Attachment 2 - Bid Schedule.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC) for Construction
Solicitation number
W911QY25RAP03
Issued by

About this file

This is a bid schedule template for construction work on Building 45's first floor renovation project, covering approximately 5,400 square feet. The template is organized by Construction Specifications Institute (CSI) divisions 1-33 and includes columns for labor and materials costs for each division.

The bid schedule specifically calls out asbestos abatement work in Division 02, including full abatement of ACM within transite walls, floor tiles and associated mastic, fan coil units, and pipe insulation. The template requires bidders to break down costs for general requirements, site construction, concrete, masonry, metals, wood/plastics, thermal protection, doors/windows, finishes, specialties, equipment, furnishings, special construction, moving services, conveying systems, and all major building systems (plumbing, fire suppression, HVAC, automation controls, electrical, communications, and security). The form includes spaces for totaling labor, materials, overhead, profit, and bond costs to arrive at a final bid amount, with a project completion date of 12/10/2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Bid Form - Building 45, 1st floor, G6Date: 12/10/2024
Renovation of Building 45, 1st Floor (5,400 ft2)
DIVISIONUNIT OF MEASURELABORMATERIALSBID AMOUNT
Division 1 - General RequirementsJOB
01500 Temporary Construction Facilities & ControlsJOB
Division 2 - Site ConstructionJOB
02221 Building DemolitionJOB
028214 Asbestos Abatement- Full abatement of ACM within Transite WallsN/A
028214 Asbestos Abatement - Full abatement of ACM within floor tile and associated masticN/A
028214 Asbestos Abatement - Contained within and Associated fan coil units
N/A
028214 Asbestos Abatement - Full abatement of ACM within pipe insulationN/A
Division 3 - ConcreteJOB
Division 4 - MasonryJOB
Division 5 - MetalsJOB
Division 6 - Wood and PlasticsJOB
Division 7 - Thermal and Moisture ProtectionJOB
Division 8 - Doors and WindowsJOB
Division 9 - FinishesJOB
Division 10 - SpecialitiesJOB
Division 11 - EquipmentJOB
Division 12 - FurnishingsJOB
Division 13 - Special ConstructionJOB
MovingJOB
Division 14 - Conveying SystemsJOB
Division 22 - PlumbingJOB
Division 21 - Fire SuppressionJOB
Division 23 - Heating Ventilation, and Air Conditioning (HVAC)JOB
Division 25 - Intergrated Automation - controlsJOB
Division 26 - ElectricalJOB
Division 27 - CommunicationsJOB
Division 28 - Electronic Safety and SecurityJOB
Division 31 - EarthworkJOB$ - 0$ - 0
Division 32 - Exterior ImprovementsJOB$ - 0$ - 0
Division 33 - UtilitiesJOB$ - 0$ - 0
TOTAL LABOR$ - 0
TOTAL MATERIAL$ - 0
TOTAL MATERIAL AND LABOR$ - 0
OVERHEAD$ - 0
PROFIT$ - 0
BOND$ - 0
TOTAL BID$ - 0