20PW062_SOW.docx

DOCX document 46 KB Posted

Attached to
Repair Steel Deck Plates & Equipment Bay Steam Trench
Solicitation number
W911PT21Q0041
Issued by

View the file

Other files

File Type Posted
A1 - Grating Plan View.pdf PDF
W911PT21Q0041P00001 - Solicitation Amendment.pdf PDF
SITEVISIT.doc DOC document
20PW200_SOW_REV1.docx DOCX document
A2 - Cutout Plan View.pdf PDF
SOW Resources Boiler Plate.doc DOC document
edoc.pub_icri-310-2r-2013.pdf PDF
02 82 13 - WVA Asbestos Abatement.docx DOCX document
SOW - 20PW200.docx DOCX document
A1 - Site Plan - 20PW200.pdf PDF
SOW - 20PW206.docx DOCX document
S1 - Site Plan Details - 20PW206.pdf PDF
W911PT21Q0041 - Solicitation.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

Repair Concrete Overflow Pit, Grating and Ladder

AT

Watervliet Arsenal Building #136

Project #: 20PW062 Installation Management, Public Works Division Facilities Engineering (TAWV-IMP-F)

PART 1 GENERAL

SUMMARY OF WORK

1.1.1 Project Description

a. This Statement of Work (SOW) defines the effort required to repair deteriorating concrete and seal the bottom and side walls of the overflow pit. In addition, this project will include installation of a new ladder system and grating with access door.

1.1.2 Location of Work

a. The work is located in the basement of Bldg. 136, approximately as indicated. The exact location will be shown by the Contracting Officer.

1.1.3 Period of Performance

a. The contractor shall be required to (i) commence work under this contract within 7 calendar days after the date the contractor receives notice to proceed, (ii) prosecute the work diligently, and (iii) complete the entire work ready for use not later than [60] calendar days after notice to proceed was given. The time stated for completion shall include final cleanup of the premises.

1.1.4 Hours of Operation

a. Normal duty hours are 7:00 AM through 4:00 PM, Monday through Thursday, and 7:00 AM through 3:00 PM on Fridays. Federal holidays are non-work days. If a federal holiday falls on a Saturday or Sunday, the preceding Friday or following Monday is a work holiday.

SUBMITTALS

1.1.5 General Submittal Requirements

a. The contractor shall provide submittal documents via e-mail to the Contracting Officer for review and approval. Provide all physical (non-document) submittals (including but not limited to material swatches, samples, etc.) directly to the Contracting Officer for review and approval. All submittals require government approval unless otherwise explicitly stated.

b. The contractor shall reference APPENDIX A “Consolidated List of Submittals” for the complete list of required submittals.

1.1.6 Contractor Safety Plan

a. The contractor shall submit a safety plan which is specific to the work activity being performed under the scope of this project for Government review and approval.

1.1.7 Lockout / Tagout (LOTO) Acknowledgement

a. The Contractor shall sign and submit a “Lockout/Tagout (LOTO) Notification Acknowledgement Record” prior to working on or de-energizing any electrical equipment.

1.1.8 Asbestos Notification Acknowledgement Record

a. The contractor shall sign the “Asbestos Notification Acknowledgement Record” and submit this form to the Project COR prior to starting project work.

1.1.9 Project Schedule

a. The contractor shall create a project schedule and submit for Government review and approval.

b. The project schedule shall detail the phases of work and the overall timeline for the execution of the work. The contractor shall include delivery dates, appropriate milestones, and shall clearly detail any requirements for work performed outside of regular hours of operation.

GENERAL REQUIREMENTS

1.1.10 Watervliet Arsenal Information for Contractors (WAIC)

a. The contractor shall perform all work in strict conformance with Watervliet Arsenal Instructions for Contractors (WAIC). The contractor shall read and understand this document prior to submitting a proposal. The WAIC is publically available at:

<http://www.wva.army.mil/Documents/Contracting/WAIC.pdf>

1.1.11 Utility Outage Requests and Utility Connection Requests

a. Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, coordinate schedule with COR. Schedule utility outages and connections to minimize disruptions to the Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.

b. The contractor shall notify the Contracting Specialist a minimum of two (2) business days before the contractor starts work. The contractor shall notify the COR a minimum of seven (7) business days before the shut-down of a utility or building service.

1.1.12 Safety Requirements

a. The contractor is required to provide the proper control of hazardous energy (lockout/tagout) per OSHA 29 CFR 1910.147.

b. The contractor shall inspect the project work site prior to starting work, and shall request a copy of the asbestos building inspection records to verify the location and description of known asbestos-containing materials.

