SOW Resources Boiler Plate.doc
DOC document 71 KB Posted
- Solicitation number
- W911PT21Q0041
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 20PW062_SOW.docx | DOCX document | |
| A1 - Grating Plan View.pdf | ||
| W911PT21Q0041P00001 - Solicitation Amendment.pdf | ||
| SITEVISIT.doc | DOC document | |
| 20PW200_SOW_REV1.docx | DOCX document | |
| A2 - Cutout Plan View.pdf | ||
| edoc.pub_icri-310-2r-2013.pdf | ||
| 02 82 13 - WVA Asbestos Abatement.docx | DOCX document | |
| SOW - 20PW200.docx | DOCX document | |
| A1 - Site Plan - 20PW200.pdf | ||
| SOW - 20PW206.docx | DOCX document | |
| S1 - Site Plan Details - 20PW206.pdf | ||
| W911PT21Q0041 - Solicitation.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW BOILERPLATE REQUIREMENTS
Standardized Requirements, Products, and Admin for SOW Preparation
Revised: 26 April 2016 The following are simple standardized items to COPY / PASTE from this document to SOW.
This document lists common, recurring, non-complex requirements to improve SOW consistency.
Items are organized by specification #, listed for cross-reference to UFGS Guide Specification:
http://www.wbdg.org/ccb/browse_cat.php?c=3
Copy / Paste [BLACK] text verbatim.
[BLUE] text is CONDITIONAL – Change or delete as necessary AFTER YOU’VE PASTED TO SOW.
Not Used.
DIVISION 0 General Requirements SOW Template is maintained with latest Division 1 general requirements.
DIVISION 1 Existing Conditions
· 02 00 00 - Existing Conditions
· 02 10 00 - Unassigned
· 02 20 00 - Assessment
· 02 30 00 - Subsurface Investigation
· 02 40 00 - Demolition and Structure Moving
· 02 50 00 - Site Remediation
· 02 60 00 - Contaminated Site Material Removal.
· SOIL EXCAVATION
A. Excess excavation soil may be temporarily placed behind Building 136 (boiler plant). Clean soil shall not be mixed with environmentally contaminated/hazardous soil/materials. Soils from different projects shall not be mixed together.
B. The Contractor shall remove all excess clean soil from the Arsenal at the end of the project.
C. Environmentally contaminated/hazardous soil/materials will be placed on two (2) layers of six (6) mil polyethylene, covered with one (1) layer of six (6) polyethylene, batted down and labeled by the contractor. The Arsenal will test and dispose of environmentally contaminated/hazardous soil/materials.
· 02 70 00 - Water Remediation
· 02 80 00 - Facility Remediation
· 02 90 00 - Unassigned
DIVISION 2 Concrete
· 03 00 00 - Concrete
· 03 10 00 - Concrete Forming and Accessories
· 03 20 00 - Concrete Reinforcing
· 03 30 00 - Cast-in-Place Concrete
· 03 40 00 - Precast Concrete
· 03 50 00 - Cast Decks and Underlayment
· 03 60 00 - Grouting
· 03 70 00 - Mass Concrete
· 03 80 00 - Concrete Cutting and Boring
· 03 90 00 - Unassigned
DIVISION 3 Masonry
· 04 00 00 - Masonry
· 04 10 00 - Unassigned
· 04 20 00 - Unit Masonry
· 04 30 00 - Unassigned
· 04 40 00 - Stone Assemblies
· 04 50 00 - Refractory Masonry
· 04 60 00 - Corrosion-Resistant Masonry
· 04 70 00 - Manufactured Masonry
· 04 80 00 - Unassigned
· 04 90 00 - Unassigned
DIVISION 4 Metals
· 05 00 00 - Metals
· 05 10 00 - Structural Metal Framing
· 05 20 00 - Metal Joists
· 05 30 00 - Metal Decking
· 05 40 00 - Cold-Formed Metal Framing
· 05 50 00 - Metal Fabrications
· 05 60 00 - Unassigned
· 05 70 00 - Decorative Metal
· 05 80 00 - Unassigned
· 05 90 00 - Unassigned
DIVISION 5 Wood, Plastics, Composites
· 06 00 00 - Wood, Plastics, Composites
· 06 10 00 - Rough Carpentry
· 06 20 00 - Finish Carpentry
· 06 30 00 - Unassigned
· 06 40 00 - Architectural Woodwork
· 06 50 00 - Structural Plastics
· 06 60 00 - Plastic Assemblies
· 06 70 00 - Structural Composites
· 06 80 00 - Composite Fabrications
· 06 90 00 - Unassigned
DIVISION 6 Thermal and Moisture Protection
· 07 00 00 - Thermal and Moisture Protection
· 07 10 00 - Dampproofing and Waterproofing
· 07 20 00 - Thermal Protection
· 07 25 00 - Weather Barriers
· 07 30 00 - Steep Slope Roofing
· 07 40 00 - Roofing and Siding Panels
· 07 50 00 - Membrane Roofing.
