base
Seed (7000 SQFT)
Pavement Edge Wedge (100%)(Install Only) (47 TONS)
PVMT Marking (Multi-Component) (Yellow) (4") (3496 LNFT)
PVMT Marking (Multi-Component) (White) (4") (3171 LNFT)
Milling(Asphalt)(2")(Transport to Camp Funston) (5150 SQYD)
HMA Commerical Grade (Class A)(Patching) (630 TONS)
HMA Commerical Grade (Class A) (560 TONS)
Common Excavation (200 CUYD)
Clear & Grub - Trees up to 6" Diameter (2000 SQFT)
Estimated Material |tems |nclude:
Fill and Re-grade as Necessary
See Section B-B
Install Edge Wedge LT.&RT.
2" Mill and Overlay
{ Godfrey Ave. to Seitz Ave. Sta. 0+00 to Sta.18+67.38
Seed (100 SQFT)
End Section (24")(RC) (1 EA)
Common Excavation (5 CUYD)
Clear & Grub - Trees up to 6" Diameter (100 SQFT)
Estimated Material |tems |nclude:
Fill and Re-grade as Necessary
Install End Section to Exist. 24" CMP
Remove Exist. End Section
Seed (100 SQFT)
End Section (30")(RC) (1 EA)
Common Excavation (5 CUYD)
Clear & Grub - Trees up to 6" Diameter (100 SQFT)
Estimated Material |tems |nclude:
Fill and Re-grade as Necessary
Install End Section to Exist. 30" CMP
Remove Exist. End Section Seed (300 SQFT)
Curb and Gutter, Combined (AE) (102 LNFT)
Estimated Material |tems |nclude:
Fill and Re-Grade as Necessary
See KDOT Std. Sht. RD635
Remove and Install Type 3 Curb & Gutter
Exist. Utility Pole
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Notes: Exist. Utilities For Information Only
4 18
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Notes: Exist. Utilities For Information Only
Seed (500 SQFT)
HMA Commerical Grade (Class A) (19 TONS)
Rock Excavation (10 CUYD)
Common Excavation (10 CUYD)
Estimated Material |tems |nclude:
Fill and Re-grade as Necessary
See Section B.2-B.2
Install Asphalt
Seed (200 SQFT)
Erosion Control (Class 2)(Type E) (21 SQYD)
Slope Drain (Concrete) (15 LNFT)
Flume Inlet (Concrete) (1 EA)
Rock Excavation (2 CUYD)
Common Excavation (10 CUYD)
Estimated Material |tems |nclude:
See Section B.3-B.3
Install Ditch w/Erosion Control
See KDOT Std. Sht. RD635
Install Concrete Drain on Exist. Curb Drain
Remove Exist. Curb & Gutter
Seed (500 SQFT)
Erosion Control (Class 2)(Type E) (37 SQYD)
Curb and Gutter, Combined (AE) (782 LNFT)
Slope Drain (Concrete) (20 LNFT)
Flume Inlet (Concrete) (2 EA)
Common Excavation (60 CUYD)
Estimated Material |tems |nclude:
See Section B.3-B.3
See KDOT Std. Sht. LA855
Install Ditch w/Erosion Control
Install Concrete Drain
See KDOT Std. Sht. RD635
Remove and Replace w/Type 3 Curb & Gutter
See KDOT Std. Sht. RD628
Install Type 3 Curb & Gutter
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
GODFREY AVE & SEITZ AVE.
6' 0"
-6
25'--6
14'--8"
SEITZ DR.CL
H U
E B
N
H U
E B
N
E=1659243.02 N=271975.43
End Project
E=1659214.54 N=271951.47
E=1659278.49 N=272005.27
B B15+00
5 18
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Notes: Exist. Utilities For Information Only
See Section B-B
Re-Grade Shoulders as Necessary
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
SEITZ AVE.
Approx.
20' 50'50' W
W
2+ 21'+ 21'
Var.
Slope
Varies
:1
V a r
S lo p e
V a r
S lo p e
N o r m a l S id e
N o r m a l S id e
R o a d
S lo p e
R o a d
S lo p e
' 25
R .R
28'
24'
"W" for Side Roads for Entrances
Surfaced Roadbed
M.B. Turnout
Shoulder Line
110'
15' 15'40' 40'
"D
"D
Base or Surface
Course
"L"
N o r m a l
S lo p e
N o r m a l
S lo p e o r
E n tr a n c e
R/W
Typical drainage structure
Ditch
Edge of Surface
Shoulder Line
Edge of Surface
Rad. Pt. 32.69' E.P.
Variable slope approx.
50' or as available.
Variable slope approx.
50' or as available.
Thickness as shown in
General Note.
Direction of Traffic Edge of Surfacing
Shoulder Line Mail Box
Existing Profile
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
DETAIL FOR SURFACING OF SIDE ROADS
& HOUSE ENTRANCES
SECTION A-A
DETAIL FOR SURFACING OF MAIL BOX TURNOUTS
TYPICAL PROFILE AT GRADE CONTROL POINTS
Normal Slope (but not steeper than
8:1 Slope at the appropriate clear
Computed at the rate of
Computed at the rate of
Note: The face of Mail Box should be no closer to
Width shall be 8' or shoulder width, whichever is greater.
zone shall apply to all mound entrances and mound side roads to 10' fill height.
Normal Slope (but not steeper than 6:1) for over 10' fill height.
appropriate clear zone width.
the roadway than the edge of the shoulder.
Align with edge of turnout when turnout width is greater than shoulder width.
