W911RQ-27-S-C001-A006 HVAC 4 repair.pdf

PDF 125 KB Posted

Attached to
Army Contracting Command – Red River Army Depot (ACC-RRAD) Organic Industrial Base (OIB) Modernization Commercial Solutions Opening (CSO)
Solicitation number
W911RQ-27-S-C001
Issued by

About this file

This is a Commercial Solutions Opening (CSO) Area of Interest announcement for innovative HVAC repair solutions at Red River Army Depot.

The Army Contracting Command-Red River Army Depot (ACC-RRAD) seeks innovative commercial solutions to repair Building 4's compromised HVAC and building envelope systems. The primary objective is to restore the building's HVAC to full functionality with proper heating and cooling throughout the facility, including the telephone room, vehicle bay area heating via natural gas tube heaters, and replacement of the sump pump to prevent basement flooding. Key project activities include delegated HVAC design by a qualified professional engineer licensed in Texas to design a Variable Refrigerant Flow (VRF) system with ceiling-mounted cassettes and individual room thermostats, addressing restroom ventilation and vehicle bay heating; complete demolition and removal of existing HVAC systems and boiler components; and sump pump replacement at the exterior stairwell. Under Defense Federal Acquisition Regulation Supplement (DFARS) 212.70, "innovative" is defined as any new technology, process, or method as of proposal submission or any new application of existing technology. Interested parties must register in the System for Award Maintenance (sam.gov) if selected. Written solutions must be submitted via email to usarmy.rrad.acc.mbx.cso@army.mil by 5:00 P.M. Central Daylight Time on December 14, 2026, with the subject line "INNOVATIVE SOLUTION." Submissions received after the deadline will be discarded. Questions regarding the AoI may be directed to jacob.j.horn.civ@army.mil. The Government is not obligated to issue a Request for Proposal, make an award, or reimburse costs associated with developing responses to this announcement.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Agency: Army Office: Army Contracting Command-Red River Army Depot (ACC-RRAD) AoI Title: Bldg. 4 HVAC Repair CSO AoI Number: W911RQ-27-S-C001-A006 AoI Release Date: 11/24/26 Responses: See CSO W911RQ-27-S-C001 for Procedure Details

1. General Information

1.1 Introduction

This announcement is for innovative solutions for Building 4 HVAC Repairs (AoI) under the ACC-RRAD Commercial Solutions Opening W911RQ-27-S-C001. Interested parties are highly encouraged to visit the Government Point of Entry (www.sam.gov) to review the ACC-RRAD CSO special posting in its entirety to obtain more information on the process for submission evaluation of the CSO AoI Responses.

This CSO AoI seeks commercial solutions that meet the objectives detailed in Section 1.2 below. In accordance with Revolutionary FAR Overhaul (RFO) Defense Federal Acquisition Regulation Supplement (DFARS) 212.70, the term 'innovative' is defined as any technology, process, or method, including research and development, that is new as of the date of proposal submission, or any new application of an existing technology, process, or method as of the proposal date. CSOs may only be used to obtain innovative solutions or potential capabilities that fulfill requirements, to close capability gaps or provide potential innovative technological advancements, and when meaningful proposals with varying technical or scientific approaches can be reasonably anticipated.

ACC-RRAD is not obligated to extend a request for proposal or make an award as a result of this CSO AoI; all awards are subject to the availability of funds and successful negotiations. This CSO AoI is not an authorization to begin performance, and in no way obligates the Government for any costs incurred by the Offeror associated with developing a Response. Prior to commencement of any activities associated with performance under this CSO AoI, the Government will issue a written directive or contractual document signed by the Contracting Officer with appropriate consideration established. ACC-RRAD reserves the right to modify the requirements of this CSO AoI.

The authority to issue this CSO AoI is derived from ACC-RRAD Commercial Solutions Opening W911RQ-27-S-C001, dated 01 OCT 2026. The CSO authority is DoD Class Deviation 2022-O0007.

1.2 AoI Background

Building 4 HVAC and building envelope are compromised due to multiple failing elements. This includes a failing boiler, inadequate restroom ventilation and HVAC throughout the entire building. The primary objective is to restore building 4 HVAC to a fully functioning system that properly heats and cools the entire facility (to include the telephone room), addresses the need for heat in the vehicle bay area and replaces the sump pump that prevents flooding in the basement.

1.3 Building 4 HVAC Repairs

The project encompasses a full-scale renovation of the building 4 HVAC system and includes other repairs to the utility systems through the following key activities:

• Delegated HVAC Design: Contractor shall procure the services of a qualified professional engineer, licensed in the state of Texas, to perform all engineering design, calculations, and detailing for a VRF system with ceiling mounted cassettes. Each room shall have its own thermostat to control temperature independently. Restroom ventilation and vehicle bay heating (natural gas tube heaters) shall also be addressed in this design.

• Demolition: Remove all the existing HVAC system and boiler (and system components).

• Sump Pump: Replace existing sump pump located at the bottom of the exterior stairwell with an adequate pump similar in functionality.

2. AoI Constraints

1. Any selected company/companies will be required to be registered in the System for Award Maintenance (sam.gov).

3. Submission Requirements

A written solution must be sent via e-mail submission by 5:00 P.M. (CDT) on 14 DEC 2026, with subject line stating INNOVATIVE SOLUTION to usarmy.rrad.acc.mbx.cso@army.mil

Solutions received after the specified due date and time will be discarded and not be evaluated by the Government.

AoI Open Period – This AoI shall close at 5:00 P.M (CDT); 14 DEC 2026.

Point of contacts:

AoI questions can be sent to:

CSO AoI POC: jacob.j.horn.civ@army.mil mailto:jacob.j.horn.civ@army.mil

File details come from the government source that posted it. Updated .