· MEMBRANE ROOF PATCH/REPAIRS (UNDER WARRANTY)
A. Membrane Roof Patching and Repairs (Roofing Systems under Warranty).
1. The Contractor shall make all roofing patches and repairs IAW the existing roofing system warranty. The warranty will be provided to the Contractor by the Project COR for reference and information.
2. The existing roofing warranty shall be maintained after patching and repair work is complete, to include, but not limited to; Work performed by a qualified vendor of the roofing system, the use of only those materials and work practices specified by the roofing system manufacturer, and the inspection and/or testing of the patch/repair work by a qualified roofing vendor after work is complete.
3. The contractor shall obtain a signed certification from the roofing manufacturer stating that the existing roofing warranty has been maintained after the patch/repair work was completed. The signed certification shall be provided to the project COR prior to the project being considered complete.
· 07 60 00 - Flashing and Sheet Metal
· 07 70 00 - Roofing and Wall Specialties and Accessories
· 07 80 00 - Fire and Smoke Protection
· 07 90 00 - Joint Protection
DIVISION 7 Openings
· 08 00 00 - Openings
· 08 10 00 - Doors and Frames
· 08 20 00 - Unassigned
· 08 30 00 - Specialty Doors and Frames
· 08 40 00 - Entrances, Storefronts, and Curtain Walls
· 08 50 00 - Windows
· 08 60 00 - Roof Windows and Skylights
· 08 70 00 - Hardware
· 08 80 00 - Glazing
· 08 90 00 - Louvers and Vents
DIVISION 8 Finishes
· 09 00 00 - Finishes
· 09 10 00 - Unassigned
· 09 20 00 - Plaster and Gypsum Board.
· GYPSUM WLALBOARD, PATCH REPAIR
A. The Contractor shall repair, patch, install and finish new drywall wallboard [where indicated] to bring the wall surfaces to a smooth, sturdy and professional appearance.
B. All corners shall include metal corner bead and be clean and straight.
C. Repair all holes or damaged areas over one (1) square inch by cutting and patching a new piece of wallboard in place.
D. All seams shall be taped with drywall tape manufactured for this purpose.
E. Match repairs to thickness of adjacent wallboard.
F. Drywall shall have a level 3 or better finish (smooth and without obvious blemishes, seams, pitting or sanding grooves when painted with semi-gloss paint).
G. For wet areas, use mold/mildew resistant drywall.
· INTERIOR WALLS
A. Interior Walls.
1. 3-5/8” 16 ga metal studs.
2. 3-5/8” 18 ga tracks.
3. 5/8” wallboard, gypsum, “Type X” for fire rated walls.
4. 3-1/2” sound attenuating batt insulation, fiberglass.
5. Fire stopping material and application shall meet ASTM E 814, UL 1479.
· 09 30 00 - Tiling
· 09 40 00 - Unassigned
· 09 50 00 - Ceilings
· 09 60 00 – Floorings.
· BLOCK FLOORING
A. Block Flooring.
1. Blocks shall be two (2) inches thick, four (4) inches wide, and six (6) inches long. Permissible variations shall not exceed 1/16 inch in depth and 1/8 inch in width and length.