A
A
TABLE OF DIMENSIONS
RATES OF APPLICATION RECAPITULATION OF QUANTITIES
D D D D D DL L L L L L
1''
2''
25'
50'
3''
4''
75'
100'
5''
6''
125'
150'
7''
8''
175'
200'
225'
250'
11''
12''
275'
300'
RATE UNIT ITEM ITEM TOTAL UNIT
ITEM
9''
10''
(Surfacing)
On side roads and entrances which slope toward the highway, a low point approx. 6" deep shall be constructed to divert surface drainage into the high-way ditch, the plans.
unless otherwise shown on ì ì
S id e
R o a d ì Project
ESTIMATED QUANTITIES FOR GODFREY AVE. & SEITZ DR.
GODFREY AVE. & SEITZ DR.
ESTIMATED QUANTITIES FOR
A tack coat of SS-1HP shall be provided between each lift of all base courses and
1 1 8-30-06 calculated at the rate of 0.06 gal. /sq. yd.
Changed tack type/rate
Asphalt Material quantities are calculated on the basis of 8.328 lbs. per gal.
On projects which specify both asphalt base and surface course materials, The material used to backfill over the structure shall be at least to the to the limits shown on the detail.
GENERAL NOTE:
Over all structures, unless otherwise directed by the Engineer, where the top of the hubguard is level with or above the finished shoulder grade, the earth cover over the structure slab shall be removed and backfilled with paid for at the prices shown in the contract.
to the R/W line as indicated on the detail. All side roads and house entrances with existing asphalt surface shall be surfaced with
R/W line or to the end of construction, as directed by the Engineer. Each mailbox turnout (ON PROJECTS WHERE STABILIZED SHOULDERS ARE NOT SPECIFIED) shall be surfaced with
Surfacing material (SA- ) shall be used for surfacing house entrances and side roads ( C.Y./SQ. YD.) beyond the limits of the asphalt surface to the limits of construction as determined by the Engineer.
same thickness as the stabilized shoulder within the approximate limits of the shoulder.
side roads, house entrances and mailbox turnouts may be surfaced with both materials at the contractors option, with the approval of the Engineer.
lbs. per cu. ft. Quantities for stabilized base course, AB-3, are calculated on the basis of 1 56 lbs. per cu. ft. Weight/cu. ft. includes moisture allowed by specification.
Thicknesses indicated for all construction which is paid for on a weight or volume basis are approximate and may vary to correct for unevenness in the foundations or for other normal unevenness encountered in placement operations.
surface courses and under the first lift of base or surface courses when they are
Engineer and at the rate designated by him. Quantities are included for these tacks ordered by the Engineer, the top 3'' shall be left uncompacted for seeding.
The Contractor shall cut the subgrade in accordance with this profile at all grade control points, i.e. ; existing pavements, grade bridges and
R.R. crossings, also at changes in thickness of base or surface courses.
The work of cutting the subgrade and disposing of excess excavated material shall be subsidiary to other items in the contract.
The base course shall be constructed to the plan thickness as shown.
All side roads and house entrances shall be surfaced with
The thickness of side road and entrance surfacing may be increased to the
Quantities for aggregate for shoulders, AS-1, are calculated on the basis of 1 50
Corresponding dimensions of "D" and "L" shall be as given in the table below.
On surfacing projects, the 6'' of Compaction Type AA, shown for the center portion on the roadbed, is for the purpose of restoring the original Compaction Type AA which may have been lost since grading operations. The exact locations of this Compaction
Type AA, which will be required, is to be determined by the Engineer at the time of con-
(MR- )".
struction. This work shall be paid under the bid item "Compaction of Earthwork (Type AA)
Shoulder rumble strips will not be constructed as part of this project.
The earth shoulders shall be compacted full depth (Type -MR ) except, when
9 6-12-02 S.W.K. J.O.B.Added low point off shoulder.
S.W.K. J.O.B.10 3-24-05 Revised compaction, tack type/rate
S.W.K. J.O.B.
S.W.K. J.O.B.
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
TRACED Bowser
D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 10-21-2015
CUYDLFT EA TONSSQYDSQFT
40. ROCK EXCAVATION40. ROCK EXCAVATION
KDOT SPEC
902902
CLEAR & GRUB - TREES UP TO 6" DIAMETER
COMMON EXCAVATION(RURAL SMALL)
ROCK EXCAVATION
HMA COMMERCIAL GRADE (CLASS A)
COMMERICAL GRADE (CLASS A) (PATCHING)
MILLING (ASPHALT) (2") (TRANSPORT TO CAMP FUNSTON)
PVMT MARKING (MULTI-COMPONENT) (WHITE) (4")
PVMT MARKING (MULTI-COMPONENT) (YELLOW) (4")
END SECTION (24")(CS)
END SECTION (30")(CS)
FLUME INLET (CONCRETE)
SLOPE DRAIN (CONCRETE)
CURB AND GUTTER, COMBINED (AE)
PAVEMENT EDGE WEDGE (RAP 100%) (INSTALL ONLY)
EROSION CONTROL (CLASS 2)(TYPE E)
SEED (URBAN MIX)
2018 6 18F2-00020-8J
B A
R T
O N
S T
EISENHOWER ST
W
IL
L
IS
T
P
IN
A D
WI
LLI
STON
P
OI
NT
R
OAD
{ Caisson Hill Rd.
0+
5+00
E=1656700.76 N=280604.50
{ Caisson Hill Rd.
Solid Lines
4" Double Yellow
Solid Lines
4" White
E=1656591.93 N=280559.08
E=1656775.93 N=280675.40
C
C
Begin Project
Grade(Patch)
9" HMA Commerical
Full Depth Patch Typical
Varies
2%
2" Mill & Overlay
Section C-C
Scale 5:1
{ Caisson Hill RD.
2%
6:1 Sl ope or
Flatt er
2" Mill & Overlay
Section C-C
Scale 5:1
{ Caisson Hill RD.
