OCONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| TDP ____ |
| TM _____ |
| OTHER X |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| 0001 |
| Installation Schedule |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| DD |
| REQUIRED |
| ASRE Q |
| SEE BLOCK 16, ASREQ |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| B |
| 11. AS OF DATE |
| 13. DATE IF SUBSEQUENT SUBM. |
A
| SEE BLOCK 16 |
| SEE BLOCK 16 |
| 16. REMARKS |
| RRAD, Contracting |
Per block 5. The Contractor shall coordinate the proposed installation schedule with RRAD POC within 60 Days prior to delivery of the system. The installation schedule is subject to approval. Approval of the installation schedule shall not relieve the contractor of any responsibility for the performance. Reference PD 4.1
Per block 8. POC will review installation schedule 60 days prior to delivery.
Per block 9. For administrative and operational use only. (See DoDI 5230.24)
Per block 10. Installation Schedule will be required one time only 60 days prior to delivery.
Per block 11. Installation Schedule will be required one time only 60 days prior to delivery.
Per block 12. . Installation Schedule will be required one time only 60 days prior to delivery
Distribution addresses:
POC – Ryan Bailey, Production Engineering Division Luke Leitschuck, RRAD, Contracting
Repro = electronic delivery
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
| Ryan Bailey |
| 15 Feb 2024 |
| Andy Graves, Chief Facilitization Team |
| 15 Feb 2024 |