2651_SELECTED_MATERIAL.pdf

PDF 11 KB Posted

Attached to
ROADWAY MATERIAL
Solicitation number
W911RP-16-B-0001
Issued by

About this file

Selected Material

View the file

Other files

File Type Posted
W911RP16B00010001.pdf PDF
2816_RIPRAP.pdf PDF
SPECIFICATIONS.pdf PDF
EXHIBIT_B.pdf PDF
W911RP16B0001.pdf PDF
2655_QC_AND_ACCEPT.pdf PDF
2652_AGGREGATE_BASE_COURSE_.pdf PDF
ICE_MELT.pdf PDF
GENERAL_REQUIREMENTS.pdf PDF
EXHIBIT_A.pdf PDF
2802_CONCRETE.pdf PDF
2610_STONE_BACKFILL.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SELECTED MATERIAL

SECTION 2651 Page 1 of 2

SECTION 2651

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

Arkansas State Highway and Transportation Department

Standard Specifications for Highway Construction (latest edition)

1.2 MEASUREMENT AND PAYMENT

Subsections 302.05 and 302.06 of the AHTD Standard Specifications for Highway Construction are NOT applicable. Measurement shall be by the ton for the items listed below, furnished and delivered to the various sites on the Pine Bluff Arsenal or areas on the Pine Bluff Arsenal.

Selected Material Class BAB(Bottom Ash Blend) Ton Selected Material Class (SM-2) Ton

1.3 STANDARD SPECIFICATIONS

Selected material shall conform to the provisions of Section 302 – SELECTED MATERIAL and all referenced sections therein of the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction”, except as specified herein. Reference hereinafter to the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction” will be by the basic designation “Standard Specifications”. The words “Chief Engineer” or “Engineer” in the Standard Specifications shall be interpreted to mean “Contracting Officer”. Copies of the Standard Specifications may be obtained from the Arkansas State Highway and Transportations Department, Little Rock, Arkansas, for approximately $10 per copy.

1.4 SUBMITTALS

The following shall be submitted in accordance with CONDITIONS, 3.0 SHOP AND

AS-BUILT DRAWINGS, SAMPLES, AND MANUFACTURER'S LITERATURE:

SD-07, Certificates of compliance

The Contractor shall furnish certificates of compliance with the requirements of Standard Specifications, Section 302.

PART 2 PRODUCTS

2.1 MATERIALS

Materials Class(SM-2) shall conform with the requirements provided under Section 302 of the Standard Specifications. BAB shall be a blend of bottom ash and fly ash byproducts from coal furnace combustion.

2.2 TESTS

All costs incurred in testing materials shall be borne by the Contractor.

SECTION 2651 Page 2 of 2

PART 3 EXECUTION

3.1 The selected material shall be furnished and delivered to the various sites and areas on the Pine Bluff Arsenal and end dumped neatly.

-- End of Section --

PART 1 GENERAL
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

File details come from the government source that posted it. Updated .