6:1 Slope or Flatter
6" Edge Wedge
12'--0"
8" AB-3 Base
Seed (5000 SQFT)
Pavement Edge Wedge (100%)(RAP Install Only) (471 TONS)
PVMT Marking (Multi-Component)(Yellow) (4") (7558 LNFT)
PVMT Marking (Multi-Component)(White) (4") (7737 LNFT)
Milling(Asphalt)(2")(Transport to Camp Funston) (10895 SQYD)
HMA Commerical Grade (Class A)(Patching) (1333 TONS)
HMA Commerical Grade (Class A) (1185 TONS)
Common Excavation (1000 CUYD)
Clear & Grub - Trees up to 6" Diameter (5000 SQFT)
Estimated Materials Include the Following:
Fill and Re-grade as Necessary
Install Edge Wedge LT.&RT.
2" Mill and Overlay
{ Caisson Hill Rd. Sta. 0+00 to Sta. 37+79
7 18
E=1656646.35 N=280711.34
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
MILL AND OVERLAY
CAISSON HILL RD.
1'--8
52'--10
4' 5"
30'--4"
67'--0" is t.
C
M P
10+00 15+00
{ Caisson Hill Rd.
8 18KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
CAISSON HILL RD.
is
t. 3
" C
M P
25+00
{ Caisson Hill Rd.
9 18KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
CAISSON HILL RD.
is
t. 4
" C
M P
E x is
t. 4
" C
M P
30+0035+00
End Project
E=1653729.16 N=281840.31
1S
IV
IS
IO
1S
IV
IS
IO
{ Caisson Hill Rd.
See KDOT Std. Sht. RD051
E=1653740.47 N=281762.45
E=1653714.69 N=281940.06
Seed (1500 SQFT)
Common Excavation (51 CUYD)
Clear & Grub - Trees up to 6" Diameter (1500 SQFT)
Estimated Materials Include the Following:
Fill and Re-Grade
10 18
E=1653925.99 N=281887.57
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
MILL AND OVERLAY
CAISSON HILL RD.
52' --1
0"
57'--5"
'--10
24'--7"
52'--11" 61'--7"
27'--8"
85'--7"
Approx.
20' 50'50' W
W
2+ 21'+ 21'
Var.
Slope
Varies
:1
V a r
S lo p e
V a r
S lo p e
N o r m a l S id e
N o r m a l S id e
R o a d
S lo p e
R o a d
S lo p e
' 25
R .R
28'
24'
"W" for Side Roads for Entrances
Surfaced Roadbed
M.B. Turnout
Shoulder Line
110'
15' 15'40' 40'
"D
"D
Base or Surface
Course
"L"
N o r m a l
S lo p e
N o r m a l
S lo p e o r
E n tr a n c e
R/W
Typical drainage structure
Ditch
Edge of Surface
Shoulder Line
Edge of Surface
Rad. Pt. 32.69' E.P.
Variable slope approx.
50' or as available.
Variable slope approx.
50' or as available.
Thickness as shown in
General Note.
Direction of Traffic Edge of Surfacing
Shoulder Line Mail Box
Existing Profile
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
DETAIL FOR SURFACING OF SIDE ROADS
& HOUSE ENTRANCES
SECTION A-A
DETAIL FOR SURFACING OF MAIL BOX TURNOUTS
TYPICAL PROFILE AT GRADE CONTROL POINTS
Normal Slope (but not steeper than
8:1 Slope at the appropriate clear
Computed at the rate of
Computed at the rate of
Note: The face of Mail Box should be no closer to
Width shall be 8' or shoulder width, whichever is greater.
zone shall apply to all mound entrances and mound side roads to 10' fill height.
Normal Slope (but not steeper than 6:1) for over 10' fill height.
appropriate clear zone width.
the roadway than the edge of the shoulder.
Align with edge of turnout when turnout width is greater than shoulder width.
A
A
TABLE OF DIMENSIONS
RATES OF APPLICATION RECAPITULATION OF QUANTITIES
D D D D D DL L L L L L
1''
2''
25'
50'
3''
4''
75'
100'
5''
6''
125'
150'
7''
8''
175'
200'
225'
250'
11''
12''
275'
300'
RATE UNIT ITEM ITEM TOTAL UNIT
ITEM
9''
10''
(Surfacing)
On side roads and entrances which slope toward the highway, a low point approx. 6" deep shall be constructed to divert surface drainage into the high-way ditch, the plans.
unless otherwise shown on ì ì
S id e
R o a d ì Project
ESTIMATED QUANTITIES FOR CAISSON HILL RD.
CAISSON HILL RD.
ESTIMATED QUANTITIES FOR
A tack coat of SS-1HP shall be provided between each lift of all base courses and
1 1 8-30-06 calculated at the rate of 0.06 gal. /sq. yd.
Changed tack type/rate
Asphalt Material quantities are calculated on the basis of 8.328 lbs. per gal.
On projects which specify both asphalt base and surface course materials, The material used to backfill over the structure shall be at least to the to the limits shown on the detail.
GENERAL NOTE:
Over all structures, unless otherwise directed by the Engineer, where the top of the hubguard is level with or above the finished shoulder grade, the earth cover over the structure slab shall be removed and backfilled with paid for at the prices shown in the contract.
to the R/W line as indicated on the detail. All side roads and house entrances with existing asphalt surface shall be surfaced with
R/W line or to the end of construction, as directed by the Engineer. Each mailbox turnout (ON PROJECTS WHERE STABILIZED SHOULDERS ARE NOT SPECIFIED) shall be surfaced with
Surfacing material (SA- ) shall be used for surfacing house entrances and side roads ( C.Y./SQ. YD.) beyond the limits of the asphalt surface to the limits of construction as determined by the Engineer.
same thickness as the stabilized shoulder within the approximate limits of the shoulder.
side roads, house entrances and mailbox turnouts may be surfaced with both materials at the contractors option, with the approval of the Engineer.
lbs. per cu. ft. Quantities for stabilized base course, AB-3, are calculated on the basis of 1 56 lbs. per cu. ft. Weight/cu. ft. includes moisture allowed by specification.
