CWGS IFB Questions_Answers through 27 March.docx
DOCX document 731 KB Posted
- Solicitation number
- W911QY-24-B-0001
About this file
This document contains questions and answers related to the Cold Weather Glove System (CWGS) Invitation for Bid (IFB) solicitation number W911QY-24-B-0001. The IFB is for the procurement of the CWGS, which includes four component parts that must be delivered as either complete kits or individual components. Key details include:
The IFB requires the CWGS and all components to be Berry Amendment compliant, manufactured and have a place of performance within the United States. Vendors are required to have a quality management system that conforms to the ISO 9001-2015 standard, but a third-party certification is not needed. The government will provide patterns in Gerber AccuMark format, not DXF or DXFMA. Packaging and labeling requirements are specified, including individual component bags and larger kit bags. The government provided a sample demand tariff for glove sizes, but stated vendors should average their costs. No extension will be granted for material delays, and vendors must find alternate approved materials. Past performance evaluations will occur during the IDIQ contract lifecycle, not at bid submission.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CWGS IFB W911QY-24-B-0001 Questions and Answers 27 March
1. Does the Army have some sort of size/demand tariff with expected percentages of each size / CLIN being ordered? I don't see anything in the solicitation. We're running some preliminary costing models right now and demand tariffs at this quantity make a massive difference in pricing.
Answer: Below is a generic/notional tariff for gloves. Vendors should understand that the Government may choose to order completely different tariffs at any point during performance of the contract. They should make their best effort to average the costs for their bids.
| XS |
| 5% |
| S |
| 12% |
| M |
| 35% |
| L |
| 33% |
| XL |
| 15% |
2. Reference all MIL-DTL, 3.5.1 Basic Shell Material: the material is delayed and still has not been received. We respectfully request a 30-day extension to the proposal due date to account for material delays and PDM production.
Answer: Vendors who cannot get the required materials must find alternate but like materials for production of PDMs and submit them to the KO for approval. An extension will not be granted as this is an urgent requirement for the Army.
26 March
1. Regards to Production Readiness Review, if the production facility is at overseas, would the PRR take place at such production facilities? If not, how does a virtual PRR take place in this case?
Answer: Production facility must be within the United States. The requirement for the CWGS shall be Berry Amendment compliant. Please reference M.3.2.1.2. and C.7.5 of the IFB.
2. As per 52.225-18 PLACE OF MANUFACTURE (AUG 2018), contractors need to disclose where is the place of the Manufacturer. Is the place of manufacture considered as a determining factor of a winning bid? Does this IFB require or favor Domestic end products over Foreign-end products? Made in USA v.s. Non-Made in USA?
Answer: The CWGS and all components must be manufactured and have a Place of Performance within the United States to meet Berry Amendment compliance. Please reference M.3.2.1.2. and C.7.5 of the IFB.
3. G-3. PAST PERFORMANCE POINT OF CONTACT (POC): When should the contractor participate in the online evaluations, before or after the bid open?
Answer: Section G Past Performance evaluations will occur during the lifecycle of the awarded IDIQ contract(s) in response to this solicitation.
22 March
1. This is MIL-DTL-32707A. See figure 3 below:
Now, please read the below description:
3.5.14 Nylon tape. Nylon tape shall be used to secure the cord lock (see 3.5. 11 and figures 1 and J ) to the pinky side outer seam of the cuff. The tape shall be nylon, 3/8 or 5/16 inch in width, and conform to type III of MIL-DTL-5038
Based on the wording above, the nylon tape securing the cord lock should be lowered onto the cuff/hem underneath the stitch line. NOT where is it located in figure 3, which is above the stitch line. Please confirm where you intend the nylon tape that affixes the barrel lock to the glove to go.
Answer: The construction is correct as described and drawn. Nylon tape is secured above the cuff/hem stitchline. I attached a photo for reference. (See Reference 0001).
2. MIL-DTL-32707A, part 3.5.8 – Adjustable Lanyard does not define a finished length. Can you please confirm that a length is not required, and if a length is required, could you tell us what you want the length to be?
