Attachment_0001_-_Pricing_Matrix_Final.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- Watervliet (WVA) Construction MATOC Federal contract opportunity
- Solicitation number
- W911PT-19-R-0003
About this file
Attachment 0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WVA_MATOC_Q&A_-_Posted_on_2-28-19.pdf | ||
| WVA_MATOC_Q&A_-_Posted_on_2-22-19.pdf | ||
| WVA_MATOC_Q&A_-_Posted_on_2-19-19.pdf | ||
| WVA_MATOC_Q&A_Posted_2-14-19.pdf | ||
| WVA_MATOC_Q&A_Posted_2-13-19.pdf | ||
| Attachment_0002-PPQ_Final.doc | DOC document | |
| W911PT-19-R-0003_0001.pdf | ||
| Attachment_0003_-_Offeror_Checklist.xlsx | XLSX spreadsheet | |
| Attachment_0003_-_Offeror_Checklist.xlsx | XLSX spreadsheet | |
| W911PT-19-R-0003.pdf | ||
| Attachment_0002-PPQ_Final.doc | DOC document | |
| Attachment_0004_-_Visistor_Request_Form.pdf | ||
| Attachment_0005_-_Wage_Determination.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Instructions |
| 1. Cells that require inputs are highlighted in yellow |
| 2. All cells highlighted in yellow on each tab must be completed |
| 3. Do not adjust formulas or otherwise manipulate any of the non-yellow highlighted cells |
| 4. Do not alter or make changes to this attachment except for inputting values in those cells highlighted in yellow |
| 5. For evaluation purposes, all dollar amounts proposed will be displayed as rounded to the nearest $0.01 |
| 6. For labor categories subject to the Davis Bacon Act, the Government has provided the Davis Bacon Act (DBA) Wage Determination (WD) Number and Occupational Code within Tabs “Ordering Period (OP) 1” through “OP 5” of this attachment. For those labor categories subject to the Davis Bacon Act (i.e. it has a DBA WD Number and Occupational Code associated with it), the offeror is required to propose direct labor rates and fringe at or above the rates contained within the prevailing wage determination for each locality. For the purpose of evaluation only, assume the DBA wages will remain constant for all ordering periods. |
For proposal purposes, utilize RFP Attachment 0005 for the prevailing Davis Bacon Act wage determinations for each locality.
Summary
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Summary |
Offeror Name Enter Date Completed
| Item | Proposed Price |
| Labor - Ordering Period 1 | $0.00 |
| Labor - Ordering Period 2 | $0.00 |
| Labor - Ordering Period 3 | $0.00 |
| Labor - Ordering Period 4 | $0.00 |
| Labor - Ordering Period 5 | $0.00 |
| Material | $16,400,000.00 |
| Total Evaluated Price | $16,400,000 |
Ordering Period (OP) 1
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 1 (OP 1) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Laborers: Building: Group 1 | NY2 | LABO0190-001 | 4,500 | $0.00 | $0.00 | ||
| Laborers: Building: Group 2 | NY2 | LABO0190-001 | 8,000 | $0.00 | $0.00 | ||
| Carpenter: Building Construction - Carpenters & Soft Floor Layers | NY2 | CARP0291-008 | 3,900 | $0.00 | $0.00 | ||
| Carpenter: Heavy & Highway Construction - Carpenters | NY2 | CARP0291-008 | 2,000 | $0.00 | $0.00 | ||
| BRICKLAYER: Heavy & Highway Construction - Cement Masons | NY2 | BRNY0002-019 | 750 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast - Painters, Drywall Finishers, Spray (Zone 1) | NY2 | PAIN0201-001 (Zone 1) | 6,000 | $0.00 | $0.00 | ||
| Electrician | NY2 | ELEC0236-001 | 7,000 | $0.00 | $0.00 | ||
| Elevator Constructor (Over 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Elevator Constructor (Under 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Power equipment operators: Group A (1) | NY2 | ENGI0106-002 (Group A (1)) | 250 | $0.00 | $0.00 | ||