Thicknesses indicated for all construction which is paid for on a weight or volume basis are approximate and may vary to correct for unevenness in the foundations or for other normal unevenness encountered in placement operations.
surface courses and under the first lift of base or surface courses when they are
Engineer and at the rate designated by him. Quantities are included for these tacks ordered by the Engineer, the top 3'' shall be left uncompacted for seeding.
The Contractor shall cut the subgrade in accordance with this profile at all grade control points, i.e. ; existing pavements, grade bridges and
R.R. crossings, also at changes in thickness of base or surface courses.
The work of cutting the subgrade and disposing of excess excavated material shall be subsidiary to other items in the contract.
The base course shall be constructed to the plan thickness as shown.
All side roads and house entrances shall be surfaced with
The thickness of side road and entrance surfacing may be increased to the
Quantities for aggregate for shoulders, AS-1, are calculated on the basis of 1 50
Corresponding dimensions of "D" and "L" shall be as given in the table below.
On surfacing projects, the 6'' of Compaction Type AA, shown for the center portion on the roadbed, is for the purpose of restoring the original Compaction Type AA which may have been lost since grading operations. The exact locations of this Compaction
Type AA, which will be required, is to be determined by the Engineer at the time of con-
(MR- )".
struction. This work shall be paid under the bid item "Compaction of Earthwork (Type AA)
Shoulder rumble strips will not be constructed as part of this project.
The earth shoulders shall be compacted full depth (Type -MR ) except, when
9 6-12-02 S.W.K. J.O.B.Added low point off shoulder.
S.W.K. J.O.B.10 3-24-05 Revised compaction, tack type/rate
S.W.K. J.O.B.
S.W.K. J.O.B.
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
TRACED Bowser
D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 10-21-2015
CUYDLFT EA TONSSQYDSQFT
10895
KDOT SPEC
CLEAR & GRUB - TREES UP TO 6" DIAMETER
COMMON EXCAVATION(RURAL SMALL)
HMA COMMERCIAL GRADE (CLASS A)
HMA COMMERICAL GRADE (CLASS A) (PATCHING)
MILLING (ASPHALT) (2") (TRANSPORT TO CAMP FUNSTON)
PVMT MARKING (MULTI-COMPONENT) (WHITE) (4")
PVMT MARKING (MULTI-COMPONENT) (YELLOW) (4")
PAVEMENT EDGE WEDGE (RAP 100%) (INSTALL ONLY)
SEED (PERMANENT MIX)
2018 11 18F2-00020-8J
21'--2"35'--6"
9'--1"
Varies
25'--5"
63'--3"
83'--10"
100'--0"
53'--10"
1' 1"
-6
43'--3"
-4
-1
1"
1'
59'--6" 40'--1"
4"
-7
-5
-6
60'- -5"
2"
0"
13'--3" 55'--0"
12'--7" 25'--5"
Exist. Ditch
E x ist. C u lvert
Ex is t.
Cu lve rt
Exi st.
18"
RCP
E x is t.
C u lv e r t
Exist. Elec.
A P
E N
N
IN
S
A V
E
Exist. Cu lvert
APENNINES AVE.
Exist. Conc. Surface
E x is
t. C o n c . S u r fa c e
ONLY
M&O Limits
M&O Limits
ONLY
Start Project
{ Trooper D r.
LIne
4" Dotted White
Yellow LIne
4" Double Solid
E=1647421.96 N=282916.15
E=1647484.70 N=282630.03
0+
5+00 LIne
4" Solid White
2%
2" Mill & Overlay { Trooper Rd.
Grade(Patch)
9" HMA Commerical
Full Depth Patch Typical
Varies
D
D
Section D-D
LIne
4" Dotted White
E=1647984.72 N=282830.84
Yellow LIne
4" Solid
Yellow LIne
4" Double Solid
Yellow LIne
4" Solid
Yellow LIne
4" Solid
Varies
White LIne
4" Solid
8" AB-3 Base
E=1647816.03 N=282799.58
Sign Post Footing (2-1/4" Perforated Square Steel Tube) (1 EA)
Sign Post (2-1/2" Perforated Square Steel Tube) (10 LNFT)
Sign (Flat Sheet) (High Performance) (9 SQFT)
Estimated Material |tems |nclude:
Install W4-2 Sign
Sidewalk Ramp (Dectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install ADA Ramps
12 18
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Exist. Utilities For Information Only
See Section 01 11 00 Summary of Work
Night Operation Shall be Conducted on Trooper Rd.
Note:
PVMT Mrk Sym (Paint) (White) (Thru-LT Arrow) (5 EA)
PVMT Mrk Sym (Paint) (Thru Arrow) (5 EA)
PVMT Mrk Sym (Paint)(White) (RT Arrow) (2 EA)
PVMT Mrk Sym (Paint)(White) (Only) (3 EA)
PVMT Marking (Multi-Component)(Yellow) (4") (1510 LNFT)
PVMT Marking (Multi-Component)(White) (24") (140 LNFT)
PVMT Marking (Multi-Component)(White) (4") (1423 LNFT)
Milling(Asphalt)(2")(Transport to Camp Funston) (8918 SQYD)
HMA Commerical Grade (Class A)(Patching) (1092 TONS)
HMA Commerical Grade (Class A) (970 TONS)
Common Excavation (50 CUYD)
Estimated Material |tems |nclude:
Fill and Re-grade as Necessary
2" Mill and Overlay
{ Trooper Rd. Sta. 0+00 to Sta. 13+58.19
Yellow LIne
4" Solid
White LIne
4" Solid
White LIne
4" Solid
White LIne
4" Solid
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
TROOPER DR.