Additionally, is the adjustable lanyard a single component, or loop, that goes around the wrist, or is it a piece that is detachable from the hem?
Answer: Regarding the adjustable lanyard finished length, no, it is not defined in the spec. Figures 1 & 3 can be used as a guide. The adjustable lanyard is attached to the hem, it is sewn into the pinky side inside lining seam. It is not detachable and is used to secure the mittens to the wrist when not in use.
20 March
1. After reviewing the IFB, we wanted to gain clarity on the below- 52.246-11 Higher-Level Contract Quality Requirement (Dec 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO 9001:2015 or equivalent
Our understanding is that the Contractor must comply with the standards of ISO 9001:2015 not that they necessarily need the certification, correct? If they do need the certification, do they need it at time they submit their response, or if they are in the process and will have in time for award, would that meet the requirement?
Answer: A third-party certification is not required. The Contractor will need to provide documented evidence that they have a Quality Management System in use at the company that conforms to the ISO 9001-2015 standard. A quality management system (QMS) is defined as a formalized system that documents processes, procedures, and responsibilities for achieving quality policies and objectives. The QMS should define the Responsibilities of Management; Management of Resources and an organization’s work environment; Product realization, including the steps from design to delivery; Measurement, analysis, and improvement of the QMS through activities like internal audits and corrective and preventive action. QMS coordinates and directs an organization’s activities to meet customer and regulatory requirements and improve its effectiveness and efficiency on a continuous basis.
Quality management systems should address an organization’s needs; however, the elements all systems have in common include and may not be limited to:
| • | The organization’s quality policy and quality objectives |
| • | Quality manual |
| • | Procedures, instructions, and records |
| • | Data management |
| • | Internal processes |
| • | Customer Satisfaction from product quality |
| • | Improvement opportunities |
| • | Quality analysis |
14 March
1. Follow-up question: You wrote on March 7th:
Answer: There is a leather pinky gusset which is seamed along the side of the ring finger. Due to the visual angle of the drawn figure (below), it is not pictured.
Can the government confirm that this is ALSO a single needle topstitch?
Answer: It is also a single needle topstitch for the stitch within the green circle.
13 March
1. Do you by chance have the ability to send the patterns in a DXF or DXFMA format?
Answer: Pattern files for CWGS will only be provided in Gerber AccuMark format. Please refer to Section L.2.1.1. of the solicitation: “Government patterns will be provided in electronic format in a recent Gerber AccuMark version. For contractors without access to compatible AccuMark CAD and/or plotting capabilities it is recommended to utilize a 2nd party Pattern Service for pattern conversion and/or plotting.”
2. (Grammatical edit to answer of previous question on March 6th) - Can the government please read the bolded statements below pulled from the solicitation and clarify exactly how they would like everything to be packaged?
D.1 PACKAGING AND MARKING
Contractor shall package the CWGS as complete kits. A CWGS kit shall contain one pair (a pair consists of one left and one right component) of each of the four CWGS components of matching sizes. The CWGS kits shall be packaged in clear plastic bags.
The plastic bags shall have a white sticker label stating the item nomenclature (“Cold Weather Glove System”), contract number, Delivery Order number, and the CWGS kit Management Control Number (MCN) in human readable and barcode formats. Each CWGS kit shall include a Graphic Training Aid (GTA) as outlined in the Statement of Work (SOW).
Once bagged, the CWGS kits shall be packaged in accordance with the Attachment 0005 – Shipping Instructions) included in Section J.
The individual component pairs shall be packaged in clear plastic bags. The plastic bags shall have a white sticker label stating the component nomenclature, contract number, Delivery Order number, and appropriate National Stock Number (NSN) in human readable and barcode formats. Only Intermediate Cold Weather Glove pairs shall be packaged with a GTA as outlined in section C.3 of this SOW.
Once bagged, the individual component pairs shall be packaged in accordance with the Shipping Instructions included in Section J.
