Appendix_I,_DA_Form_3943_-_Annual_Dry_Pipe_Valve_Inspection_and_Tripping....pdf
PDF 26 KB Posted
- Attached to
- Fire Suppression IT&M Federal contract opportunity
- Solicitation number
- W911PT-18-Q-0046
About this file
Appendix I
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Appendix_H,_Estimated_Work_Load_Data_Sheet.doc | DOC document | |
| Appendix_B,_QASP.DOC | DOC document | |
| Appendix_A,_Contractor_Asbestos_Notification_Record.doc | DOC document | |
| Appendix_C_-_G.PDF | ||
| Appendix_J,_DA_Form_4005_-_Automatic_Sprinkler_&_Standpipe_Equipments_In....pdf | ||
| 172120002_(SOW).docx | DOCX document | |
| SCSL_15-4143_REV_9.pdf | ||
| W911PT-18-Q-0046.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(USE REVERSE SIDE FOR REMARKS EXPLAINING FAULTY CONDITIONS)
MAIN DRAIN TEST MADE
YES NO
PROTECTION RESTORED AFTER TEST (If not, why?)
YES NO
TEST SATISFACTORY (If not, why?)
YES NO
VALVE RECEIVING GOOD CARE AND ATTENTION
YES NO
III - GENERAL DATA
II - CONDITION OF VALVE
TEST SATISFACTORY (If not, why?)
YES NO
TYPE
WATER MOTOR ELECTRIC LOCAL CENTRAL
ALARM
TEST SATISFACTORY (If not, why?)
YES NO
ACCELERATOR OR EXHAUSTER
DID VALVE LEAK AT ANY POINT WHEN TRIPPED (If so, where?)
YES NO
VALVE TESTED WITH
ACCELERATOR EXHAUSTER
CONTROLLING VALVE (During Test)
WIDE CRACKED OPEN SHUT
TEST DATA
I - DRY PIPE VALVE
For use of this form, see TM 5-695; the proponent agency is Office of the Chief of Engineers.
ANNUAL DRY PIPE VALVE INSPECTION AND TRIPPING TEST
DA FORM 3943, OCT 72 REPLACES DA FORM 5-118, 1 APR 47, WHICH WILL BE USED. USAPPC V1.00
NO. OF SPRINKLERS ON SYSTEM
DATE
BUILDING NO. SYSTEM NO. VALVE NO.
MANUFACTURER
SIZE
AIR PRESSURE AT LEAK POINT AIR PRESSURE AT TRIP POINT
TIME TO TRIP TIME TO GET WATER TO INSPECTOR'S TEST VALVE
MANUFACTURER
TYPE OR MODEL YEAR MFG.
GENERAL CONDITION
INSTALLATION
TYPE OR MODEL YEAR MFG.
LOCATION INSPECTOR
AIR PRESSURE WATER PRESSURE
VALVE FACE AND SEAT RINGS CORROSION OR INCRUSTATION
VALVE TRIPPED OR OPENED (By whom) VALVE RE-SET (By whom)
WAS INSPECTOR'S GAUGE USED OR CORRECTIONS MADE FOR GAUGE ERRORS?
File details come from the government source that posted it.