2. Blocks shall be composed of recycled/ reclaimed materials.
3. Blocks shall be Fibre[B]lock II, or equivalent. The company’s website is http://kaswell.com. Any variation must be approved by the government and a sample must be submitted for approval.
B. Block Floor Adhesive
1. Kaswell’s S-2705 White Adhesive or equivalent.
C. Block Floor Sealer
1. Kaswell’s D1261 Black Latex Sealer or equivalent.
D. Floor Leveler
1. Maxxon Corp’s Level-Right or equivalent.
· 09 70 00 - Wall Finishes
· 09 80 00 - Acoustic Treatment
· 09 90 00 - Painting and Coating
DIVISION 9 Specialties
· 10 00 00 - Specialties
· 10 10 00 - Information Specialties
· 10 20 00 - Interior Specialties
· 10 30 00 - Fireplaces and Stoves
· 10 40 00 - Safety Specialties
· 10 50 00 - Storage Specialties
· 10 60 00 - Unassigned
· 10 70 00 - Exterior Specialties
· 10 80 00 - Other Specialties
· 10 90 00 - Unassigned
DIVISION 10 Equipment
· 11 00 00 - Equipment
· 11 10 00 - Vehicle and Pedestrian Equipment
· 11 15 00 - Security, Detention, and Banking Equipment
· 11 20 00 - Commercial Equipment
· 11 30 00 - Residential Equipment
· 11 40 00 - Foodservice Equipment
· 11 50 00 - Educational and Scientific Equipment
· 11 60 00 - Entertainment Equipment
· 11 65 00 - Athletic and Recreational Equipment
· 11 70 00 - Healthcare Equipment
· 11 80 00 - Collection and Disposal Equipment
· 11 90 00 - Other Equipment
DIVISION 11 Furnishings
· 12 00 00 - Furnishings
· 12 10 00 - Art
· 12 20 00 - Window Treatments
· 12 30 00 - Casework
· 12 40 00 - Furnishings and Accessories
· 12 50 00 - Furniture
· 12 60 00 - Multiple Seating
· 12 70 00 - Unassigned
· 12 80 00 - Unassigned
· 12 90 00 - Other Furnishings
DIVISION 12 Special Construction
· 13 00 00 - Special Construction
· 13 10 00 - Special Facility Components
· 13 20 00 - Special Purpose Rooms
· 13 30 00 - Special Structures
· 13 40 00 - Integrated Construction
· 13 50 00 - Special Instrumentation
· 13 60 00 - Unassigned
· 13 70 00 - Unassigned
· 13 80 00 - Unassigned
· 13 90 00 - Unassigned
DIVISION 13 Conveying Equipment
· 14 00 00 - Conveying Equipment
· 14 10 00 - Dumbwaiters
· 14 20 00 - Elevators
· 14 30 00 - Escalators and Moving Walks
· 14 40 00 - Lifts
· 14 50 00 - Unassigned
· 14 60 00 - Unassigned
· 14 70 00 - Turntables
· 14 80 00 - Scaffolding
· 14 90 00 - Other Conveying Equipment
DIVISION 21 Fire Suppression
· 21 00 00 - Fire Suppression
· 21 10 00 - Water-Based Fire-Suppression Systems
· 21 20 00 - Fire-Extinguishing Systems
· 21 30 00 - Fire Pumps
· 21 40 00 - Fire Suppression Water Storage
· 21 50 00 - Unassigned
· 21 60 00 - Unassigned
· 21 70 00 - Unassigned
· 21 80 00 - Unassigned
· 21 90 00 - Unassigned
DIVISION 22 Plumbing
· 22 00 00 - Plumbing
· 22 10 00 - Plumbing Piping and Pumps
· 22 20 00 - Unassigned
· 22 30 00 - Plumbing Equipment
· 22 40 00 - Plumbing Fixtures
· SHOWER/TUB CONTROL VALVES
A. Individual shower and tub-shower combination valves shall be balanced-pressure, thermostatic or combination balanced-pressure/thermostatic valves that conform to the requirements of ASSE 1016 or ASME A112.18.1/CSA B125.1 and shall be installed at the point of use.
