Attachment_13_Potential_Bidder_Qs_ _As_(V2)_for_Solicitation_Number_W911RX-16-B-0004_SP_620_Project_07_JUL_16.pdf

PDF 90 KB Posted

Attached to
SP 620 Sewage Lift Station Repair & Upgrade
Solicitation number
W911RX-16-B-0004
Issued by

About this file

Revised (Version 2) of the Potential Bidder Questions and Answers Sheet.

View the file

Other files

File Type Posted
Summary_of_Bids_(SF_1409)_SP_620_Project_16-B-0004_13_JUL_16.pdf PDF
Solicitation_Amendment_SP_620_Project_16-B-0004-0003_07_JUL_16.pdf PDF
Attachment_13_-_Potential_Bidder_Qs_ _As_(V1)_for_Solicitation_Number_W911RX-16-B-0004_SP_620_Project_27_JUN_16.pdf PDF
Attachment_11_-_Site_Visit_Registration_-_SP_620_Project_16-B-0004_27_JUN_16.docx DOCX document
Solicitation_Amendment_SP_620_Project_16-B-0004-0002_27_JUN_16.pdf PDF
Solicitation_Amendment_SP_620_Project_16-B-0004-P00001_08_JUN_16.pdf PDF
Attachment_11_-_Site_Visit_Registration_-_SP_620_Project_16-B-0004_02_JUN_16.docx DOCX document
Attachment_7_Technical_Check_Valve_Description_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_6_Technical_Pump_Description_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Exhibit_B_-_Purchase_Description_SP_620_Lift_Station_Photos_16-B-0004_02_JUN_16.pdf PDF
Exhibit_C_-_Wage_Determination_-_JAN_2016_SP_620_Project_16-B-0004_02_JUN_16.docx DOCX document
Attachment_10_Utility_Drawing_Local_II_to_LS_with_Legend_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_3_Technical_As-Built_I_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_4_Technical_As-Built__II_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_2_Technical_As-Built_-_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_8_Utility_Drawing_CU006_Sanitary_Sewer_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_5_Technical_As-Built_Electrical_Panel_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Solicitation_SP_620_Project_16-B-0004_08_JUN_16.pdf PDF
Attachment_9_Utility_Drawing_Local_I_to_LS_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_1_Site_Visit_Maps_-_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Attachment_12_-_Request_for_Base_Access_-_SP_620_Project_16-B-0004_02_JUN_16.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Potential Bidder Questions and Responses for Solicitation #: W911RX-16-B- 0004 – SP 620 Sewage Lift Station Repair and Upgrade Project.

Question #1 (Offeror): The pump station is rated at 6200 gpm, and the solicitation states that the contractor should be prepared to deal with approximately 400,000 gallons of sewage. If the pump station is running at full capacity that is only 64 minutes of bypass operations? Do you have any flow quantities on the average daily rates or gpms for the pump station?

Answer #1 (U.S. Government): The contractor will have to by‐pass this Lift Station for the entire time the Lift Station is down. The Contractor shall have the ability to pump 400,000 gallons a day for the entire performance period.

Question #2 (Offeror): In regards to the bypass/backflow valve to be installed outside the exterior of the pump station, do you want this to be accessible by man entry? Would an additional "pig cleaning" or bypass valve and flange be wanted for future bypass operations?

Answer #2 (U.S. Government): Public Works wants the ability for an individual to have a safe and easy access to the valve. No addidtional Bypass Valve is required. Public Works wants to have the single external bypass/backflow valve installed in order to further prevent sewage from reserve flowing back into the Pump Station from the Golf Course.

Question #3 (Offeror): Where is the initial gravity manhole that the force main feeds into? I cannot seem to find it on the drawings? Statement of work says building 620, but I cannot find that readily available

Answer #3 (U.S. Government): The initial gravity manholes are just outside of the fenced in area of Bldg. SP 620.

Question #4 (Offeror): Each pump is a 10" vertical pipe (except #2 which is even smaller) do you want all 10" valves put back in the system? Do you want the vertical piping on pump #2 replaced to match other pumps?

Answer #4 (U.S. Government): I would say that the valves shall be replaced to match the existing size. Replacement valves should be Gate Valves and not Quarter Turn Valves.

Question #5 (Offeror): What size/type/specifics can you tell us about the in ground 12" force main so that the fittings can be properly priced/ordered?

Answer #5 (U.S. Government): Public Works isn’t sure of the exact characteristics of the 12” force Main.

The Contractor will be required to uncover the existing forced main and verify the pipe material, size, and type of fitting required after contract award. Contractor shall account for estimated costs and additional time required to complete the work due to the U.S. Government not being able to provide this exact technical information as part of the solicitation.

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐End Of Questions & Answers as of 27 June 2016‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

Question #6 (Offeror): The one major question that I still have looming is the exact location of the end of the force main. This end of the force main would be the first opportunity to discharge the bypass piping and is critical for bidding purposes. If you have plans or a map that shows the entirety of the 12" force main and its route to discharge that would be extremely helpful.

Answer #6 (U.S. Government): I spoke to the Fort Riley Public Works Section this morning and they told me that the utility maps that are currently posted on FBO with the solicitation is all of the information that they have available. I know that these documents leave a lot to be desired. The utilities on Fort Riley have been emplaced, dug up and moved around quite a bit on Fort Riley over the last 30 years. As a result, the exact location of the end of the Force Main isn't known. There are however several man holes that are located inside and outside of the fence in the posted solicitation pictures on www.fbo.gov. See Above Ground Photos 1‐3 in document labeled as Exhibit B. Public Works thinks that you may be able to work your bypass in the vicinity of these manholes.

Question #7 (Offeror): Can you extend the Bid Due Date from 11 July to 13 July in order to allow bidders a little more time to complete their bid package?

Answer #7 (U.S. Government): The Contracting Officer has decided to extend the Bid Due date/time (as stated in Section L) from 11 July 2016 at 2:00 PM (CST) until 13 July 2016 at 1:30 PM (CST). The Bid Opening Process will begin on 13 July 2016 at 1:30 PM (CST). Additionally, the date to submit questions to the Contracting Officer regarding this Solicitation is extended from 09 July 2016 at 5:00 PM (CST) until 11 July 2016 at 5:00 PM (CST).

Question #8 (Offeror): Will the winning bidder be given a tax exemption certificate to support this project?

Answer #8 (U.S. Government): Yes, the winning bidder will be provided with a tax exemption certificate to support this project.

‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐End Of Questions & Answers as of 07 July 2016‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