ON-SITE PERMITS

1.1.13 Excavation (Dig Permit)

a. The clearance of buried utilities will be performed by the Government in advance of the Contractor performing subsurface work, unless otherwise explicitly stated.

b. The Contractor shall obtain a copy of the completed Utility Clearance Permit (WVA Form 420-2-E) from the COR prior to performing subsurface work. Verify existing utility locations indicated on contract drawings, within area of work.

1.1.14 Hot Work and Confined Space

a. Obtain permit for welding, burning, use of flame, or entry into confined space from WVA Fire Department by calling (518)266-5990 each day the permit is to be used.

APPLICABLE DOCUMENTS

1.1.15 Drawings

a. The following drawings accompany this Statement of Work and are a part thereof.

i. A1 – Grating Plan View

ii. A2 – Cutout Plan View

1.1.16 References

a. The following references accompany this Statement of Work and are a part thereof.

i. Watervliet Arsenal Instructions for Contractors (WAIC).

ii. NFPA 70 – National Electric Code (NEC).

iii. AASHTO (American Association of State Highway and Transportation Officials) Standard Specifications For Highway Bridges ANSI/NAAMM MBG 532

CONTRACTOR EQUIPMENT

1.1.17 Equipment Identification

a. The contractor shall create and affix a label to all large equipment, dumpsters, and other mobilized property, which is weather-resistant (laminated, or within a see-thru label hanger), securely affixed to the equipment or visible through a window, and which clearly displays the General Contractor’s:

i. Company Name, POC Name (first, last), POC phone number, Project Number.

1.1.18 Waste Dumpster

a. The contractor shall place any waste dumpsters in a manner that does not interfere with thru-traffic.

b. Place waste dumpsters with a minimum of 33’ clearance from any building. The final location shall be coordinated with, and approved by the COR before any dumpsters are mobilized.

c. Cover all waste dumpsters when not in use, and before the end of each work shift. The cover shall be weather-tight.

d. The Contractor shall submit all Bills of Lading and Weight Slips associated with the disposal of all construction and demolition (C&D) debris to the Contracting Officer on a monthly basis. The contractor shall provide this information within ten (10) days of disposal of the waste.

PART 2 PRODUCTS

GENERAL

All work shall be in strict accordance with product manufacturer’s instructions and specifications, including but not limited to manufacturer guidance for storage, staging, application, installation, and disposal of the product.

2.1.1 Hazardous Materials

a. The contractor shall submit Safety Data Sheets (SDS) for all hazardous materials to be used.

2.1.2 Asbestos, Mercury, Lead, PCB

a. Unless otherwise stated, all materials for this project shall be new. All products shall not contain any asbestos, mercury, chromium/lead paint, Class I Freon, and Polychlorinated Biphenyls (PCB), and shall state such on the manufacturer’s original packaging.

2.1.3 DoD Green Procurement Program

a. All construction materials shall meet the applicable requirements of the DoD Green Procurement Program, specifically recycled content products, environmentally preferable products and services, biobased products, energy-and water-efficient products, alternate fuel vehicles and alternative fuels, products using renewable energy, and alternatives to hazardous or toxic chemicals as found at <http://www.acq.osd.mil/dpap/cpic/cp/docs/USA001967-08-DPAP.pdf>.

2.1.4 Paint

a. To meet the Affirmative Procurement Program (Federal Government’s Buy Recycled Requirements) all paint used in the project shall adhere to the below listed requirements of the Comprehensive Procurement Guideline for recovered materials. This applies only to interior latex paint, only if available at the time of the project.

i. Reprocessed Latex Paint (White, Off-White, Pastel Colors) shall contain 20% Post consumer content.

ii. Reprocessed Latex Paint (Grey, Brown Earth tones, and Other Dark Colors) shall contain 50-99% Post consumer content.

iii. Consolidated Latex Paint shall contain 100% Post consumer content.

PRODUCTS

2.1.5 Lining System Material

a. General:

i. Non-porous, epoxy-based coating material explicitly manufactured as a structural lining.

ii. Once cured, lining system shall seal against 100% of infiltration and exfiltration.

iii. Solvent VOC shall be 0% (none) IAW ASTM D3960.

iv. Tensile bond to concrete shall be minimum 525 PSI.

v. Tensile strength shall be minimum 8,900 PSI IAW ASTM D638.

vi. System shall have “excellent” chemical compatibility with:

i. Alkyl Amine (methylamine, ethanolamine/2-aminoethanol)

ii. Operating temperatures up to 180 degrees Fahrenheit

b. Manufacturer:

i. Epoxytec – CPP (Concrete Polymer Paste) or equivalent as proposed by Contractor and approved by COR.