B. Shower and tub-shower combination valves shall be equipped with a means to limit the maximum setting of the valve to 120°F (49°C), which shall be field adjusted in accordance with the manufacturer's instructions.
C. In-line thermostatic valves shall not be utilized as protection against scalding.
· 22 50 00 - Pool and Fountain Plumbing Systems
· 22 60 00 - Gas and Vacuum Systems for Laboratory and Healthcare Facilities
· 22 70 00 - Unassigned
· 22 80 00 - Unassigned
· 22 90 00 - Unassigned
DIVISION 23 Heating, Ventilating, and Air Conditioning (HVAC)
· 23 00 00 - Heating, Ventilating, and Air Conditioning (HVAC)
· 23 10 00 - Facility Fuel Systems
· 23 20 00 - HVAC Piping and Pumps
· 23 30 00 - HVAC Air Distribution
· 23 40 00 - HVAC Air Cleaning Devices
· 23 50 00 - Central Heating Equipment
· 23 60 00 - Central Cooling Equipment
· 23 70 00 - Central HVAC Equipment
· 23 80 00 - Decentralized HVAC Equipment
· 23 90 00 - Unassigned
DIVISION 24 Integrated Automation
DIVISION 25 N/A
DIVISION 26 Electrical
· 26 00 00 - Electrical
· 26 10 00 - Medium-Voltage Electrical Distribution
· 26 20 00 - Low-Voltage Electrical Distribution
· 26 30 00 - Facility Electrical Power Generating and Storage Equipment
· 26 40 00 - Electrical and Cathodic Protection
· 26 50 00 – Lighting.
· LED TROFFERS
A. LED Recessed and Surface Mounted Troffer.
Lithonia 2GTL4 series or equivalent.
1. 1’x1’ (12” x 24”), 2’x2’ (24” x 24”), 2’x4’ (24” x 48”).
2. ≥ 85 lumens per watt (lm/W).
3. ≥ 70% of initial lumens @ 50,000 hours.
4. Color rendering index (CRI): ≥ 80
5. No visible welding, plane-protruding screws, latches, springs, hooks, rivets or plastic supports viewed from the occupied (room) side.
6. IC rated for contact with insulation.
7. Warranty, equipment, 5 years minimum.
8. Lighting system shall provide a minimum of 30 foot candles at floor level.
9. Power supplies/drivers/ballasts, LED arrays, boards or light engines shall be easily field replaceable using common hand tools (e.g. screwdrivers, pliers, etc.) and without uninstalling the luminaire.
10. Installation shall include fixture support from building structure. Fixtures shall not rest solely within ceiling grid system as means of support.
11. Electrical wiring shall be provided in electrical metallic tubing (EMT) raceway. A 4’ (48”) maximum length flexible conduit (e.g. “MC” Cable) shall be provided between fixture and EMT raceway.
· 26 60 00 - Unassigned
· 26 70 00 - Unassigned
· 26 80 00 - Unassigned
· 26 90 00 - Unassigned
DIVISION 27 Communications
· 27 00 00 - Communications.
· NETWORK DROPS
A. Outlet Box.
1. UL 514A, cadmium or zinc coated if metal, UL 514C if nonmetallic.
2. 4 Inches tall, 2-1/8 inches wide, 1-7/8 inches depth
B. Box Plate.
1. UL listed, unbreakable nylon construction with countersunk heads, blank face with color coordinated to adjacent electrical device plates.
C. Conduit.
1. UL 797, ANSI C80.3, Electrical Metallic Tubing (EMT), 3/4 inches diameter.
2. Provide plastic pull wire, minimum 200-pound force tensile strength, 36” slack at each end.
3. Provide rubber grommet over top terminated open end.
D. Fittings
1. UL 514B, zinc or cadmium plated if ferrous
VERBIAGE:
E. Rooms with drop ceilings.
1. Install outlet box with conduit installed within the finished wall to above the drop ceiling, terminated where accessible by technicians for wiring installation with a rubber grommet covering the terminated open end, include pull wire with 36” slack at both ends and cover with a blank wall plate.
