This document contains a Production Readiness Review template for the Product Manager Soldier Clothing & Individual Equipment. The template outlines criteria for assessing a vendor's manufacturing readiness level for an upcoming contract to produce a Cold Weather Glove System. The audit criteria address design validation, production measures, risk mitigation plans, delivery schedules, alternative sourcing, material procurement, facilities, tooling, staff training, documentation, production planning, and quality control processes. The template also includes sections to document audit findings and determine whether the criteria for achieving a manufacturing readiness level of 8 have been met.

View the file

Other files

File Type Posted
Attachment 0009 - CWGS IFB Questions_Answers through 30 April.pdf PDF
B08 - W911QY-24-B-0001 Amendment 0002 (Amendment Copy).pdf PDF
B08 - W911QY-24-B-0001 Amendment 0002 (Conformed Copy).pdf PDF
CWGS IFB Questions_Answers through 30 April.pdf PDF
CWGS IFB Questions_Answers through 26 April.docx DOCX document
CWGS IFB Questions_Answers through 24 April.docx DOCX document
CWGS IFB Questions_Answers through 22 April.docx DOCX document
CWGS IFB Questions_Answers through 18 April.docx DOCX document
B08 - W911QY-24-B-0001 Amendment 0001 (Conformed Copy).pdf PDF
B08 - W911QY-24-B-0001 Amendment 0001 (Amendment Copy).pdf PDF
CWGS IFB Questions_Answers through 15 April.docx DOCX document
CWGS IFB Questions_Answers through 9 April.docx DOCX document
CWGS IFB Questions_Answers through 2 April.docx DOCX document
CWGS IFB Questions_Answers through 28 March.docx DOCX document
CWGS IFB Questions_Answers through 27 March.docx DOCX document
CWGS IFB Questions_Answers through 26 March.docx DOCX document
Reference 0001.jpg JPG image
CWGS IFB Questions_Answers through 20 March.docx DOCX document
CWGS IFB Questions_Answers through 14 March.docx DOCX document
CWGS IFB Questions_Answers through 13 March.docx DOCX document
CWGS IFB Questions_Answers through 7 March.docx DOCX document
Attachment 0003 - MIL-DTL-32708A MittLiner 01.30.24.pdf PDF
Attachment 0004 - MIL-DTL-32709A ICWG 01.30.24.pdf PDF
Attachment 0002 - MIL-DTL-32707A MittShells 01.30.24.pdf PDF
Attachment 0005 - Shipping Instructions Rev 15 Dated 8 June 2022.pdf PDF
Attachment 0001 - MIL-DTL-32075A Label for Clothing Equipage and Tentage.pdf PDF
Attachment 0007 - Pricing Schedule.xlsx XLSX spreadsheet
Attachment 0003 - MIL-DTL-32708A MittLiner 01.30.24.pdf PDF
Attachment 0002 - MIL-DTL-32707A MittShells 01.30.24.pdf PDF
Attachment 0008 CWGS GTA Draft - 31 Oct 23.pdf PDF
B08 - W911QY-24-B-0001 CWGS IFB Final.pdf PDF
Attachment 0004 - MIL-DTL-32709A ICWG 01.30.24.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRODUCT MANAGER SOLDIER CLOTHING & INDIVIDUAL EQUIPMENT (PM SCIE)

PRODUCTION READINESS REPORT (PRR) AUDIT

Auditor(s):

Contract:

Auditing Organization:
PM SCIE
Company:

Audit Date: MM/00/YYYY

Audit Location:

Auditee(s):

Audit Criteria:

The review criteria is embedded below in the Criteria column of Table 1, PRR Report Summary Matrix Audit Type, Objectives and Scope:

This Production Readiness Review is to determine that (Insert Vendor Name) is in compliance to a minimum Manufacturing Readiness Level 8 for:

Summary of Audit Findings:

PM SCIE considers all aspects of the PRR to have met the requirements of MRL 8.

Prepared By:
Quality Assurance Specialist Product Manager Soldier Clothing & Individual Equipment

Senior Acquisition Support Product Manager Soldier Clothing & Individual Equipment

Approved By:
Chief Quality Assurance

Product Manager Soldier Clothing & Individual Equipment

Table 2: PRR Report Summary Matrix

PRR Criteria
Results
PRR Criteria Met/Not Met

The design is appropriately validated by CCDC-Engineering Team.

Adequate measures are in place to support production: Personnel, equipment, infrastructure, raw materials, subcontractor relationships.

Design-for-manufacturing considerations ensure ease and efficiency of production and assembly.

Risks have been identified, credibly assessed, and characterized; and mitigation efforts have been defined.

Delivery schedules have been verified. (If not at this stage, a discussion of production capacity to meet contract delivery expectations).

Table 2: PRR Audit Report Summary Matrix (continued)

PRR Criteria
Results
PRR Criteria Met/Not Met

Alternative sources for resources have been identified, as appropriate.

Adequate raw materials are on hand or have been planned and budgeted.

Required facilities and tools are sufficient for end item production.

Specified special tools and test equipment are available in proper quantities.
.

Production and support staff are trained and qualified.

Drawings or Patterns created, reviewed and are certified.

Production engineering and planning are sufficiently mature for production.

Production processes and methods are consistent with quality requirements, First Article Test Samples, contract requirements.

Qualified suppliers are identified, audited, and available with materials that are to be procured.

Purchase Orders are reviewed and validated (i.e. Berry Compliance is verified); as appropriate, evidence that the subcontractors have all necessary drawings or patterns, product samples were received and deemed acceptable.

Qualified suppliers are available for materials that are to be procured: Subcontractor facility and resources are verified and validated by the Prime Contractor; subcontractor production readiness verification letter and evidence that all purchase orders have been awarded or ready to be awarded.

Summary of Findings

Company: I Audit Date:

Summary:

CC:

APM:

Contracting Officer:

Contracting Specialist:

Vendor:

DCMA: