EEAAD_CDRL_A009_-_POI_Maintainer.pdf

PDF 222 KB Posted

Attached to
RFP - Enhanced Electronic Automatic Activation Device (EEAAD) Federal contract opportunity
Solicitation number
W911QY-19-R-0007
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document is a Contract Data Requirements List (CDRL) outlining deliverables required under the Enhanced Electronic Automatic Activation Device (EEAAD) contract. The contractor must submit various drafts and final versions of a Program of Instruction for a maintainer course, including an initial draft 30 days after submitting commercial manuals and supplemental information, a second draft 30 days following completion of developmental testing, and final reproducible copies 30 days after completion of instructor and key personnel training. Deliverables are to be submitted electronically to the Army Sustainment Command and in Microsoft Word format following the Army's standard training approach. Pricing is to be provided using one of four defined groups based on the level of effort required to conform to government requirements. The first submission and final deliverables require a letter of transmittal and receiving report submitted through the Wide Area Workflow system.

Exhibit I CDRL A009 - Program of Instruction (POI) - Maintainer

View the file

Other files for this federal contract opportunity

Other files attached to RFP - Enhanced Electronic Automatic Activation Device (EEAAD), newest first.
File Type Posted
EEAAD_CDRL_A024_-_First_Production_Lot_Report.pdf PDF
EEAAD_CDRL_A017_-_SW_Configuration_Mgmt_Plan.PDF PDF
EEAAD_CDRL_A014_-_Lesson_Plan_Operator.pdf PDF
EEAAD_CDRL_A019_-_SW_System_Engineering_Verif_&_Valid_Plan_Docs.PDF PDF
Attachment_0004_-_Peckham_General_Vendor_Shipping_Instr.pdf PDF
EEAAD_CDRL_A020_-_SW_Support_Environment.PDF PDF
EEAAD_CDRL_A010_-_LMI_Data_Products.pdf PDF
EEAAD_CDRL_A001_COTS_Manual_signed.pdf PDF
EEAAD_CDRL_A005_-_Support_Analysis_Summaries.pdf PDF
EEAAD_CDRL_A015_-_Lesson_Plan_-Maintainer.pdf PDF
EEAAD_CDRL_A016_-_Conduct_of_Training.pdf PDF
EEAAD_CDRL_A018_-_Software_Development_Plan.PDF PDF
Attachment_0005_-_Small_Business_Participation_Commitment_Document.pdf PDF
EEAAD_CDRL_A006_-_Provisioning_Parts_List.pdf PDF
EEAAD_CDRL_A013_-_Operator.pdf PDF
EEAAD_CDRL_A007_-_Eng_Data_for_Provisioning.pdf PDF
W911QY-19-R-0007_-_EEAAD_RFP.pdf PDF
EEAAD_CDRL_A012_-_Mission.pdf PDF
EEAAD_CDRL_A023_-_Inspection_Plan.pdf PDF
Attachment_0003_-_Processing_Unit_pocket.pdf PDF
EEAAD_CDRL_A011_-_Special_Packaging_Instructions.pdf PDF
EEAAD_CDRL_A021_-SW_System_Engineering_Verif_&_Valid_Docs.PDF PDF
EEAAD_CDRL_A022_-_Risk_and_Security_Governance_Report.pdf PDF
EEAAD_CDRL_A002_-_Validation_Plan_for_COTS_Manual_&_Supplemental_Info.pdf PDF
EEAAD_CDRL_A008_-_POI_Operator.pdf PDF
EEAAD_CDRL_A003_-_Validation_Report_for_COT_Manual_&_Supplemental_Info.pdf PDF
Attachment_0002_-_NDA_for_Control_Unit_Pocket.pdf PDF
EEAAD_CDRL_A004_-_Maintenance_Allocation_Chart.pdf PDF
Attachment_0001_-_Control_Unit_Pocket.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

1_DATA_ITEM_NO: A009
2_TITLE_OF_DATA_ITEM: Training Conduct Support Document
3_SUBTITLE: Program of Instruction (POI #2) (Maintainer)
4_AUTHORITY_Data_Acquisit: DI-SESS-81523B
5_CONTRACT_REFERENCE: EEAAD RFP
6_REQUIRING_OFFICE: AMSTA-LCS-ECL
7_DID_250_REQ: DD
8_APP_CODE: A
DIST_STATEMENT: N/A
10_FREQUENCY:
11_AS_OF_DATE: 23 Jan 19
12_DATE_OF_FIRST_SUBMISSI: See Block 16
13_DATE_OF_SUBSEQUENT_SUB: See Block 16
addressee1: AMSTA-LCS-ECL
draft1:
reg1:
repro1:
addressee2: Electronic
draft2: 2
reg2: 2
repro2: 2
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 2
total_repro: 2
16_REMARKS: The first draft shall be submitted 30 calendar days after the initial Commercial off-the-shelf (COTS) Manual and supplemental information (reference A001) submission.

The second draft of the Maintainer POI shall be submitted 30 calendar days after the completion of Developmental Testing (DT).

The final draft of the Maintainer POI shall be delivered 30 calendar days after the completion of Operational Testing (OT) to include changes from training.

The final reproducible copies of the Maintainer POI shall be submitted 30 calendar days after completion of Instructor and Key Personnel Training (IKPT).

The government will have 45 calendar days to review and accept or reject all submissions.

All training material shall be in Microsoft Word, in the Standard Army Systems Approach to Training (ASAT) format. Two final copies shall be submitted on CD-ROM.

The initial and second submissions shall be forwarded with a letter of transmittal as cover. Upon notification of the final deliverable acceptance by the Government, the Contractor can submit the Receiving Report (DD 250) through the Wide Area Work Flow (WAWF).

Reference DI-SESS-81523B, AR 350-1 and TRADOC regulation 350-70.

17_PRICE_GROUP:
ESTIMATED_TOTAL_PRICE:
G_PREPARED_BY:
H_DATE:
1_APPROVED_BY:
J_DATE:
Page:
reg38t: 2
A_CONTRACT_LINE_ITEM_NO:
B_EXHIBIT: J
TDP:
TM:
OTHER:
DSYSTEMITEM: Enhanced Electronic Automatic Activation Device (EEAAD)
E_CONTRACTPR_NO:
FCONTRACTOR:
16_REMARKS_Continued:
Page2:
of_pages:
Reset:
2019-01-23T16:22:34-0500
SKELLY.ELIZABETH.A.1228539720
2019-01-25T05:56:54-0500
LEON.DONNA.LEI.1057014586

File details come from the government source that posted it. Updated .