2.1.6 Non-metallic Fixed Access Ladder

a. General:

i. Non-metal, corrosion resistant

ii. OSHA regulation compliant

iii. Shall be yellow in color

b. Manufacturer:

i. National Grating FRP Solutions Fiberglass ladders or equivalent as proposed by Contractor and approved by COR.

2.1.7 Bar Grating

a. General:

i. 19W4 Carbon Steel

ii. Heavy Duty Welded

iii. Smooth Surface, 1-1/2”

iv. 1-1/2” x ¼” Bar Size

v. 1-3/16” Bearing Bar Spacing

vi. 4” Cross Bar Spacing

vii. Galvanized per ASTM A-123 or A-385

PART 3 EXECUTION

ITEMS OF WORK

3.1.1 General Requirements.

a. The work covered by this document consists of furnishing all equipment, materials, labor and performing all operations required for concrete repairs as directed.

b. The Contractor is required to review the project site, obtain and/or verify all measurements and project data required to perform the project work. Information shown on project plan(s) is of a graphical nature. Precise locations and actual sizes must be verified.

c. The Contractor shall review all contract documents and provide written notice to the Project Engineer and Contracting Officer of any discrepancies that are found prior to bid submission.

d. The Contractor shall submit with their bid, at least three job references where the Contractor has successfully completed similar applications/repairs.

e. All materials shall be delivered to the jobsite in their original, unopened packages, clearly labeled with the manufacturer's identification, printed instructions and batch code. Contractor shall store and condition the specified products as per the appropriate product data sheet.

f. All work shall be performed in accordance with the applicable safety and health standards, the contract, and these specifications. Adequate ventilation shall be provided and maintained at all times during use of monomeric materials and solvents. Fans used for ventilating shall be explosion proof. If necessary, respirators that filter organic fumes and mists shall be worn. All contaminated materials such as wipes, empty containers, and waste material shall be continually deposited in containers that are protected from spillage. Spillage shall be immediately and thoroughly cleaned up and disposed of in accordance with applicable regulations.

3.1.2 Repair Concrete.

a. The Contractor shall install a protective coating/lining solution to all surfaces of the pit to protect against infiltration and exfiltration. Chosen material shall be a two‐component moisture insensitive, highly adhesive, chemical resistant, 100% solids, high strength and reinforced structural‐grade epoxy. Prior to coating/liner application, the Contractor shall remove and patch roughly 200 square feet of loose, delaminated and weak concrete.

b. The Contractor shall use all means and precautions necessary to insure the safety of the occupants and protection to the existing building infrastructure (to include but not limited to the sump pump, piping, and conduit) during demolition and surface preparation operations.

c. The Contractor shall install necessary barricades and enclosure to contain particles and vapors from migrating into other areas of the building, and to protect and control construction traffic. Efforts shall be made to create a barrier that effectively prevents air-borne pollutants from moving from the work area to another adjacent area within the building. To increase the effectiveness of the barrier, physical barriers can be used, such as plastic sheeting.

d. The Contractor shall be responsible to remove all of the accumulated water from within the pit prior to proceeding with any work. Provisions will be made with “Boiler Plant” personnel to ensure water is NOT drained into the pit after work commences.

e. The Contractor shall completely remove all oil, grease, dust, curing compounds, waxes, laitance and other contaminants from all horizontal and vertical surfaces to come in contact with the material. Contractor shall prepare concrete in accordance with the manufacturer’s recommendations, and using acceptable mechanical means as necessary to obtain clean, sound and profiled concrete. Contractor shall prepare concrete in accordance with SSPC-SP 13/NACE No. 6 “Surface Preparation of Concrete.”

f. The Contractor shall remove all rust, corrosion, and bonded concrete from any exposed reinforcing steel. As a minimum, the steel shall be cleaned to remove all loose or poorly bonded debris that would affect bond between the repair material and reinforcing steel. To prevent flash rusting, the Contractor shall use a recommended holding primer. It is estimated that this will be required for 60 square feet of the overall repair.

g. After the concrete has been prepped and cleaned, it shall remain in a clean, dry condition until the repair has been completed. Any contamination, including oil, solvent, dirt accumulation, or foreign material shall be removed by additional cleanup.

h. Surface and material temperatures shall be kept within the requirements for the selected product during and after product application, until product is cured.

i. Placing of protective coating/lining solution shall be in the presence of the Project COR or a designated representative. Placement shall NOT begin until all preparation is complete and the COR or authorized representative has approved the conditions.