100'--9"
'--4"
-4
66'--0"
74'--11"
39'--4"
29'--9"
6'--10"
21'--10"
30'--8"
6"
30'--8"
17'--9"41'--4"
8'- -6"
35'- -3"
1"
24'--4"
38'--0"
25'--1"
19'--7"
'--4
33'--3"
76'--2"
Exist. Ditch
E x is t.
R
C
Exist. 18" RCP xist. 18" CM
P Ex ist . 3
0"
CMP
Exist. 12" RCP
E x is
t. C u lv e r t
Exist. Culvert
E x is
t. C u lv e r t
E x is t.
C u lv e r t
E x is t.
C u lv e r t
Exis
t. Cu lvert
E x is t.
C u lv e r t
E x is t.
C u lv e r t
E x is
t. C u lv e r t
Exist. Culvert
Exis
t. Cu lvert
E x is
t. E le c
Exist. Elec.
E x is
t. F ib e r
O p tic
C a b le
N O
R M
A N
N O
R M
A N
M&O Limits
Exist. Conc. Surface
7081B
7081A
7003B
ONL
Y
M&O Limits
M&O Limits E=1648240.98 N=283520.65
TROOPER DR.
End Project
{ Trooper Dr.
Crosswalk
24" Solid White
Crosswalk
24" Solid White
10+00
LIne
4" Dotted White
Yellow LIne
4" Solid
E=1648410.90 N=283306.62
LIne
4" Dotted White
LIne
4" Solid White
LIne
4" Solid Yellow
Yellow LIne
4" Double Solid
E=1648099.89 N=283206.45
E=1648400.35 N=283414.66Line
4" Dotted White
Sidewalk Ramp (Dectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install ADA Ramps
Sidewalk Ramp (Dectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install ADA Ramps
13 18
Verify Locations of Exist. Piping, Utilities, and Other Underground Obstructions
Contact Public Works Dig-Safe Coordinator
Exist. Utilities For Information Only
See Section 01 11 00 Summary of Work
Night Operation Shall be Conducted on Trooper Rd.
Note:
White LIne
4" Solid
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
TROOPER DR.
Approx.
20' 50'50' W
W
2+ 21'+ 21'
Var.
Slope
Varies
:1
V a r
S lo p e
V a r
S lo p e
N o r m a l S id e
N o r m a l S id e
R o a d
S lo p e
R o a d
S lo p e
' 25
R .R
28'
24'
"W" for Side Roads for Entrances
Surfaced Roadbed
M.B. Turnout
Shoulder Line
110'
15' 15'40' 40'
"D
"D
Base or Surface
Course
"L"
N o r m a l
S lo p e
N o r m a l
S lo p e o r
E n tr a n c e
R/W
Typical drainage structure
Ditch
Edge of Surface
Shoulder Line
Edge of Surface
Rad. Pt. 32.69' E.P.
Variable slope approx.
50' or as available.
Variable slope approx.
50' or as available.
Thickness as shown in
General Note.
Direction of Traffic Edge of Surfacing
Shoulder Line Mail Box
Existing Profile
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
DETAIL FOR SURFACING OF SIDE ROADS
& HOUSE ENTRANCES
SECTION A-A
DETAIL FOR SURFACING OF MAIL BOX TURNOUTS
TYPICAL PROFILE AT GRADE CONTROL POINTS
Normal Slope (but not steeper than
8:1 Slope at the appropriate clear
Computed at the rate of
Computed at the rate of
Note: The face of Mail Box should be no closer to
Width shall be 8' or shoulder width, whichever is greater.
zone shall apply to all mound entrances and mound side roads to 10' fill height.
Normal Slope (but not steeper than 6:1) for over 10' fill height.
appropriate clear zone width.
the roadway than the edge of the shoulder.
Align with edge of turnout when turnout width is greater than shoulder width.
A
A
TABLE OF DIMENSIONS
RATES OF APPLICATION RECAPITULATION OF QUANTITIES
D D D D D DL L L L L L
1''
2''
25'
50'
3''
4''
75'
100'
5''
6''
125'
150'
7''
8''
175'
200'
225'
250'
11''
12''
275'
300'
RATE UNIT ITEM ITEM TOTAL UNIT
ITEM
9''
10''
(Surfacing)
On side roads and entrances which slope toward the highway, a low point approx. 6" deep shall be constructed to divert surface drainage into the high-way ditch, the plans.
unless otherwise shown on ì ì
S id e
R o a d ì Project
ESTIMATED QUANTITIES FOR TROOPER DR.
FOR TROOPER DR.
ESTIMATED QUANTITIES
A tack coat of SS-1HP shall be provided between each lift of all base courses and
1 1 8-30-06 calculated at the rate of 0.06 gal. /sq. yd.
Changed tack type/rate
Asphalt Material quantities are calculated on the basis of 8.328 lbs. per gal.
On projects which specify both asphalt base and surface course materials, The material used to backfill over the structure shall be at least to the to the limits shown on the detail.
