This document is a Contract Data Requirements List (CDRL) outlining design review requirements for a 10 Ton Crane solicitation. The Red River Army Depot Directorate for Maintenance has requirements for a new 10 Ton Crane to be reviewed and approved by RRAD engineering personnel within 30 days of contract award. The contractor must provide detailed design drawings for one design review, which will be required upon completion of all work. Distribution of the design review includes the Production Engineering Division POC and RRAD Contracting Officer. The total estimated price for the CDRL is $120.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis 10 Ton Crane V2.docx | DOCX document | |
| IMG_3029.jpg | JPG image | |
| W911RQ24RX113 QandR.docx | DOCX document | |
| IMG_3030(1).jpg | JPG image | |
| 345 crane.jpg | JPG image | |
| 10 Ton Crane Pics PM 6844 INSP 24 AUG 2023.pdf | ||
| ASCE rails.pdf | ||
| CDRL A0002 Lock Out Tag Out(1).docx | DOCX document | |
| Combined Synopsis 10 Ton Crane V1.pdf | ||
| CDRL A0004 Manuals.docx | DOCX document | |
| CDRL A0001 Installation Schedule(4).docx | DOCX document | |
| CDRL A0003 Training.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 10 Ton Crane |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0005 |
| Design Review |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| PD 4.2 |
| RRAD, Contracting |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
| Draft |
| Final |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| Reg |
| Repro |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. One (1) design review shall be conducted by RRAD engineering personnel prior to work start. The contractor shall provide a detailed design drawing for government review and approval within 30 days after contract award. Reference PD 4.2
Per block 8. POC will receive detailed design drawing for government review and approval within 30 days after contract award.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Design Review will be required one time only upon completion of all work.
Per block 11. Design Review will be required one time only upon completion of all work.
Per block 12. Design Review will be required one time only upon completion of all work.
Distribution addresses:
POC – Ryan Bailey, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| PED, POC |
| 1 |
| 1 |
| 15. TOTAL ▬▬▬▬► |
| 1 |
| 2 |
| 0 |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Ryan Bailey |
| 15 Feb 2024 |
| Andy Graves, Chief Facilitization Team |
| 15 Feb 2024 |
File details come from the government source that posted it. Updated .