2655_QC_AND_ACCEPT.pdf
PDF 9 KB Posted
- Attached to
- ROADWAY MATERIAL
- Solicitation number
- W911RP-16-B-0001
About this file
Quality Control and Acceptance
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911RP16B00010001.pdf | ||
| 2816_RIPRAP.pdf | ||
| 2651_SELECTED_MATERIAL.pdf | ||
| SPECIFICATIONS.pdf | ||
| EXHIBIT_B.pdf | ||
| W911RP16B0001.pdf | ||
| 2652_AGGREGATE_BASE_COURSE_.pdf | ||
| ICE_MELT.pdf | ||
| GENERAL_REQUIREMENTS.pdf | ||
| EXHIBIT_A.pdf | ||
| 2802_CONCRETE.pdf | ||
| 2610_STONE_BACKFILL.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
QUALITY CONTROL AND ACCEPTANCE
SECTION 2655 Page 1 of 1
SECTION 2655
QUALITY CONTROL AND ACCEPTANCE
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
Arkansas State Highway and Transportation Department
Standard Specifications for Highway Construction (latest edition)
1.2 MEASUREMENT AND PAYMENT
Subsections 306.02 of the AHTD Standard Specifications for Highway Construction is applicable.
1.3 STANDARD SPECIFICATIONS
Quality control and acceptance shall conform to the provisions of Section 306 – QUALITY CONTROL AND ACCEPTANCE and all referenced sections therein of the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction”, except as specified herein. Reference hereinafter to the Arkansas State Highway and Transportation Department “Standard Specifications for Highway Construction” will be by the basic designation “Standard Specifications”. The words “Chief Engineer” or “Engineer” in the Standard Specifications shall be interpreted to mean “Contracting Officer”.
Copies of the Standard Specifications may be obtained from the Arkansas State Highway and Transportations Department, Little Rock, Arkansas, for approximately $10 per copy.
1.4 SUBMITTALS
None
PART 2 PRODUCTS
2.1 MATERIALS
None
2.2 TESTS
All costs incurred in testing materials shall be borne by the Contractor.
PART 3 EXECUTION
3.1 Quality control and acceptance shall be performed to assure the requirement of specifications are in accordance with Section 306 of the Standard Specifications or as other wise specified herein.
-- End of Section --
| PART 1 GENERAL |
| The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. |
File details come from the government source that posted it. Updated .