All kits and components must include labeling in accordance with labeling instructions provided in Section J. Individual components do not need to be bagged separately within a kit It says that individual components do not need to be bagged separately at the end, but above that, it says that each bag has to have the NSN and other info on the outside of the bag. In that case, that would suggest that in order to adequately label everything, each part of the CGWS DOES need to be bagged separately inside one large bag that also has a label indicating CGWS Kit.
Answer: The gloves will be required to be delivered in two possible configurations: 1. Complete Kits or 2. Individual Components. This is outlined in the CLIN structure. When delivered as Complete Kits, the individual components do not have to be individually bagged. Instead, all the components are packaged in one large kit bag that includes the four unbagged components. When delivered as Individual Components, then each pair must be packaged in a bag.
11 March
1. Can you confirm that patterns are available on DIBBs?
Answer: They are not available on DIBBs. Pattern requests shall follow the procedures listed in Section L.2.1.1. of the IFB.
7 March
1. The stitch circled in RED appears to be a single-needle topstitch, but is not referenced anywhere in the specification MIL-DTL-32709A. Can your team confirm that this is supposed to be a single needle topstitch, double needle topstitch, or clean finish?
Answer: This should be a single needle topstitch
2. Look at the green circle. The pattern file shows a seam here. Can you confirm whether or not there should be a seam here? Can you also confirm the date of the most recent pattern file (and send to me if possible)?
Answer: There is a leather pinky gusset which is seamed along the side of the ring finger. Due to the visual angle of the drawn figure (below), it is not pictured.
6 March 1 Is the Government able to update the specifications in a way that allows us to copy and paste text? It appears that the text in all three specs for the CGWS is rasterized as outlined paths instead of text that you can highlight. This makes it extremely challenging to navigate the document as we cannot use the Find feature to search for keywords.
Answer: Vendors can use the text recognition function in PDF in order to make the files searchable. Additionally, vendors can choose to use PDF to convert the files to Word format if they wish to copy/add text as they work on their proposals. We put two identical files for Attachments 0002, 0003 and 0004 are posted on SAM. One larger file has already gone through text recognition.
2 Can the government please read the bolded statements below pulled from the solicitation and clarify exactly how they would like everything to be packaged?
D.1 PACKAGING AND MARKING
Contractor shall package the CWGS as complete kits. A CWGS kit shall contain one pair (a pair consists of one left and one right component) of each of the four CWGS components of matching sizes. The CWGS kits shall be packaged in clear plastic bags.
The plastic bags shall have a white sticker label stating the item nomenclature (“Cold Weather Glove System”), contract number, Delivery Order number, and the CWGS kit Management Control Number (MCN) in human readable and barcode formats. Each CWGS kit shall include a Graphic Training Aid (GTA) as outlined in the Statement of Work (SOW).
Once bagged, the CWGS kits shall be packaged in accordance with the Attachment 0005 – Shipping Instructions) included in Section J.
The individual component pairs shall be packaged in clear plastic bags. The plastic bags shall have a white sticker label stating the component nomenclature, contract number, Delivery Order number, and appropriate National Stock Number (NSN) in human readable and barcode formats. Only Intermediate Cold Weather Glove pairs shall be packaged with a GTA as outlined in section C.3 of this SOW.
Once bagged, the individual component pairs shall be packaged in accordance with the Shipping Instructions included in Section J.
All kits and components must include labeling in accordance with labeling instructions provided in Section J. Individual components do not need to be bagged separately within a kit It says that individual components do not need to be bagged separately at the end, but above that, it says that each bag has to have the NSN and other info on the outside of the bag. In that case, that would suggest that in order to adequately label everything, each part of the CGWS DOES need to be bagged separately inside one large bag that also has a label indicating CGWS Kit.
Answer: The gloves will be delivered to be delivered in two possible configurations: 1. Complete Kits or 2. Individual Components. This is outlined in the CLIN structure. When delivered as Complete Kits, the individual components do not have to be individually bagged. Instead, all the components are packaged in one large kit bag that includes the four unbagged components. When delivered as Individual Components, then each pair must be packaged in a bag.