| Roofer | NY2 | ROOF0241-001 | 750 | $0.00 | $0.00 | ||
| Sheet Metal Worker | NY2 | SHEE0083-001 | 250 | $0.00 | $0.00 | ||
| Sprinkler Fitter | NY2 | SFNY0669-001 | 500 | $0.00 | $0.00 | ||
| Plumber/Pipefitter | NY2 | PLUM0773-002 | 500 | $0.00 | $0.00 | ||
| Hazardous Material Handler | NY2 | ASBE0040-002 | 1,000 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | NY2 | TEAM0294-002 | 100 | $0.00 | $0.00 |
36,000 Total Labor - Ordering Period 1 $0.00
OP 2
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 2 (OP 2) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Laborers: Building: Group 1 | NY2 | LABO0190-001 | 3,000 | $0.00 | $0.00 | ||
| Laborers: Building: Group 2 | NY2 | LABO0190-001 | 7,650 | $0.00 | $0.00 | ||
| Carpenter: Building Construction - Carpenters & Soft Floor Layers | NY2 | CARP0291-008 | 3,000 | $0.00 | $0.00 | ||
| Carpenter: Heavy & Highway Construction - Carpenters | NY2 | CARP0291-008 | 2,000 | $0.00 | $0.00 | ||
| BRICKLAYER: Heavy & Highway Construction - Cement Masons | NY2 | BRNY0002-019 | 750 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast - Painters, Drywall Finishers, Spray (Zone 1) | NY2 | PAIN0201-001 (Zone 1) | 3,000 | $0.00 | $0.00 | ||
| Electrician | NY2 | ELEC0236-001 | 5,500 | $0.00 | $0.00 | ||
| Elevator Constructor (Over 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Elevator Constructor (Under 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Power equipment operators: Group A (1) | NY2 | ENGI0106-002 (Group A (1)) | 250 | $0.00 | $0.00 | ||
| Roofer | NY2 | ROOF0241-001 | 5,500 | $0.00 | $0.00 | ||
| Sheet Metal Worker | NY2 | SHEE0083-001 | 250 | $0.00 | $0.00 | ||
| Sprinkler Fitter | NY2 | SFNY0669-001 | 500 | $0.00 | $0.00 | ||
| Plumber/Pipefitter | NY2 | PLUM0773-002 | 500 | $0.00 | $0.00 | ||
| Hazardous Material Handler | NY2 | ASBE0040-002 | 1,000 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | NY2 | TEAM0294-002 | 100 | $0.00 | $0.00 |
33,500 Total Labor - Ordering Period 2 $0.00
OP 3
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 3 (OP 3) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Laborers: Building: Group 1 | NY2 | LABO0190-001 | 4,500 | $0.00 | $0.00 | ||
| Laborers: Building: Group 2 | NY2 | LABO0190-001 | 8,500 | $0.00 | $0.00 | ||
| Carpenter: Building Construction - Carpenters & Soft Floor Layers | NY2 | CARP0291-008 | 3,400 | $0.00 | $0.00 | ||
| Carpenter: Heavy & Highway Construction - Carpenters | NY2 | CARP0291-008 | 2,500 | $0.00 | $0.00 | ||
| BRICKLAYER: Heavy & Highway Construction - Cement Masons | NY2 | BRNY0002-019 | 1,000 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast - Painters, Drywall Finishers, Spray (Zone 1) | NY2 | PAIN0201-001 (Zone 1) | 4,500 | $0.00 | $0.00 | ||
| Electrician | NY2 | ELEC0236-001 | 5,500 | $0.00 | $0.00 | ||
| Elevator Constructor (Over 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Elevator Constructor (Under 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Power equipment operators: Group A (1) | NY2 | ENGI0106-002 (Group A (1)) | 250 | $0.00 | $0.00 | ||
| Roofer | NY2 | ROOF0241-001 | 1,500 | $0.00 | $0.00 | ||
| Sheet Metal Worker | NY2 | SHEE0083-001 | 250 | $0.00 | $0.00 | ||
| Sprinkler Fitter | NY2 | SFNY0669-001 | 500 | $0.00 | $0.00 | ||
| Plumber/Pipefitter | NY2 | PLUM0773-002 | 500 | $0.00 | $0.00 | ||
| Hazardous Material Handler | NY2 | ASBE0040-002 | 1,000 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | NY2 | TEAM0294-002 | 100 | $0.00 | $0.00 |
34,500 Total Labor - Ordering Period 3 $0.00
OP 4
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 4 (OP 4) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Laborers: Building: Group 1 | NY2 | LABO0190-001 | 4,500 | $0.00 | $0.00 | ||
