W911PT-19-B-0001-0003.pdf

PDF 395 KB Posted

Attached to
Painting and Bathroom Renovations at B35
Solicitation number
W911PT-19-B-0001
Issued by

About this file

Amendment 0003

View the file

Other files

File Type Posted
W911PT-19-B-0001-0002.pdf PDF
W911PT-19-B-0001-0001.pdf PDF
Photos_(Representative_of_conditions).pdf PDF
Bathrooms_(New)_Photos.pdf PDF
Updated_Drawings_Building_35_8_16_2019.pdf PDF
Drawings_Bldg_35_Paint_Package.pdf PDF
SOW___7PW129_Complete_Rev_1_August.pdf PDF
W911PT-19-B-0001.docx DOCX document
NY20190001_DATED_5.10.2019.pdf PDF
Specifications_Combined_7PW129.docx DOCX document
Updated_Drawings_Building_35.pdf PDF
SITEVISIT.doc DOC document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W16H1F911300VM 7PW129

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment is issued for conclusion of the RFIs received as of 3 September 2019.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911PT19B0001

X 9B. DATED (SEE ITEM 11)

08-Aug-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2019

CODE

ARMY CONTRACTING COMMAND-WARREN (WVA)

ATTN: CCTA-HDW/BLDG 10

1 BUFFINGTON STREET

WATERVLIET NY 12189-4000

W911PT 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911PT19B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFI #3

RFIs #3 Dated 3 September 2019

Q1. Room 000/001 (& Room 007) Note 10 indicates there is a lintel schedule but I could not find one. Can that be provided so we know what size and type of lintel to include in our pricing?

A. Provide (2) L 3 1/2 x 3 1/2 x 5/16 FOR SPANS UP TO 4'-0

Q2. In room 008, there were some sections of tile wall that were missing and there was a void that went down below the floor with piping in it. Should this be included in the patch and repairing of the walls for new epoxy finish?

A. Yes, include repairing wall with epoxy finish

Q3. Room 007 and 008 partitions are not called out. Please specify.

A. Partitions for stalls are similar to ASI global partitions material style is Black –Core Phenolic, color to be selected by COR

Q4. Room 007 does not show a wall type to rebuild where the plumbing is installed. Please specify.

A. 3-5/8” metal studs 20 ga. @16 “ oc. With 5/8” moisture board

Q5. Room 008, eye wash station states to remove and reattach to new plumbing but no new plumbing is shown.

A. Contractor will need to reconnect existing plumbing.

Q6. Room 108, note 4, states to remove all lockers. No lockers are shown as new in this room. Are we to remove all lockers and install new or remove only the lockers under note 13?

A. All lockers to be removed and replaced, areas with hatch included will have to remove concrete base.

Q7. Room 108 note 14 calls for existing duct to be removed and modified to go above new ceiling. Is all duct in this bathroom being removed and raised up above the ceiling or is it just the taps that went into the hard ceiling being relocated above the ceiling to be able to fit within the ceiling grid?

A. Contractor shall Raise and modify so duct work is above the new ceiling

Q8. Rooms 116/117A show epoxy and tile on the same wall. The detail only shows tile on the bathroom wall and paint above the locker in the locker room. Does the tile go to the ceiling height as shown on detail A2/1B?

Was answered in first group of RFIs but the answer is confusing. Please clarify.

A. Contractor will epoxy over surface to tile height adjacent, if not 8’-0” Above Finish Floor

Q9. Rooms 007/008 – DWG P1, please confirm that the lavatory next to the HW is an ADA sink as dwg A3 elevation shows all sinks being L-1.

A. Yes, confirmed ADA.

Q10. The wall tile in rooms 116/117 are just shown on elevations. Is there a material selection for that, or similar to what is spec’d out for the other rooms (12x24)?

W911PT19B0001

A. Contractor shall provide 5/8” moisture board with epoxy finish on the drywall.

(End of Summary of Changes)

File details come from the government source that posted it.