GENERAL NOTE:
Over all structures, unless otherwise directed by the Engineer, where the top of the hubguard is level with or above the finished shoulder grade, the earth cover over the structure slab shall be removed and backfilled with paid for at the prices shown in the contract.
to the R/W line as indicated on the detail. All side roads and house entrances with existing asphalt surface shall be surfaced with
R/W line or to the end of construction, as directed by the Engineer. Each mailbox turnout (ON PROJECTS WHERE STABILIZED SHOULDERS ARE NOT SPECIFIED) shall be surfaced with
Surfacing material (SA- ) shall be used for surfacing house entrances and side roads ( C.Y./SQ. YD.) beyond the limits of the asphalt surface to the limits of construction as determined by the Engineer.
same thickness as the stabilized shoulder within the approximate limits of the shoulder.
side roads, house entrances and mailbox turnouts may be surfaced with both materials at the contractors option, with the approval of the Engineer.
lbs. per cu. ft. Quantities for stabilized base course, AB-3, are calculated on the basis of 1 56 lbs. per cu. ft. Weight/cu. ft. includes moisture allowed by specification.
Thicknesses indicated for all construction which is paid for on a weight or volume basis are approximate and may vary to correct for unevenness in the foundations or for other normal unevenness encountered in placement operations.
surface courses and under the first lift of base or surface courses when they are
Engineer and at the rate designated by him. Quantities are included for these tacks ordered by the Engineer, the top 3'' shall be left uncompacted for seeding.
The Contractor shall cut the subgrade in accordance with this profile at all grade control points, i.e. ; existing pavements, grade bridges and
R.R. crossings, also at changes in thickness of base or surface courses.
The work of cutting the subgrade and disposing of excess excavated material shall be subsidiary to other items in the contract.
The base course shall be constructed to the plan thickness as shown.
All side roads and house entrances shall be surfaced with
The thickness of side road and entrance surfacing may be increased to the
Quantities for aggregate for shoulders, AS-1, are calculated on the basis of 1 50
Corresponding dimensions of "D" and "L" shall be as given in the table below.
On surfacing projects, the 6'' of Compaction Type AA, shown for the center portion on the roadbed, is for the purpose of restoring the original Compaction Type AA which may have been lost since grading operations. The exact locations of this Compaction
Type AA, which will be required, is to be determined by the Engineer at the time of con-
(MR- )".
struction. This work shall be paid under the bid item "Compaction of Earthwork (Type AA)
Shoulder rumble strips will not be constructed as part of this project.
The earth shoulders shall be compacted full depth (Type -MR ) except, when
9 6-12-02 S.W.K. J.O.B.Added low point off shoulder.
S.W.K. J.O.B.10 3-24-05 Revised compaction, tack type/rate
S.W.K. J.O.B.
S.W.K. J.O.B.
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
TRACED Bowser
D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 10-21-2015
CUYDLFT EA TONSSQYDSQFT
KDOT SPEC
COMMON EXCAVATION(RURAL SMALL)
HMA COMMERCIAL GRADE (CLASS A)
HMA COMMERICAL GRADE (CLASS A) (PATCHING)
MILLING (ASPHALT) (2") (TRANSPORT TO CAMP FUNSTON)
PVMT MARKING (MULTI-COMPONENT) (WHITE) (4")
PVMT MARKING (MULTI-COMPONENT) (WHITE) (24")
PVMT MARKING (MULTI-COMPONENT) (YELLOW) (4")
PVMT MRK SYM (PAINT)(WHITE) (ONLY)
PVMT MRK SYM (PAINT)(WHITE) (RT ARROW)
PVMT MRK SYM (PAINT)(WHITE) (THRU ARROW)
PVMT MRK SYM (PAINT)(WHITE) (THRU-LT ARROW)
SIGN (FLAT SHEET) (HIGH PERFORMANCE)
SIGN POST (2-1/2" PERFORATED SQUARE STEEL TUBE)
SIGN POST FOOTING (2-1/2" PERFORATED SQUARE STEEL TUBE)
SIDEWALK RAMP (DETECTABLE WARNING)
2018 14 18
F2-00020-8J
13'--4"
100'-- 11"
47'--8"
2'
2' 5"
G R
A V E S
S T
G R A
V
ES
S T
Es te s
Rd
Existing RCB
E x is tin g
'X
'X
' R
C B
E x is tin g
'X
'X
' R
C B
M&O Limits
E=1650073.44 N=284925.81
Begin Project
Es te s
Rd
ESS11
Solid Lines
4" Double Yellow
4" White Solid Lines
E
E
2% 6:1 Sl ope or Flatt er
2" Mill & Overlay
12'--0"
Scale 5:1
{ Estes Rd.
Existing Curb&Gutter
6:1 Slope or Flatter
Section E-E
0+00
5+00
Grade(Patch)
9" HMA Commerical
8" AB-3 Base
Full Depth Patch Typical
Varies
PVMT Marking (Multi-Component) (Yellow) (4") (3696 LNFT)
PVMT Marking (Multi-Component) (White) (4") (2933 LNFT)
Milling(Asphalt)(2")(Transport to Camp Funston) (4514 TONS)
HMA Commerical Grade (Class A)(Patching) (553 TONS)
HMA Commerical Grade (Class A) (491 TONS)
Common Excavation (250 CUYD)
Estimated Material |tems |nclude:
Fill and Re-grade as Necessary
2" Mill and Overlay
{ Estes Rd. Sta. 0+00 to Sta. 18+48.03
15 18
Pvmt Marking (Multi-Component) (White) (24") (13 LNFT)
Estimated Material |tems |nclude:
Install Crosswalk Markings
E=1649869.88 N=284937.30
Pvmt Marking (Multi-Component) (White) (24") (72 LNFT)
Estimated Material |tems |nclude:
See KDOT Std. TE309
Install Type ll Crosswalk Markings
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
ESTES RD.
336'--8"
24'--6"12'--11"
193'--7"
19'--3"
98'--8" 86'--9"
383'--4"
Existing RCB
M&O Limits
M&O Limits M&O Limits M&O Limits
M&O Limits
M&O Limits
M&O Limits
{ Estes Rd.