| Laborers: Building: Group 2 | NY2 | LABO0190-001 | 8,000 | $0.00 | $0.00 | ||
| Carpenter: Building Construction - Carpenters & Soft Floor Layers | NY2 | CARP0291-008 | 3,500 | $0.00 | $0.00 | ||
| Carpenter: Heavy & Highway Construction - Carpenters | NY2 | CARP0291-008 | 2,000 | $0.00 | $0.00 | ||
| BRICKLAYER: Heavy & Highway Construction - Cement Masons | NY2 | BRNY0002-019 | 1,000 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast - Painters, Drywall Finishers, Spray (Zone 1) | NY2 | PAIN0201-001 (Zone 1) | 3,400 | $0.00 | $0.00 | ||
| Electrician | NY2 | ELEC0236-001 | 5,500 | $0.00 | $0.00 | ||
| Elevator Constructor (Over 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Elevator Constructor (Under 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Power equipment operators: Group A (1) | NY2 | ENGI0106-002 (Group A (1)) | 250 | $0.00 | $0.00 | ||
| Roofer | NY2 | ROOF0241-001 | 1,500 | $0.00 | $0.00 | ||
| Sheet Metal Worker | NY2 | SHEE0083-001 | 250 | $0.00 | $0.00 | ||
| Sprinkler Fitter | NY2 | SFNY0669-001 | 500 | $0.00 | $0.00 | ||
| Plumber/Pipefitter | NY2 | PLUM0773-002 | 500 | $0.00 | $0.00 | ||
| Hazardous Material Handler | NY2 | ASBE0040-002 | 1,000 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | NY2 | TEAM0294-002 | 100 | $0.00 | $0.00 |
32,500 Total Labor - Ordering Period 4 $0.00
OP 5
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Ordering Period 5 (OP 5) |
| Offeror Name | |||||||
| Direct Labor Category Description | Davis Bacon Act (DBA) Wage Determination (WD) Number | Offeror's Occupational Code or Position Description | Estimated Hours | Direct Labor | |||
| ($ per hour) | Fringe | ||||||
| ($ per hour) | Other Indirect Labor | ||||||
| ($ per hour) | Profit | ||||||
| ($ per hour) | Employee Fully Burdened Pay | ||||||
| ($ per hour) | Total Extended Price | ||||||
| Laborers: Building: Group 1 | NY2 | LABO0190-001 | 4,000 | $0.00 | $0.00 | ||
| Laborers: Building: Group 2 | NY2 | LABO0190-001 | 8,000 | $0.00 | $0.00 | ||
| Carpenter: Building Construction - Carpenters & Soft Floor Layers | NY2 | CARP0291-008 | 3,000 | $0.00 | $0.00 | ||
| Carpenter: Heavy & Highway Construction - Carpenters | NY2 | CARP0291-008 | 2,000 | $0.00 | $0.00 | ||
| BRICKLAYER: Heavy & Highway Construction - Cement Masons | NY2 | BRNY0002-019 | 1,000 | $0.00 | $0.00 | ||
| Painters: Spray/Sandblast - Painters, Drywall Finishers, Spray (Zone 1) | NY2 | PAIN0201-001 (Zone 1) | 3,400 | $0.00 | $0.00 | ||
| Electrician | NY2 | ELEC0236-001 | 5,500 | $0.00 | $0.00 | ||
| Elevator Constructor (Over 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Elevator Constructor (Under 5 years experience) | NY2 | ELEV0035-001 | 250 | $0.00 | $0.00 | ||
| Power equipment operators: Group A (1) | NY2 | ENGI0106-002 (Group A (1)) | 250 | $0.00 | $0.00 | ||
| Roofer | NY2 | ROOF0241-001 | 1,500 | $0.00 | $0.00 | ||
| Sheet Metal Worker | NY2 | SHEE0083-001 | 250 | $0.00 | $0.00 | ||
| Sprinkler Fitter | NY2 | SFNY0669-001 | 500 | $0.00 | $0.00 | ||
| Plumber/Pipefitter | NY2 | PLUM0773-002 | 500 | $0.00 | $0.00 | ||
| Hazardous Material Handler | NY2 | ASBE0040-002 | 1,000 | $0.00 | $0.00 | ||
| Truck Drivers: Group 1 | NY2 | TEAM0294-002 | 100 | $0.00 | $0.00 |
31,500 Total Labor - Ordering Period 5 $0.00
Material
| Solicitation: W911PT-19-R-0003 |
| Attachment 0001 - Pricing Matrix |
| Material |
Offeror Name
| Material | Rate | Dollars |
| Direct Material Cost | $16,400,000.00 | |
| Indirect Rate (to include material handling, overhead, G&A, etc.) | $0.00 | |
| Profit | $0.00 | |
| Total Material Price | $16,400,000.00 |