2816_RIPRAP.pdf
PDF 10 KB Posted
- Attached to
- ROADWAY MATERIAL
- Solicitation number
- W911RP-16-B-0001
About this file
Rip Rap
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911RP16B00010001.pdf | ||
| 2651_SELECTED_MATERIAL.pdf | ||
| SPECIFICATIONS.pdf | ||
| EXHIBIT_B.pdf | ||
| W911RP16B0001.pdf | ||
| 2655_QC_AND_ACCEPT.pdf | ||
| 2652_AGGREGATE_BASE_COURSE_.pdf | ||
| ICE_MELT.pdf | ||
| GENERAL_REQUIREMENTS.pdf | ||
| EXHIBIT_A.pdf | ||
| 2802_CONCRETE.pdf | ||
| 2610_STONE_BACKFILL.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RIPRAP
SECTION 2816 Page 1 of 1
SECTION 2816
RIP RAP
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
Arkansas State Highway and Transportation Department
Standard Specifications for Highway Construction (latest edition)
1.2 MEASUREMENT AND PAYMENT
Subsections 816.04 and 816.05 of the AHTD Standard Specifications for Highway Construction are not applicable. Dumped Riprap shall be measured and paid for by the ton.
1.3 STANDARD SPECIFICATIONS
Riprap shall conform to the provisions of Section 816 –and all referenced sections therein of the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction”, except as specified herein.
Reference hereinafter to the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction” will be by the basic designation “Standard Specifications”. The words “Chief Engineer” or “Engineer” in the Standard Specifications shall be interpreted to mean “Contracting Officer”. Copies of the Standard Specifications may be obtained from the Arkansas State Highway and Transportations Department, Little Rock, Arkansas, for approximately $10 per copy.
1.4 SUBMITTALS
The following shall be submitted in accordance with CONDITIONS, 3.0 SHOP AND
AS-BUILT DRAWINGS, SAMPLES, AND MANUFACTURER'S LITERATURE:
SD-07, Certificates of compliance
The Contractor shall furnish certificates of compliance with the requirements of Standard Specifications, Section 816 –Riprap.
PART 2 PRODUCTS
2.1 MATERIALS
Materials shall conform with the requirements provided under Section 816 of the Standard Specifications for Dumped Rip Rap except concrete or steel slag shall not be allowed. All material furnished shall be natural hard stone in accordance with 816.02.
2.2 TESTS
All costs incurred in testing materials shall be borne by the Contractor.
PART 3 EXECUTION
3.1 Rip Rap shall be furnished and delivered to required job sites or locations on the Pine Bluff Arsenal and neatly end dumped.
-- End of Section --
| PART 1 GENERAL |
| The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. |
File details come from the government source that posted it. Updated .