76737672
M&O Limits
10+0015+00
Sidewalk Ramp (Detectable Warning) (1 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install Sidewalk Ramp (Detectable Warning)
Pvmt Marking (Multi-Component) (White) (24") (40 LNFT)
Estimated Material |tems |nclude:
Install Crosswalk Markings
Sidewalk Construction (4") (AE) (12 SQYD)
Estimated Material |tems |nclude:
Install Sidewalk
Sidewalk Ramp (Detectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install Sidewalk Ramp (Detectable Warning)
Sidewalk Ramp (Detectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install Sidewalk Ramp (Detectable Warning)
Sidewalk Ramp (Detectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install Sidewalk Ramp (Detectable Warning)
Sidewalk Construction (4") (AE) (6 SQYD)
Estimated Material |tems |nclude:
Remove and Install Sidewalk
Pvmt Marking (Multi-Component) (White) (24") (40 LNFT)
Estimated Material |tems |nclude:
Install Crosswalk Markings
KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
ESTES RD.
93'--4"
PARKER ST
N O
R M
A N
N O
R M
A N
E st es d.
Exist. Conc. Surface
M&O Limits
M&O Limits
M&O Limits
{ Estes Rd.
E=1648459.83 N=285743.56
Conc. Surface Begins
End Project
Sidewalk Ramp (Detectable Warning) (1 SQYD)
Sidewalk Construction (4") (AE) (12 SQYD)
Common Excavation (3 CUYD)
Estimated Material |tems |nclude:
Re-Grade as Necessary
Remove and Install Sidewalk
Seed (200 SQFT)
Curb and Gutter, Combined (AE) (72 LNFT)
Common Excavation (5 CUYD)
Estimated Material |tems |nclude:
Re-Grade as Necessary
See KDOT Std. sht. RD635
Remove and Install Type 3 Curb&Gutter
Sidewalk Ramp (Detectable Warning) (1 SQYD)
Pvmt Marking (Multi-Component) (White) (24") (40 LNFT)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install Sidewalk Ramps (Detectable Warning)
Install Crosswalk Markings
Sidewalk Ramp (Detectable Warning) (2 SQYD)
Estimated Material |tems |nclude:
See KDOT Std. Sht. 725 & 725a
Install Sidewalk Ramp (Detectable Warning)
17 18KANSAS
STATE PROJECT N0. YEAR SHEET NO.
SHEETS
TOTAL
SCALE
030' 30'
F2-00020-8J 2018
Fort Riley Directorate of Public Works
MILL AND OVERLAY
ESTES RD.
32'--3"
252'--10"
39'--1"
Approx.
20' 50'50' W
W
2+ 21'+ 21'
Var.
Slope
Varies
:1
V a r
S lo p e
V a r
S lo p e
N o r m a l S id e
N o r m a l S id e
R o a d
S lo p e
R o a d
S lo p e
' 25
R .R
28'
24'
"W" for Side Roads for Entrances
Surfaced Roadbed
M.B. Turnout
Shoulder Line
110'
15' 15'40' 40'
"D
"D
Base or Surface
Course
"L"
N o r m a l
S lo p e
N o r m a l
S lo p e o r
E n tr a n c e
R/W
Typical drainage structure
Ditch
Edge of Surface
Shoulder Line
Edge of Surface
Rad. Pt. 32.69' E.P.
Variable slope approx.
50' or as available.
Variable slope approx.
50' or as available.
Thickness as shown in
General Note.
Direction of Traffic Edge of Surfacing
Shoulder Line Mail Box
Existing Profile
WITH DRAINAGE STRUCTURE MOUND ENTRANCE OR SIDE ROAD
DETAIL FOR SURFACING OF SIDE ROADS
& HOUSE ENTRANCES
SECTION A-A
DETAIL FOR SURFACING OF MAIL BOX TURNOUTS
TYPICAL PROFILE AT GRADE CONTROL POINTS
Normal Slope (but not steeper than
8:1 Slope at the appropriate clear
Computed at the rate of
Computed at the rate of
Note: The face of Mail Box should be no closer to
Width shall be 8' or shoulder width, whichever is greater.
zone shall apply to all mound entrances and mound side roads to 10' fill height.
Normal Slope (but not steeper than 6:1) for over 10' fill height.
appropriate clear zone width.
the roadway than the edge of the shoulder.
Align with edge of turnout when turnout width is greater than shoulder width.
A
A
TABLE OF DIMENSIONS
RATES OF APPLICATION RECAPITULATION OF QUANTITIES
D D D D D DL L L L L L
1''
2''
25'
50'
3''
4''
75'
100'
5''
6''
125'
150'
7''
8''
175'
200'
225'
250'
11''
12''
275'
300'
RATE UNIT ITEM ITEM TOTAL UNIT
ITEM
9''
10''
(Surfacing)
On side roads and entrances which slope toward the highway, a low point approx. 6" deep shall be constructed to divert surface drainage into the high-way ditch, the plans.
unless otherwise shown on ì ì
S id e
R o a d ì Project
6:1) at approximate ì Structure or ì Project
ESTIMATED QUANTITIES FOR ESTES RD.
FOR ESTES RD.
ESTIMATED QUANTITIES
A tack coat of SS-1HP shall be provided between each lift of all base courses and
1 1 8-30-06 calculated at the rate of 0.06 gal. /sq. yd.
Changed tack type/rate
Asphalt Material quantities are calculated on the basis of 8.328 lbs. per gal.
On projects which specify both asphalt base and surface course materials, The material used to backfill over the structure shall be at least to the to the limits shown on the detail.
