Attachment 3 - Seed Project SOW.docx

DOCX document 323 KB Posted

Attached to
Natick Soldier Systems Center Multiple Award Task Order Contract (MATOC) for Construction
Solicitation number
W911QY25RAP03
Issued by

About this file

This Statement of Work (SOW) details renovation requirements for the DEVCOM SC G6 Helpdesk area in Building 45 at the US Army Natick Soldier Systems Center in Massachusetts. The project encompasses approximately 5,400 square feet across multiple rooms (R110, R111, R111A, R111B, R112, R112A, R114, R114A, R123, and R123A) and requires demolition work, installation of new architectural elements and finishes, mechanical duct rework, new electrical and data systems, and fire protection system installation.

The contractor must provide all labor, materials, and equipment for the renovation, with a performance period of 270 calendar days from Notice to Proceed. The scope includes logistics for moving IT assets out of and back into the renovation space, plus relocating stored IT assets from Building 4 to the newly renovated area. The project details are further specified in attached construction drawings covering architectural, mechanical, electrical, fire protection, fire alarm, and telecommunications components. This SOW is part of a broader Multiple Award Task Order Contract (MATOC) for construction at Natick Soldier Systems Center, with the formal solicitation expected in January 2025.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

29-Jul-14

DEPARTMENT OF THE ARMY

us army INSTALLATION MANAGEMENT command

US ARMY GARRISON DPW

NATICK SOLDIERS SYSTEMS CENTER

15 GENERAL GREENE AVENUE

NATICK MA 01760

STATEMENT OF WORK (SOW)

G4 Directorate DEVCOM SC Building 45 G6 Helpdesk Renovation 2 December 2024

1. General:

1.1. All work is to be performed for Building 45 Rooms R110, R111, R111A, R111B, R112, R112A, R114, R114A, R123 and R123A (approximately 5,400 square feet) of the DEVCOM SC G6 Helpdesk Renovation, located at the US Army Natick Soldier Systems Center (NSSC), General Greene Avenue (formerly Kansas St.), Natick, MA, 01760.

1.2. The Contractor shall provide all labor, materials and equipment necessary to perform all work outlined in this SOW and accompanying documents.

1.3. The Contractor shall be responsible for performing all work as outlined in this Statement of Work (SOW) and all associated contract documents including Project drawings/specifications, dated 14 November 2024 and accompanying documents, for the bid price submitted. The Contractor is responsible for reading entire SOW and accompanying documents included in this contract for a thorough understanding and comprehension of all content and requirements. The Contractor shall carefully review the field conditions prior to bidding and performing any work.

2. Project Descriptions:

2.1. Project consists of all work required for the renovation of the following spaces:

2.1.1. Provide demolition and renovation work as directed in the Contract Documents for the new G6 Helpdesk area. Work is to include, but not limited to, removal and disposal of selected items, installation of new architectural elements and finishes, rework of existing mechanical ducts and associated items, installation of new electrical and data work and the installation of a fire protection system.

2.1.2. Provide logistics to move Information Technology (IT) assets out of the space to be renovated, return the IT assets to the renovated space once the new space is completed, and move stored IT assets from Building 4 to the newly renovated space.

3. Period of Performance:

3.1. Period of performance for all work shall be 270 (two hundred seventy) calendar days from the date the Notice to Proceed (NTP) is issued.

3.2. Failure to complete the project by the stated completion date, when delay is not attributable to the Government will lead to a negative performance evaluation.

4. Scope of Demolition:

4.1. See demolition drawings.

5. Scope of Construction:

5.1. Scope of Architectural

5.1.1. See architectural drawings.

5.2. Scope of Mechanical

5.2.1. See mechanical drawings.

5.3. Scope of Electrical

5.3.1. See electrical drawings.

5.4. Scope of Fire Protection

5.4.1. See fire protection drawings.

5.5. Scope of Fire Alarm

5.5.1. See fire alarm drawings.

5.6. Scope of Telecommunications

5.6.1. See telecommunications.

SOW ATTACHMENTS:

1. Construction Drawings for B.45 Seed Project

2. Integrated Solid Waste Management Plan, US Army Natick Soldier Systems Center, Massachusetts, Issue Date January 2022

3. Safety and Accident Prevention Plan Table of Contents

END OF SOW

image1.png image2.wmf oleObject1.bin

File details come from the government source that posted it. Updated .