Attachment_4_Technical_As-Built__II_SP_620_Project_16-B-0004_02_JUN_16.pdf
PDF 98 KB Posted
- Attached to
- SP 620 Sewage Lift Station Repair & Upgrade Federal contract opportunity
- Solicitation number
- W911RX-16-B-0004
About this file
Attachment 4 Technical As-Built II SP 620 Project 16-B-0004 02 JUN 16
View the file
Other files for this federal contract opportunity
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
34-X-1
J
U N
:2
:3 f r x
.d lv
LOWER PLAN
1/4"=1’-0"
UPPER PLAN
1/4"=1’-0"
A
ASECTION
B
IG
B E
R T
H A
P U
M
S T
A T
IO
N
P L
A N
D
C T
IO
N
DISCHARGE LINE
EXST SUMP PUMP
BUBBLER LINE SUPPORT AND CASING
EXST 3" SCH 40 STEEL PIPE
DOOR
EXST
EXST REMOVABLE TOP
W/MANUAL WINCH
EXST CRANE LIFT
1/4"=1’-0"
EXTENDED VALVE STEM
WITH LID CENTERED OVER
EXST 4" ID FLOOR BOX
AL ACCESS DOOR
EXST 3’-6"x3’-6"
WITH MANUAL WINCH
EXST CRANE LIFT
EXST AREA DRAIN
ACCESS DOOR
EXST 2’-6"x2’-6" AL
EXST REINF CONC SLAB
EXST CONDUIT DUCT
ENTRANCE TUBE
EXST WALK IN
COMPRESSOR UNIT
EXST AIR CONDITIONER EXST REINF CONC SLAB
EXST AIR DUCT
ENTRANCE TUBE
EXST 44" DIA
SYSTEM DISCHARGE LINE
EXST 8" FORSYTH
FROM AREA DRAIN
EXST 4" SOIL PIPE
EXST BAR GRATE BASKET
EXST INFLUENT SECTION
EXST 15" INFLUENT
WET WELL SECTION
EXST FORSYTH SYSTEM
WET WELL SECTION
EXST CUSTER HILL SYSTEM
SYSYEM DISCHARGE LINE
EXST 12" CUSTER HILL
CONTROL PANEL
EXST CUSTER HILL
EXST PUMP STATION
0 4 8 12
Scale In Feet
0 4 8 12
Scale In Feet
0 4 8 12
Scale In Feet
HILL PUMP
EXST CUSTER
HILL PUMP
EXST CUSTER
AND DISCHARGE PIPING
PUMPS, SUCTION PIPING,
DEMO EXST FORSYTH
CONTROL PANEL
EXST FORSYTH
NEW EQUIP TUBE
FOR INSTALLATION OF
TO ALLOW EXCAVATION
DEMO EXST CONC SLAB DISCHARGE VALVES
ON SUCTION AND
INSTALL BLIND FLANGE
DISCHARGE PIPING.
SUCTION PIPING, AND
DEMO FORSYTH PUMPS,
D .L
O M
B A
R D
O
W
D A
Y
D E
M O
L
IT
IO
N
SYSTEM DISCHARGE HEADER
EXST 8" FORSYTH
NOTES:
AND PIPING PRIOR TO STARTING DEMOLITION.
VERIFY LOCATION AND GENERAL CONDITION OF STRUCTURES, EQUIPMENT,
1.
2.
S
G
IL
C H
R
IS
T
DEMOLITION AND NEW WORK.
BERTHA TO THE NEW CUSTER HILL AWTP. CONTRACTOR SHALL COORDINATE
THE BIG BERTHA PUMP STATION. WASTEWATER WILL THEN BE PUMPED FROM BIG
WASTEWATER WILL BE PUMPED FROM THE CAMP FORSYTH PUMP STATION TO
CONSTRUCTION OF THE NEW FORCE MAINS AND NEW CUSTER HILL AWTP,
AND NEW CUSTER HILL AWTP. FOLLOWING MODIFICATIONS TO BIG BERTHA AND
MODIFICATIONS TO BIG BERTHA AND CONSTRUCTION OF THE NEW FORCE MAINS
FORSYTH AND CUSTER HILL WASTEWATER TREATMENT PLANTS DURING
WASTEWATER FROM BIG BERTHA PUMP STATION TO BOTH THE EXISTING CAMP
IT IS NECESSARY THAT THE GOVERNMENT RETAIN THE CAPABILITY TO PUMP
NEW PUMP
SPACE FOR
P-2102-02
RECORD DRAWING
FEBRUARY 2006
CONTRACT NO. DACA41-02-C-0003
RECORD DRAWING
FEBRUARY 2006
CONTRACT NO. DACA41-02-C-0003
w n b y
D e s ig n e d b y
R e v ie w e d b y
D a t e
R e v
C k d b y
US Army Corps of Engineers u b m it t e d b y e s ig n f il e n o r a w in g c o d number:
reference
Sheet
D e s c r ip t io n D a t e
D e s c r ip t io n D a t e
A p p r
A p p r
A
M a r k
M a r k
B
C
D
2 3 4 5
D E
N V
E R
C O
L O
R A
D O
F O
R
IL
E Y
K A
N S
A S
A
F O
R C
IN
A
L L
E C
T
IO
Y
S T
A T
IO
N S
A D
V A
N C
W
S T
E W
A T
E A
T M
E
L
A N
T
P lo t
T im e
F il e n a m e
P lo t d a t e r m o r p s o f
E n g in e e r s
K a n s a s it is t r ic t
Kansas City District
12525
D
O
UGLASYEAR
S
L
Y
O
F E
SSIONALEN
G
IN
E E
R
LI
CENSED
KANSAS
Y E
A R
S L
E Y
S
G
IL
C H
R
IS
T
J U
N E
O R
IG
IN
L
A W
IN
G
B A
IS
E
IN
S C
A L
C O
R D
IN
G L
Y
T
IS
E E
T
A D J
U S
IF
E
IN
Sheet of 374
R e v i s d s
B u i l t
File details come from the government source that posted it. Updated .