EEAAD_CDRL_A001_COTS_Manual_signed.pdf

PDF 233 KB Posted

Attached to
RFP - Enhanced Electronic Automatic Activation Device (EEAAD) Federal contract opportunity
Solicitation number
W911QY-19-R-0007
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This Contract Data Requirements List (CDRL) outlines submission requirements for a COTS manual and supplemental information for an Enhanced Electronic Automatic Activation Device (EEAAD) to be provided under contract to the Department of the Army. First submission of the COTS manual and supplemental information is due 45 days after contract award, with subsequent submissions due 45 days prior to logistics demonstration, operational testing, and within 10 and 30 days after completion of those events. A final reproducible copy is due 30 days following incorporation of government comments from a verification conference. Submissions are reviewed and accepted or rejected by the government within 15 to 20 days. If rejected, corrections and resubmission are allowed within 15 to 20 days. The Army Materiel Command Army Contracting Command is listed as the contracting agency.

Exhibit A CDRL A001 - COTS Manual

View the file

Other files for this federal contract opportunity

Other files attached to RFP - Enhanced Electronic Automatic Activation Device (EEAAD), newest first.
File Type Posted
EEAAD_CDRL_A024_-_First_Production_Lot_Report.pdf PDF
EEAAD_CDRL_A009_-_POI_Maintainer.pdf PDF
EEAAD_CDRL_A017_-_SW_Configuration_Mgmt_Plan.PDF PDF
EEAAD_CDRL_A014_-_Lesson_Plan_Operator.pdf PDF
EEAAD_CDRL_A019_-_SW_System_Engineering_Verif_&_Valid_Plan_Docs.PDF PDF
Attachment_0004_-_Peckham_General_Vendor_Shipping_Instr.pdf PDF
EEAAD_CDRL_A020_-_SW_Support_Environment.PDF PDF
EEAAD_CDRL_A010_-_LMI_Data_Products.pdf PDF
EEAAD_CDRL_A006_-_Provisioning_Parts_List.pdf PDF
EEAAD_CDRL_A013_-_Operator.pdf PDF
EEAAD_CDRL_A007_-_Eng_Data_for_Provisioning.pdf PDF
W911QY-19-R-0007_-_EEAAD_RFP.pdf PDF
EEAAD_CDRL_A012_-_Mission.pdf PDF
EEAAD_CDRL_A023_-_Inspection_Plan.pdf PDF
Attachment_0003_-_Processing_Unit_pocket.pdf PDF
EEAAD_CDRL_A011_-_Special_Packaging_Instructions.pdf PDF
EEAAD_CDRL_A005_-_Support_Analysis_Summaries.pdf PDF
EEAAD_CDRL_A015_-_Lesson_Plan_-Maintainer.pdf PDF
EEAAD_CDRL_A016_-_Conduct_of_Training.pdf PDF
EEAAD_CDRL_A018_-_Software_Development_Plan.PDF PDF
Attachment_0005_-_Small_Business_Participation_Commitment_Document.pdf PDF
EEAAD_CDRL_A021_-SW_System_Engineering_Verif_&_Valid_Docs.PDF PDF
EEAAD_CDRL_A022_-_Risk_and_Security_Governance_Report.pdf PDF
EEAAD_CDRL_A002_-_Validation_Plan_for_COTS_Manual_&_Supplemental_Info.pdf PDF
EEAAD_CDRL_A008_-_POI_Operator.pdf PDF
EEAAD_CDRL_A003_-_Validation_Report_for_COT_Manual_&_Supplemental_Info.pdf PDF
Attachment_0002_-_NDA_for_Control_Unit_Pocket.pdf PDF
EEAAD_CDRL_A004_-_Maintenance_Allocation_Chart.pdf PDF
Attachment_0001_-_Control_Unit_Pocket.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

C. CATEGORY:

TDP _ _ TM _ _ OTHER _X__

D. SYSTEM/ITEM

Enhanced Electronic Automatic Activation Device (EEAAD)

E. CONTRACT/PR NO.

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

COTS Manual with Supplemental Information (1st, 2nd, 3rd, 4th, and FRC) for the EEAAD Submissions

3. SUBTITLE

COTS Manual for the Enhanced Electronic Automatic Activation Device (EEAAD)

4. AUTHORITY (Data Acquisition Document No.)

DI-MISC-80759A/DI-CMAN-80792A

5. CONTRACT REFERENCE

MIL-PRF-32216A

6. REQUIRING OFFICE

AMSTA-LCS-E

7. DD 250 REQ

DD

9. DIST

STATEMENT

A

10. FREQUENCY

5 T

12. DATE OF 1ST SUBMISSION

See Block 16

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

8. APP CODE

A

11. AS OF DATE

23 January 2019

13. DATE OF SUBSEQUENT

SUBMISSION See Block 16 Draft Final

Reg Repro

16. REMARKS

The FIRST SUBMISSION of the COTS manual and any supplemental information shall be due 45 calendar days after contract award. The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 15 calendar days after start of validation.

The SECOND SUBMISSION of the COTS manual and any supplemental information is due 45 calendar days prior to the Logistics Demonstration (Log Demo). The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 15 calendar days of the conclusion of Log Demo.

The THIRD SUBMISSION of the COTS manual and any supplemental information shall be due 45 calendar days prior to Operational Testing (OT). The Government will determine acceptance or rejection of the submission within 20 calendar days of receipt. If rejected, Contractor shall have 20 calendar days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 20 calendar days.

The FOURTH SUBMISSION of the COTS manual and any supplemental information shall be due 10 calendar days after the completion of OT. The Government will determine acceptance or rejection of the submission within 15 calendar days of receipt. If rejected, Contractor shall have 15 days to correct any errors and resubmit to the Government. If accepted, Contractor will receive Government’s review comments within 30 calendar days.

The Verification Conference shall take place 45 days after Government's acceptance of the fourth submission.

A FINAL REPRODUCIBLE COPY (FRC) is due 30 days after Contractor's receipt of Government's master mark-up of COTS manual and any supplemental information resulting from the Verification Conference. The Government will review and determine acceptance or rejection of the submission within 20 days of receipt. If rejected, Contractor shall have 20 days to correct any errors and resubmit to the Government.

The First, Second, Third, Fourth, and FRC submissions may be delivered to the Government representative electronically. Each submission shall be sent with a letter of transmittal and will be considered a draft until accepted by the Government.

AMSTA-LCS-E

1st Submission 1 1

2nd Submission 1 1

3rd Submission 1 1

4th Submission 1 1

FRC 1 1

SFAE-SDR-SCIE

1st Submission 1

2nd Submission 1

3rd Submission 1

4th Submission 1

FRC 1 1

15. TOTAL --------- 10 6

G. PREPARED BY

H. DATE

I. APPROVED BY

J. DATE

DD Form 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages

17. PRICE

GROUP

18. ESTIMATED

TOTAL PRICE

2019-01-24T12:11:01-0500
LONGLEY.DEBRA.ANNE.1398400026
2019-01-25T05:54:36-0500
LEON.DONNA.LEI.1057014586

File details come from the government source that posted it. Updated .