3.1.3 Replace Grating and Ladder.

a. The Contractor shall avoid creating a safety issue by having an open trench for an extended period of time. Therefore, the existing deformed bar grating shall remain intact until it can be exchanged.

b. The Contractor shall furnish and install new Heavy Duty Welded Grating in its place. Grating and associated components shall be installed in accordance with manufacturer’s instructions. Contractor shall provide shop drawings showing plans, elevations and details of sections and connections to include type and location of fasteners.

i. Inspection:

i. Contractor shall take field measurements prior to preparation of shop drawings.

ii. Contractor shall verify opening locations, opening sites, and dimension tolerances are acceptable.

iii. Contractor shall verify grating dimensions.

iv. Contractor shall inspect surfaces, supports, and anchors on which grating is to be mounted and secured.

v. Contractor shall verify supports and anchors are properly located and oriented.

vi. Contractor shall correct defects prior to installation of grating.

ii. Installation:

i. Grating shall be installed with cross-rods on top side to achieve strength specifications.

ii. Bearing bars and cross bars shall be continuous.

iii. Minimum clearance between grating and support shall be equal to the support angle thickness.

iv. Exposed ends of grating bearing bar shall be banded with a bar of the same depth and thickness as the main bearing bars. Contractor shall weld cut bar(s) to band bar.

v. Contractor shall provide cutouts in grating for existing conduits, pipes, and other penetrations (total of 8). Edges of cutouts shall be banded. Cutouts for circular obstructions are recommended to be at least 2 inches larger in diameter than the obstruction. It is further recommended that cutouts for all piping 4 inches or less in diameter be made in the field. Important Note: Contractor shall disconnect and re-connect piping/conduit as required to install grating. Method of re-attachment shall be approved by the Project COR or a designated representative.

vi. Contractor shall grind rough weld beads and sharp metal edges smooth.

vii. Contractor shall fabricate grating in sections, which do not exceed 100 pounds each.

viii. Contractor shall touch-up and repair hot-dipped galvanized coating disturbed during this work in accordance with ASTM A780, Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings, to maintain uniform barrier and cathodic protection as well as ensure longevity.

ix. Contractor shall place grating in correct position and ensure it is plumb and level, with no trip hazards present.

x. Contractor shall secure grating in place using saddle clips or similar type of fastener to prevent movement.

xi. When finished, the Contractor shall clean paint spatter, concrete slobber, grease, oil or any other debris from exterior surface of grating.

c. The Contractor shall create a 30” x 30” hinged access hatch in the new grating system; comparable to the existing concept. Contractor shall band the two (2) unsupported edges using 1/2” x 3 ” A-36 galvanized steel flat bar. Steel shall be trimmed as required to sit flush on the perimeter angle steel.

d. To protect against galvanic corrosion from dissimilar metals, the Contractor shall apply a minimum of two coats of “Safety Yellow” paint to the existing angle support steel. Paint shall be POR15, 46304, or equivalent.

i. All paint shall be new and applied in accordance with the manufacturer’s requirements. The application shall be performed with no signs of deterioration.

ii. All surfaces shall receive a uniform coating with each layer. This is to include edges and corners. The dried coat shall be free of runs, waves, brush marks, voids, and variations in color, texture, and finish.

e. The Contractor shall carefully remove the existing metal ladder and associated hardware from the east wall of the pit, and replace it with a new FRP fiberglass composite ladder system.

i. Contractor shall install the new ladder in accordance with all of the manufacturer’s recommendations.

ii. Contractor shall make certain there is an adequate, level landing where the ladder will be installed.

iii. Contractor shall use appropriate precautions while lifting and setting the new ladder into position.

iv. Contractor shall not climb ladder in any manner until it is firmly secured at the top and bottom.

v. When fully assembled, the new ladder and accessories should have no unfilled bolt holes.

vi. Contractor shall perform a routine inspection prior to closeout, carefully checking tightness of nuts and bolts, and looking for signs of damage.

CLOSEOUT REQUIREMENTS

3.1.4 Construction and Demolition Debris

a. The Contractor shall submit copies of all Bills of Lading and Weight Slips associated with the disposal of construction and demolition (C&D) debris and/or recycled materials, under this scope of work. Submit documentation per Appendix A, “Consolidated List of Submittals”.