GENERAL NOTE:
Over all structures, unless otherwise directed by the Engineer, where the top of the hubguard is level with or above the finished shoulder grade, the earth cover over the structure slab shall be removed and backfilled with paid for at the prices shown in the contract.
to the R/W line as indicated on the detail. All side roads and house entrances with existing asphalt surface shall be surfaced with
R/W line or to the end of construction, as directed by the Engineer. Each mailbox turnout (ON PROJECTS WHERE STABILIZED SHOULDERS ARE NOT SPECIFIED) shall be surfaced with
Surfacing material (SA- ) shall be used for surfacing house entrances and side roads ( C.Y./SQ. YD.) beyond the limits of the asphalt surface to the limits of construction as determined by the Engineer.
same thickness as the stabilized shoulder within the approximate limits of the shoulder.
side roads, house entrances and mailbox turnouts may be surfaced with both materials at the contractors option, with the approval of the Engineer.
lbs. per cu. ft. Quantities for stabilized base course, AB-3, are calculated on the basis of 1 56 lbs. per cu. ft. Weight/cu. ft. includes moisture allowed by specification.
Thicknesses indicated for all construction which is paid for on a weight or volume basis are approximate and may vary to correct for unevenness in the foundations or for other normal unevenness encountered in placement operations.
surface courses and under the first lift of base or surface courses when they are
Engineer and at the rate designated by him. Quantities are included for these tacks ordered by the Engineer, the top 3'' shall be left uncompacted for seeding.
The Contractor shall cut the subgrade in accordance with this profile at all grade control points, i.e. ; existing pavements, grade bridges and
R.R. crossings, also at changes in thickness of base or surface courses.
The work of cutting the subgrade and disposing of excess excavated material shall be subsidiary to other items in the contract.
The base course shall be constructed to the plan thickness as shown.
All side roads and house entrances shall be surfaced with
The thickness of side road and entrance surfacing may be increased to the
Quantities for aggregate for shoulders, AS-1, are calculated on the basis of 1 50
Corresponding dimensions of "D" and "L" shall be as given in the table below.
On surfacing projects, the 6'' of Compaction Type AA, shown for the center portion on the roadbed, is for the purpose of restoring the original Compaction Type AA which may have been lost since grading operations. The exact locations of this Compaction
Type AA, which will be required, is to be determined by the Engineer at the time of con-
(MR- )".
struction. This work shall be paid under the bid item "Compaction of Earthwork (Type AA)
Shoulder rumble strips will not be constructed as part of this project.
The earth shoulders shall be compacted full depth (Type -MR ) except, when
9 6-12-02 S.W.K. J.O.B.Added low point off shoulder.
S.W.K. J.O.B.10 3-24-05 Revised compaction, tack type/rate
S.W.K. J.O.B.
S.W.K. J.O.B.
K D
O T G r a p h ic s C e r ti fi e d
KDOT Graphics Certified 10-21-2015
CUYDLFT EA TONSSQYDSQFT
STATE
KANSAS
YEARPROJECT N0.
SHEETS
TOTAL
SHEET NO.
D G
N S
P E
C
F il e
D ra w n B y
U S
E R
N A
M E
P lo tt e d S
Y T
IM
E
TRACED Bowser
COMMON EXCAVATION(RURAL SMALL)
HMA COMMERCIAL GRADE (CLASS A)
HMA COMMERICAL GRADE (CLASS A) (PATCHING)
MILLING (ASPHALT) (2") (TRANSPORT TO CAMP FUNSTON)
PVMT MARKING (MULTI-COMPONENT) (WHITE) (4")
PVMT MARKING (MULTI-COMPONENT) (WHITE) (24")
PVMT MARKING (MULTI-COMPONENT) (YELLOW) (4")
SIDEWALK CONSTRUCTION (4")(AE)
SIDEWALK RAMP (DECTECTABLE WARNING)
CURB AND GUTTER, COMBINED (AE)
SEED(URBAN MIX)
KDOT SPEC
806806
2018 18 18F2-00020-8J la .d g n
ANCHOR SLOTS: The top of the blanket should be"slotted
2. LONGITUDINAL SEAMS:
3. SPLICE SEAM: When splices are necessary, overlapend
4.
of
Stagger splice seams.
in" at the top of the slope and anchored in place with anchors
Erosion Control Blankets shall be laid loosely in the direction then backfilled, tamped and seeded.
deep with the blanket anchored in the bottom of the slot, blanket to be in contact with the soil, lay blanket loosely, avoiding stretching.
The edges of the blanket should catching the edges of both blankets.
6 inches apart. The slots should be 6 inches wide x 6 inches overlap each other a minimum of 6 inches, with anchors a minimum of 8 inches in direction of water flow.
the slope, beginning at the bottom of the slope. In order for
1.
Strip Strip
6"
Sl op e
INSTALLATION DETAILS FOR EROSION CONTROL CLASS I
PLAN VIEW - ANCHORING DIAGRAM
LONGITUDINAL SEAM
SPLICE SEAM
6" min.
9/15/14 MRM
Revised Standard
Revised Standard
Revised Standard
INSTALLATION DETAIL
EROSION CONTROL CLASS 1
LA855
SLOPE PROTECTION
MRM SHS
SHS
3/10/2015
SHS
9/10/07 meet the North American Weed Free Forage Standards.
and erosion control practices, excluding wood based mulch, shall
Agricultural products, such as native prairie hay, used for mulching
NOTE:
Scott H. Shields
RAARAA
Direction of Slope
ISOMETRIC VIEW
V a r i e s
Bottom
Ditch
BackSlope
Ú E d g e o f
P a v e m e n t
Ú E d g e o f
S h o u ld e r
Inlet Pipe or
Outlet Pipe
Foreslope
PARTIAL PLAN BOX CULVERT
PARTIAL PLAN PIPE
Control Blanket
Limits of Erosion
Symm. About ì ì Box Culvert
Blanket
Erosion Control
8' min.
Class |
Blanket
Erosion Control
15' min.
Class |
B…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.