CPE CBRND Industry Day_BCIS-PPTS-SIS_1-1 Attendeees_18MAR26.pdf
PDF 89 KB Posted
- Attached to
- Portable Patient Transport System (PPTS) Final
- Solicitation number
- W911QY-26-S-PPTS-01
About this file
This document is a schedule for the JPM CBRN Protection Industry Day, a presolicitation event organized by the U.S. Department of Defense to engage industry stakeholders on three key capability areas: Biological Containment Isolation System (BCIS), Portable Patient Transport System (PPTS), and Shipboard Isolation System (SIS).
The schedule divides participating companies into two groups with staggered presentation times. Group 1 includes 11 companies scheduled between 12:00 PM and 3:40 PM in 20-minute intervals: P2 Mission Solutions, JGW Group Peke Safety LLC, Safe Decon Inc, Knight Aerospace, HDT Global, Valinor, LifePort LLC, ISOVAC Products, Inspire Rx LLC, EpiGuard AS, and Battelle. Group 2 includes six confirmed companies (GUILD ASSOCIATES INC, Stitch Partners LLC, Duke Human Vaccine Institute, Air, Univox LLC, and Carecubes Inc.) scheduled from 12:00 PM through 1:50 PM, with the remaining time slots unfilled. The event involves the participation of multiple federal agencies, as indicated by the official seals displayed on the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final Call for Solution PPTS (20May2026).docx | DOCX document | |
| Final Call for Solution PPTS (19May2026).docx | DOCX document | |
| Attachment 0002 PPTS Capabilities Assertion Matrix.xlsx | XLSX spreadsheet | |
| Updated PPTS Questions and Answers 15MAY2026.xlsx | XLSX spreadsheet | |
| Final AOS Statement of Objectives PPTS (14May2026).docx | DOCX document | |
| Questions and answers 14May2026.xlsx | XLSX spreadsheet | |
| Final Call for Solution PPTS (14May2026).docx | DOCX document | |
| Questions and answers PPTS.xlsx | XLSX spreadsheet | |
| Final Draft Call for Solution PPTS 12MAR2026..docx | DOCX document | |
| AOS Statement of Objectives PPTS_Final Draft (2026-03-12)..docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Group 1 Time Company
12:00 PM P2 Mission Solutions 12:20 PM JGW Group Peke Safety LLC 12:40 PM Safe Decon Inc 1:00 PM Knight Aerospace 1:30 PM HDT Global 1:50 PM Valinor 2:10 PM LifePort, LLC 2:30 PM ISOVAC Products 3:00 PM Inspire Rx LLC 3:20 PM EpiGuard AS 3:40 PM Battelle
Group 2 Time Company
12:00 PM GUILD ASSOCIATES INC
12:20 PM Stitch Partners LLC 12:40 PM Duke Human Vaccine Institute 1:00 PM Air 1:30 PM Univox LLC 1:50 PM Carecubes Inc.
2:10 PM -
2:30 PM
3:00 PM -
3:20 PM -
3:40 PM -
JPM CBRN Protection Industry Day 1-1 Schedule Biological Containment Isolation System (BCIS) Portable Patient Transport System (PPTS) Shipboard Isolation System (SIS)
File details come from the government source that posted it. Updated .