2652_AGGREGATE_BASE_COURSE_.pdf
PDF 10 KB Posted
- Attached to
- ROADWAY MATERIAL
- Solicitation number
- W911RP-16-B-0001
About this file
Aggregate Base Course
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911RP16B00010001.pdf | ||
| 2816_RIPRAP.pdf | ||
| 2651_SELECTED_MATERIAL.pdf | ||
| SPECIFICATIONS.pdf | ||
| EXHIBIT_B.pdf | ||
| W911RP16B0001.pdf | ||
| 2655_QC_AND_ACCEPT.pdf | ||
| ICE_MELT.pdf | ||
| GENERAL_REQUIREMENTS.pdf | ||
| EXHIBIT_A.pdf | ||
| 2802_CONCRETE.pdf | ||
| 2610_STONE_BACKFILL.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AGGREGATE BASE COURSE
SECTION 2652 Page 1 of 1
SECTION 2652
AGGREGATE BASE COURSE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
Arkansas State Highway and Transportation Department
Standard Specifications for Highway Construction (latest edition)
1.2 MEASUREMENT AND PAYMENT
Subsections 303.05 and 303.06 of the AHTD Standard Specifications for Highway Construction are not applicable.
1.3 STANDARD SPECIFICATIONS
Aggregate base course shall conform to the provisions of Section 303 – AGGREGATE BASE COURSE and all referenced sections therein of the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction”, except as specified herein. Reference hereinafter to the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction” will be by the basic designation “Standard Specifications”. The words “Chief Engineer” or “Engineer” in the Standard Specifications shall be interpreted to mean “Contracting Officer”. Copies of the Standard Specifications may be obtained from the Arkansas State Highway and Transportations Department, Little Rock, Arkansas, for approximately $10 per copy.
1.4 SUBMITTALS
The following shall be submitted in accordance with CONDITIONS, 3.0 SHOP AND
AS-BUILT DRAWINGS, SAMPLES, AND MANUFACTURER'S LITERATURE:
SD-07, Certificates of compliance
The Contractor shall furnish certificates of compliance with the requirements of Standard Specifications, Section 303.
PART 2 PRODUCTS
2.1 MATERIALS
Materials shall conform with the requirements provided under Section 303 of the Standard Specifications for Class 7 and Class 5 aggregate base course respectively.
2.2 TESTS
All costs incurred in testing materials shall be borne by the Contractor.
PART 3 EXECUTION
3.1 The base course material shall be furnished and delivered to the required job site or location and neatly end dumped.
-- End of Section --
| PART 1 GENERAL |
| The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. |
File details come from the government source that posted it. Updated .