3.1.5 Cleanup of Work Site

a. The contactor shall clean all work areas and remove all tools, equipment, debris, materials, and all waste from the premises.

b. The contractor shall remove all debris from any remote holding locations, to include any excavation and concrete equipment chute cleanout debris.

c. The contractor shall remove their equipment from Watervliet Arsenal premises within five (5) working days after completion of project work.

3.1.6 Restoration of Work Site

a. The contractor shall repair any items, building surfaces, equipment or miscellaneous items which were damaged during the execution of this SOW. Items that cannot be repaired to restore original function or aesthetics shall be replaced in kind by the Contractor at no additional charge to the Government.

b. Grass, trees, and other vegetation affected by project work shall be restored to same or better condition as existed prior to the start of project work. The Contractor shall prepare the affected areas to eliminate uneven areas and low spots. Remove foreign materials, weeds, and damaged soil. The Contractor shall scratch the area to a depth of three (3) inches where topsoil is to be placed. Spread topsoil to a uniform, compacted depth of less than five (5) inches over areas to be reseeded. Rake until smooth. The Contractor shall seed, fertilize, and water the area to establish grass.

3.1.7 Warranty

a. The contractor shall provide a [1] year warranty on materials and workmanship.

PART 4 APPENDICES

a. Consolidated List of Submittals

b. Quality Assurance Surveillance Plan (QASP)

c. A1 – Grating Plan View

d. A2 – Cutout Plan View

APPENDIX A: Consolidated List of Submittals

Line
Item Submitted
Submittal Needed By
Submittal Reviewed By (Office)
1
Safety Data Sheets for Hazardous Materials (SDS)
NLT 7 Calendar Days After Award
Safety Office
2
Signed Contractor Asbestos Notification Form
NLT 7 Calendar Days After Award
Environmental Office
3
Signed Lockout/Tagout (LOTO) Notification Acknowledgement Record
NLT 7 Calendar Days After Award
Safety Office
4
Project Schedule
NLT 7 Calendar Days After Award
COR
5
Contractor Safety Plan
NLT 7 Calendar Days After Award
COR
6
Bills of Lading, Dump Slips for C&D Debris and Recycled Materials
Within 10 calendar days of disposal of any waste
Environmental Office
7
Bar Grating Shop Drawings & Cut Sheet
NLT 7 Calendar Days After Award
COR
8
Concrete Product Data
NLT 7 Calendar Days After Award
COR
9
Coating/Liner System Product Data
NLT 7 Calendar Days After Award
COR
10
Ladder Cut Sheet
NLT 7 Calendar Days After Award
COR
11
Paint Product Data
NLT 7 Calendar Days After Award
COR

APPENDIX B: Quality Assurance Surveillance Plan (QASP)

PURPOSE

This Quality Assurance Surveillance Plan (QASP) will be used as a guide to Government Quality Assurance Personnel (QAP). It provides a systematic method to evaluate the services the contractor is required to furnish.

SURVEILLANCE PROCEDURES

Timeliness: Progress is maintained to assure compliance with completion time.

Quality: Conformance with statement of work and industry standards.

Tasks: Performed according to statement of work requirements.

Problem Resolution: Contractor submits deliverables in accordance with the contract and resolves any deficiencies identified by the government in the final submission. Following final submission, contractor resolves any additional deficiencies identified by the government and resubmits and or corrects within one week.

Delivery: Contractor submits each deliverable in accordance with the statement of work and terms of the contract.

PERFORMANCE AREAS

Management Responsiveness: Evaluate the adequacy of the contractor’s responsiveness and their ability to keep the government informed of work progress and provides for early problem identification and effective corrective action plans.

Schedule Control: Evaluate the contractor’s adherence to completion schedule.

Performance: The contractor will be evaluated as to the workmanship and adherence to the statement of work.

EVALUATION CRITERIA

(Outstanding). Indicates performance clearly exceeds contractual requirements. The area of evaluation contains few minor problems for which corrective actions appear highly effective.

(Satisfactory). Indicates performance clearly meets contractual requirements. The area of evaluation contains some minor problems for which the corrective actions appear satisfactory.

(Unsatisfactory). Indicates the contractor failed to satisfy contractual requirements and recovery is not likely in a timely manner. The area of evaluation contains serious problems for which the corrective actions were ineffective.

DOCUMENTATION

Documentation used to perform surveillance will consist of random government inspections and inspection records, as well as the evaluation of final work product delivery by the project COR/COTR.

RATING

Contractor will be given an overall rating of Outstanding, Satisfactory, or Unsatisfactory by the Government Technical point of contact or Contracting Specialist Representative, if appointed, using the above 3 evaluation criteria.