F. Rooms with hard ceilings.
1. Install outlet box with conduit installed within the finished wall, through to an existing attic space, or where on a first floor with a hard ceiling to an accessible basement or crawl space. Terminated conduit where accessible by technicians for wiring installation with a rubber grommet covering the terminated open end, include pull wire with 36” slack at both ends and cover with a blank wall plate.
· EMERGENCY EXIT LIGHTING
A. Exit Light.
1. Astralite, P/N: TP-U-R-W-EM(J)
2. http://astralitelighting.com/TPU.HTML
B. Emergency Light.
1. Astralite, P/N: EU-3-LED-W
2. http://astralitelighting.com/EU3.html
C. Emergency/Exit Combo Light.
1. Astralite, P/N: EEU-3-R-W-LED
2. http://astralitelighting.com/EEU3.HTML
· 27 10 00 - Structured Cabling
· 27 20 00 - Data Communications
· 27 30 00 - Voice Communications
· 27 40 00 - Audio-Video Communications
· 27 50 00 - Distributed Communications and Monitoring Equipment
· 27 60 00 - Wireless Transceivers
· 27 70 00 - Unassigned
· 27 80 00 - Unassigned
· 27 90 00 - Unassigned
DIVISION 28 Electronic Safety and Security
· 28 00 00 - Electronic Safety and Security
· 28 10 00 - Electronic Access Control and Intrusion Detection
· 28 20 00 - Electronic Surveillance
· 28 30 00 - Electronic Detection and Alarm
· 28 40 00 - Electronic Monitoring and Control
· 28 50 00 - Unassigned
· 28 60 00 - Unassigned
· 28 70 00 - Unassigned
· 28 80 00 - Unassigned
· 28 90 00 - Unassigned
DIVISION 29 Earthwork
· 31 00 00 - Earthwork
· 31 10 00 - Site Clearing
· 31 20 00 - Earth Moving
· 31 30 00 - Earthwork Methods
· 31 40 00 - Shoring and Underpinning
· 31 50 00 - Excavation Support and Protection
· 31 60 00 - Special Foundations and Load-Bearing Elements
· 31 70 00 - Tunneling and Mining
· 31 80 00 - Unassigned
· 31 90 00 - Unassigned
DIVISION 30 Exterior Improvements
· 32 00 00 - Exterior Improvements
· 32 10 00 - Bases, Ballasts, and Paving
· 32 20 00 - Unassigned
· 32 30 00 - Site Improvements
· 32 40 00 - Unassigned
· 32 50 00 - Unassigned
· 32 60 00 - Unassigned
· 32 70 00 - Wetlands
· 32 80 00 - Irrigation
· 32 90 00 - Planting
DIVISION 33 Utilities
33.1 33 00 00 - Utilities
33.1 33 10 00 - Water Utilities
33.1 33 20 00 - Wells
33.1 33 30 00 - Sanitary Sewerage Utilities
33.1 33 40 00 - Storm Drainage Utilities
33.1 33 50 00 - Fuel Distribution Utilities
33.1 33 60 00 - Hydronic and Steam Energy Utilities
33.1 33 70 00 - Electrical Utilities
33.1 33 80 00 - Communications Utilities
33.1 33 90 00 - Unassigned
DIVISION 34 Transportation
34.1 34 00 00 - Transportation
34.1 34 10 00 - Guideways/Railways
34.1 34 20 00 - Traction Power
34.1 34 30 00 - Unassigned
34.1 34 40 00 - Transportation Signaling and Control Equipment
34.1 34 50 00 - Transportation Fare Collection Equipment
34.1 34 60 00 - Unassigned
34.1 34 70 00 - Transportation Construction and Equipment
34.1 34 80 00 - Bridges
34.1 34 90 00 - Unassigned
BOILERPLATE REQUIREMENTS
Reference to Standard Requirements
File details come from the government source that posted it. Updated .